Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct open mine pit surveying
Conduct open mine pit surveying
Unit of competency
National Code
CPPSIS6001A
CPPSIS6001A
State Code
D1540
D1540
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
28/10/2008
Field of Education
031101 - Surveying
Original Release Date
28/10/2008
Nominal Hours
140
Description
This unit of competency specifies the outcomes required to work in a surveying capacity in an open mine pit environment. It requires knowledge of surface mining operations and the ability to plan and draft mine drawings to meet job specifications. Functions would be carried out within organisational guidelines.
Notes
Elements and Performance Criteria
1 Identify project.
- 1.1 Organisational priorities are determined to identify project activity.1.2 Schematic models of areas that may have mineral deposits are presented to relevant personnel.
2Organise resources for open mine pit operation.
- 2.1 Processes and procedures involved in undertaking exploration of mineral deposits are planned according to organisational guidelines and OHS requirements.2.2 Mining methods and techniques applicable to surface mining operations are planned according to project objectives.
- 2.3 Required explosives, blasting and blasting practices applicable to the mining industry are identified.2.4 Required mining methods including dumps, stockpiles drainage and dewatering are detailed according to project specifications and Mines Safety requirements.2.5 Levels of rock stability and ground support are incorporated in surface mining operation plans.2.6 Surface mining loading and haulage requirements are detailed in the project specifications.2.7 Mine ventilation requirements for surface mines, with regard to air quality and possible contaminants, are detailed in project specifications according to OHS guidelines.2.8 Mining regulations with regard to management, surveying, safety, blasting, power and lighting are detailed according to relevant legislation and company policy.2.9 All equipment use is planned according to manufacturer specifications.
3Manage open mine pit surveying operations.
- 3.1 Project objectives, deliverables, constraints, principal work activities and equipment requirements are defined and documented according to spatial data specifications and client requirements.3.2 Work is scheduled to be completed within time available.3.3 Project management mechanisms are implemented to measure, record and report progress of activities in relation to the agreed schedule and plans.3.4 Agreed communication processes between project members, client and other stakeholders are implemented and maintained.3.5 OHS and legislative requirements are incorporated into project risk management.3.6 Pertinent legal and statutorystandards are researched, considered and adhered to.3.7 Contingencies and constraints are managed to ensure project meets specifications.3.8 Skills and knowledge are updated to accommodate changes in operating environment and equipment.
4Conduct operational elements of open mine pit surveying operations.
- 4.1 Identified spatial components of the open mine pit are accurately measured or set out.4.2 Measured spatial data is reduced to project reference system.4.3 Mine drawings are created to meet job specifications.4.4 Captured data is used to calculate mine volumes.4.5 OHS requirements are adhered to.4.6 Measurements are validated and recorded according to project specifications.4.7 Quality assurance processes are implemented based on the project activity.
5Finalise the project.
- 5.1 Relevant personnel are informed of the results according to organisational guidelines.5.2 Required documentation is completed according to organisational guidelines.5.3 Spatial data is archived according to project specifications.
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE820 | CPPSIS6021A | Conduct open mine pit surveying | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D227 | CPP50107 | Diploma of Surveying | Qualification |