Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Monitor, operate and control wastewater treatment processes

Monitor, operate and control wastewater treatment processes

Unit of competency
National Code
NWP346B
State Code
D1922
TGA Status
Deleted
DTWD Status
Deleted
Current Release Number
2.00
Current Release Date
30/04/2012
State Implementation and Classification
Approved Date
14/01/2009
Field of Education
030717 - Plant And Machine Operations
Original Release Date
14/01/2009
Nominal Hours
60
Description
This unit of competency describes the outcomes required to perform basic monitoring, operation, control and measurement of wastewater treatment plant and report on system performance and process quality control.
Notes
Elements and Performance Criteria
1Monitor treatment plant performance.
  • 1.1 Carry out routine plant inspections according to the type of plant and organisational and statutory requirements.
  • 1.2 Select and check equipment and correctly fit and use personal protective equipment.
  • 1.3 Collect process samples and conduct standard tests.
  • 1.4 Collect process data and report according to organisational and plant requirements.
2Prepare and apply chemical dosing.
  • 2.1 Use, handle and store chemicals according to organisational and statutory requirements.
  • 2.2 Prepare chemical dosing according to plant processes and organisational and statutory requirements.
  • 2.3 Maintain information related to chemical supply and usage according to statutory requirements.
3Operate and control processes.
  • 3.1 Monitor processes to maintain the parameters of operation.
  • 3.2 Identify and report process faults and the operational condition of plant according to organisational and statutory requirements.
  • 3.3 Carry out basic system adjustments to enhance system performance according to organisational and statutory requirements.
4Compile process records.
  • 4.1 Compile records from plant and system data to meet organisational procedures and statutory requirements.
  • 4.2 Report observations outside defined parameters for further action.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.
Routine plant inspections may include:
interaction and communication with other employees, other authorities and the general public
visual observation
identification of corrosion damage
implementation of reporting procedures that may also include procedures for the implementation of by-laws, organisational policies and statutory requirements
Organisational and statutory requirements may include:
by-laws and organisational policies
standard operating procedures
environment protection
occupational health and safety
chemicals
dangerous goods
lifts and cranes
Environment Protection Authority regulations
licensing agreements
electrical standards
Equipment used may include:
electronic monitoring and metering systems
manual chart recording systems
basic hand tools
sampling and laboratory testing equipment
computerised equipment
on- and off-road vehicles
communication equipment
personal protective equipment
Tests may include:
settling tests
microscopic observation
pH
temperature
dissolved oxygen
chlorine residuals
ammonia, nitrate, reactive phosphorus and alkalinity determinations
Chemicals may include:
chlorine gas
sodium hypochlorite
calcium hypochlorite
carbon dioxide
alum
powder activated carbon
polymers
lime
Processes may include:
pre-treatment, for example:
screening
shredding
grit removal
odour removal
primary treatment, for example:
primary sedimentation
secondary treatment, for example:
trickling filters
rotating biological contactors
activated sludge
lagoon system
chemical precipitation
solids handling, for example:
aerobic or anaerobic digesters
sludge disposal
disinfection, for example:
maturation ponds
chlorination
ultraviolet irradiation
ozonation
advanced treatment, for example:
chemical nitrogen removal
biological nitrogen removal
biological phosphorus removal
chemical phosphorous removal
micro filtration
System adjustments may include:
pH correction
dissolved oxygen levels
additional carbon source
variations of run times of equipment
Records may include:
plant performance data
chemical usage
The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to monitor, operate and control routine aspects of wastewater treatment processes, including:
conducting routine plant inspections
taking samples and performing basic tests
preparing and applying chemical dosing according to instructions
identifying and reporting system faults
making allowed system adjustments according to instructions
completing required documentation
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit.
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.
Replaces
State Code National Code Title Type
M1923 NWP346A Monitor, operate and control wastewater treatment processes Unit of competency
State Code National Code Title Type
D245 NWP30107 Certificate III in Water Operations Qualification