Unit of competency Outline
Date retreived
22/07/2026 6:13 AM AWST
22/07/2026 6:13 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Frame and fit wet area fixtures
Frame and fit wet area fixtures
Unit of competency
National Code
CPCCCA3012
CPCCCA3012
State Code
OCP19
OCP19
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040311 - Carpentry And Joinery
Original Release Date
01/06/2021
Nominal Hours
24
Description
This unit of competency specifies the skills and knowledge required to install supporting framework for fixtures and flashings for wet area construction of a bath, shower base, and prepare for wet area linings, meeting all relevant requirements of the National Construction Code (NCC), Australian Standards, work health and safety (WHS), and Commonwealth and state or territory legislation. The unit includes setting out, cutting and fabrication of frames and installation of frames in bathroom, laundry, shower, toilet and en suite wet areas.Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001Prepare to work safely in the construction industry meets this requirement.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare.
- 1.1 Read and interpret work instructions and plan sequence of work.
- 1.2 Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, workplace requirements, drawings and specifications.
- 1.3 Select tools and equipment, check for serviceability and report any faults.
- 1.4 Select and use personal protective equipment (PPE) as required for each stage of the task.
- 1.5 Inspect work site, locate services, assess hazards and apply risk controls, including required signage and barricades.
- 1.6 Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
2 Construct frames for bath installation.
- 2.1 Set out noggings and housings for bath fitments and fixtures.
- 2.2 Notch studs to height and level for required depth to receive lip of bath.
- 2.3 Construct support to front edge of bath to height and level.
- 2.4 Fit and fix noggings and jack studs flush for lining.
3 Construct frames for shower base installation.
- 3.1 Set out location of shower base, noggings and housings for shower fitments and fixtures.
- 3.2 Mark and notch all plates and studs to required depth to receive shower base.
- 3.3 Fit and fix noggings and jack studs flush to wall face for lining.
- 3.4 Install corner flashing.
4 Clean up.
- 4.1 Clean up, meeting all legislative and workplace requirements for safety, waste disposal and materials handling.
- 4.2 Check, maintain and store tools and equipment and report any faults.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W9351 | CPCCCA3012A | Frame and fit wet area fixtures | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGB8 | CPC30220 | Certificate III in Carpentry | Qualification |
| BGE0 | CPC31420 | Certificate III in Construction Waterproofing | Qualification |
| BGD6 | CPC31920 | Certificate III in Joinery | Qualification |