Unit of competency Outline

Date retreived
22/07/2026 4:26 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Adjust cane delivery schedules to meet daily milling requirements

Adjust cane delivery schedules to meet daily milling requirements

Unit of competency
National Code
FDFSUG303A
State Code
WD864
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
01/05/2012
State Implementation and Classification
Approved Date
Field of Education
089901 - Purchasing, Warehousing And Distribution
Original Release Date
Nominal Hours
55
Description
This unit describes the outcomes required to adjust schedules to meet daily sugar mill operational requirements
Notes
Elements and Performance Criteria
1 Identify daily factory requirements for cane supply
  • 1.1 Workplace information are accessed
  • 1.2 Factors that impact on cane supply are identified
2 Calculate zero hour
  • 2.1 Zero hour is calculated to take account of daily variables
  • 2.2 Relevant personnel are informed of zero hour
3 Amend daily bin allotment and bin allocations
  • 3.1 Bin allotment requirements are determined
  • 3.2 Daily bin allotment and bin allocations are calculated based on amended requirements
  • 3.3 Schedule for bin allocation and loco runs to harvest groups is amended to meet requirements
  • 3.4 Amended schedule is documented and submitted for approval in accordance with workplace procedures
4 Monitor supply and demand to maintain and adjust schedule
  • 4.1 Transport departures and arrivals are co-ordinated and adjusted to meet schedule requirements
  • 4.2 Regular two-way communication with locomotive drivers and harvester operators is used to maintain schedules and safe operations
  • 4.3 Cane stock and deliveries (supply) are monitored against schedule
  • 4.4 Variations between supply and schedule are identified and corrective action is taken
  • 4.5 Resource implications of amended schedules are identified and resources are accessed to meet requirements
  • 4.6 Progress against schedule is monitored
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Policies and procedures
Work is carried out in accordance with company policies and procedures, licensing requirements, legislative requirements, codes of practice and industrial awards and agreements.
Codes of Practice
Codes of practice include the Sugar Milling Operations Industry Code of Practice and sugar industry codes of practice related to cane railway and transport operations.
Workplace information
Workplace information can include:
master schedule
bin allotments
mill crushing rates
schedules and harvesting rosters
Teamwork
Work may require the ability to work within a team environment.
Communication methods
Communication methods include:
use of two-way radios used in accordance with workplace requirements and state authority protocols.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Assessment must be carried out in a manner that recognises the cultural and literacy requirements of the assessee and is appropriate to the work performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of ability to:
apply workplace information to calculate zero hour
amend daily schedule bin allotments and bin allocations
monitor work progress and respond to update schedule
use communication systems and equipment
confirm resources and personnel are available to meet amended schedule
demonstrate workplace procedures for reallocating cane bin deliveries to harvesters
maintain workplace records
Context of and specific resources for assessment
Assessment must occur in a real or simulated workplace where the assessee has access to:
Transport system and associated information and communication systems and equipment
Relevant codes of practice and industry standards
Workplace information required to assess, adjust and monitor work progress against schedule
Operating procedures related to work responsibilities
Housekeeping standards and procedures
Workplace information recording systems, requirements and procedures
Method of assessment
Other units of competency relevant to the work role should be assessed in conjunction with this unit.
Guidance information for assessment
To ensure consistency in one's performance, competency should be demonstrated on more than one occasion over a period of time in order to cover a variety of circumstances, cases and responsibilities, and where possible, over a number of assessment activities.
Replaces
State Code National Code Title Type
AYL32 SUGTASD3A Adjust schedule(s) to meet daily workplace requirements Unit of competency
Replaced By
State Code National Code Title Type
OAN62 FBPSUG3003 Adjust cane delivery schedules to meet daily milling requirements Unit of competency
No information