Unit of competency Outline

Date retreived
22/07/2026 11:28 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Conduct design and set out survey

Conduct design and set out survey

Unit of competency
National Code
CPPSIS6028A
State Code
WE827
TGA Status
Deleted
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
27/11/2012
State Implementation and Classification
Approved Date
25/10/2013
Field of Education
031101 - Surveying
Original Release Date
25/10/2013
Nominal Hours
60
Description
This unit of competency specifies the outcomes required for design and set out of roads and associated engineering structures. It requires the ability to undertake all aspects of survey design from understanding client and registered surveyor requirements and the special characteristics of a given site, to applying relevant legal and statutory requirements to the design. The selection of appropriate equipment, procedures and personnel is essential to performing the task safely and efficiently. Functions will entail complying with and developing or amending organisational guidelines.
Notes
Elements and Performance Criteria
1 Organise resources.
  • 1.1 Characteristics of the operating environment and any special equipment or resource requirements are identified according to organisational guidelines.
  • 1.2 Equipment is checked to be in good working order.
  • 1.3 Manufacturer specifications with regard to the use of equipment are complied with.
2 Develop the project plan.
  • 2.1 Objectives, principal work activities and constraints are defined and documented according to written survey specifications and client requirements.
  • 2.2 Objectives and principal work activities are communicated to relevant personnel.
  • 2.3 Details of instruments and basic techniques to be used are considered and evaluated.
  • 2.4 Data is collected according to the nature of the project and organisational guidelines.
3 Conduct the design.
  • 3.1 Design is interpreted to identify surveying datacomponents to be measured or set out.
  • 3.2 Hazards and risks in the work site are identified, reported or rectified according to OHS procedures, legislative requirements and organisational guidelines.
  • 3.3 Pertinent legal and statutorystandards are considered and adhered to.
  • 3.4 Resources, equipment, materials and transport are determined and organised according to nature of the project.
  • 3.5 Feedback provided by team members is discussed and acted upon in line with organisational guidelines.
4 Conduct set out survey.
  • 4.1 Identified survey components are measured or set out.
  • 4.2 Measured or set out survey data is reduced to the project reference system for comparison with design.
  • 4.3 Impact of contingencies is managed.
  • 4.4 Measured or set out data is validated and recorded according to specifications.
5 Complete project to clients’ requirements.
  • 5.1 Completed work is checked against clients’ requirements according to the specifications.
  • 5.2 Required documentation is completed according to organisational guidelines.
  • 5.3 Relevant personnel are informed of the results according to organisational guidelines.
  • 5.4 Survey data is archived according to project specifications.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the performance criteria is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Organisational guidelines may include:
appropriate timelines
code of ethics
company policy
final product formats
formal design parameters
legislation relevant to the work or service function
manuals
OHS policies and procedures
personnel practices and guidelines outlining teamwork, work roles and responsibilities
requirements for data processing.
Manufacturer specifications may include:
equipment specifications
operator manuals.
Objectives may include:
agreed client requirements
written survey specifications.
Principal work activities may include the survey design of:
bridge construction
building construction (domestic and commercial)
railway construction
road construction
sewerage system
stormwater system.
Constraints may include:
coverage
datum
environmental factors
industry requirements
legal and statutory
financial
resource availability
time.
Client requirements refer to description of outputs and may be contained in:
contracts
memos
tender briefs
verbal instructions
written instructions.
Relevant personnel may include:
colleagues
registered surveyors
site personnel
staff or employee representatives
supervisors or line managers
suppliers
users.
Techniques may include:
field
office procedures.
Nature of the project may include:
bridge
building
railway
road
sewerage system
stormwater system.
Design may include:
digital information
hard copy plans
maps
written instructions.
Surveying data components may include:
depth
dimension
direction
flow rates
position
slope.
Hazards may include:
bites and stings
broken glass and other sharp surfaces
damaged or inappropriate equipment
dust and fibres
electrical problems arising from cables, electrical fittings (switches and lights) and untested electrical equipment
environmental impact
extremes of heat and temperature
fatigue
fire
gas
heights
awkward and repetitive postures
mobile vehicle problems around plant and vehicles
moving and unguarded machinery and equipment
noise
occupational violence and bullying
poor manual handling techniques
poor personal hygiene practices
repetitive motion, force and vibration
syringes or other sharp objects
ultraviolet light
underfoot conditions e.g. slippery, uneven and rough surfaces
unrestricted people access
work in isolated and remote environments.
OHS may include:
Australian standards
development of site safety plan
identification of potential hazards
inspection of work sites
training staff in OHS requirements
use of personal protective clothing
use of safety equipment and signage.
Legislative requirements may include:
Australian standards
award and enterprise agreements
certification requirements
codes of practice
quality assurance requirements.
Legal and statutory standards may include:
local government requirements
national standards
state statutes and regulations.
Contingencies may include:
equipment failure
injury to personnel
personnel turnover
observation errors
obstructions to design survey
weather.
Measured and set out data may include:
computer-aided design (CAD) equipment
current meter
echo sounder
global navigation satellite system (GNSS)
level
photogrammetry
remote sensing
theodolite
tide gauge
total station.
Specifications may include:
detailed technical descriptions of survey data and its requirements
preparation of cross-sections and plans with all information included.
Clients may include:
external to organisation
customers with routine or special requests
internal to organisation
regular and new customers, including:
members of the public
business enterprises
government agencies
suppliers.
Requireddocumentation may include:
electronic or paper-based correspondence with client
field records
final report
organisational work activity sheets
records of conversation
survey plots.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the Assessment Guidelines for this Training Package.
Overview of assessment
This unit of competency could be assessed on its own or in combination with other units relevant to the job function, for example CPPSIS6035A Conduct complex engineering set out surveys.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
accessing and interpreting design information to identify the components to be measured and monitored
performing measurements
planning resources
reducing and manipulating survey
recording and reporting non-conformity aspects
knowledge of surveying reference systems, data capture and data set out methodologies.
Specific resources for assessment
Resource implications for assessment include access to:
assessment instruments, including personal planner and assessment record book
assignment instructions, work plans and schedules, policy documents and duty statements
registered training provider of assessment services
relevant guidelines, regulations and codes of practice
suitable venue and equipment.
Access must be provided to appropriate learning and assessment support when required.
Where applicable, physical resources should include equipment modified for people with disabilities.
Context of assessment
Holistic: based on the performance criteria, evidence guide, range statement, and required skills and knowledge.
Method of assessment
Demonstrated over a period of time and observed by the assessor (or assessment team working together to conduct the assessment).
Demonstrated competency in a range of situations, that may include customer/workplace interruptions and involvement in related activities normally experienced in the workplace.
Obtained by observing activities in the field and reviewing induction information. If this is not practicable, observation in realistic simulated environments may be substituted.
Guidance information for assessment
Assessment requires that the clients’ objectives and industry expectations are met. If the clients’ objectives are narrowly defined or not representative of industry needs, it may be necessary to refer to portfolio case studies of a variety of surveying and spatial information services requirements to assess competency.
Oral questioning or written assessment and hypothetical situations (scenarios) may be used to assess underpinning knowledge (in assessment situations where the candidate is offered a preference between oral questioning or written assessment, questions are to be identical).
Supplementary evidence may be obtained from relevant authenticated correspondence from existing supervisors, team leaders or specialist training staff.
All practical demonstration must adhere to the safety and environmental regulations relevant to each State or Territory.
Where assessment is for the purpose of recognition (recognition of current competencies [RCC] or recognition of prior learning [RPL]), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time.
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge.
Assessment processes will be appropriate to the language and literacy levels of the candidate and any cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.
Replaces
State Code National Code Title Type
D1547 CPPSIS6008A Conduct design and set out survey Unit of competency
State Code National Code Title Type
J360 CPP60312 Advanced Diploma of Surveying Qualification