Unit of competency Outline

Date retreived
22/07/2026 8:27 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Operate glass finishing equipment

Operate glass finishing equipment

Unit of competency
National Code
PMCOPS248B
State Code
W2658
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
01/01/2004
State Implementation and Classification
Approved Date
16/11/2005
Field of Education
030717 - Plant And Machine Operations
Original Release Date
16/11/2005
Nominal Hours
40
Description
Notes
Elements and Performance Criteria
No information
Context
This competency unit includes finishing equipment applicable to each of the specific areas of glass products manufacture -
flat glass
insulation, glass wool insulation, laminated blankets, roll and boards
fibreglass, glass filaments
packaging, bottles and jars
laminated/toughened glass
automotive glass.
This competency may include equipment such as -
cutting/breakout and drilling
trimming and packing
lathes
etching/surface coating/ treatment equipment
wide line equipment
laminating line equipment
rigid pipeline
measuring recording equipment
choppers
winding machines
ovens
edgeworking machinery
on-line cutting
communication equipment
computers.
Typical problems include -
process problems
equipment problems
quality problems.
This competency includes the operation of all ancillary equipment and the operation of plant using PLCs where appropriate.
This unit was developed for larger production contexts but it may also be relevant to craft practitioners producing glass products.
All operations are performed in accordance with standard procedures and work instructions.

OHS
All operations are subject to stringent OHS requirements and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and OHS requirements, the OHS requirements take precedence.

Assessment context and methods
Assessment for this unit of competency will be on an operating plant. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this competency unit (eg, element 4 referring to the identification of a range of faults occurring during operation, or performance criteria 5.4 shut down in an emergency situation). Simulation should be based on the actual plant and will include 'walk-throughs' of the relevant competency components. Simulations may also include the use of case studies/scenarios and role plays.

Critical aspects
It is essential that the glass finishing equipment be understood and that the importance of critical material properties, settings and readings is known. Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action.

Consistent performance should be demonstrated. In particular look to see that:

quality is monitored to minimise wastage
products are produced within specifications and customer requirements
start up and shut down are correctly implemented
signals and alarms are responded to immediately
process measurements are continually made or observed
all OHS requirements are followed.
Competence must be demonstrated in the operation of all ancillary equipment to the level required for this competency unit. These aspects may be best assessed using a range of scenarios/case studies/what ifs as the stimulus, with a walk-through forming part of the response. The assessment activities should include responding to a range of problems.

Resource implications
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.

Other assessment advice
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units.
Individual enterprises may choose to add prerequisites relevant to their processes.

Essential knowledge
Knowledge and understanding of the glass finishing equipment and glass quality to customer specifications sufficient to recognise process conditions which will lead to out of specification production.
Knowledge of the enterprise's standard procedures and work instructions and relevant regulatory requirements along with the ability to implement them within appropriate time constraints and in a manner relevant to the operation of the finishing equipment.

Competence includes the ability to:


apply and/or explain:

composition and nature of the glass
start up and shut down processes
importance of OHS procedures in handling glass
construction and limitations of the glass finishing processing equipment
out of specification situations

distinguish between causes of faults such as:

raw material
mechanical
electrical/instrument
as is relevant to the practical operation of the finishing equipment.

Communicating ideas and information
(1)

Collecting analysing and organising information
(2)

Planning and organising activities
(2)

Working with others and in teams
(1)

Using mathematical ideas and techniques
(1)

Solving problems
(1)

Using technology
(2)

Replaced By
State Code National Code Title Type
WA934 PMC552048C Operate glass finishing equipment Unit of competency
State Code National Code Title Type
W191 PMC20104 Certificate II in Manufactured Mineral Products Qualification