Unit of competency Outline

Date retreived
23/07/2026 5:16 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Prepare for gravedigging

Prepare for gravedigging

Unit of competency
National Code
SIFCBCR006
State Code
WG571
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
10/10/2013
State Implementation and Classification
Approved Date
14/08/2013
Field of Education
030717 - Plant And Machine Operations
Original Release Date
14/08/2013
Nominal Hours
10
Description
This unit describes the performance outcomes, skills and knowledge required to assess a gravesite for the appropriate gravedigging method and prepare the site for digging or reopening according to work requirements. It applies to cemetery and crematorium staff involved in burial works under supervision as part of a team. Work is carried out according to work health and safety, relevant legislation and workplace policies and procedures.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Determine gravedigging requirements.
  • 1.1 Identify appropriate lined or unlined gravesite and physical location according to cemetery map or plan.
  • 1.2 Assess site and surrounding area to determine soil type, safety hazards, access and egress, requirement to conduct grave probe, removal of soil and effect on presentation of nearby graves.
  • 1.3 Determine viability of gravesite according to safety requirements and refer to manager or leading hand for further instruction.
  • 1.4 Select manual or machinery gravedigging method.
2. Conduct grave probe as required.
  • 2.1 Select and prepare personal protective equipment.
  • 2.2 Select and prepare tools and equipment and machinery according to work requirements, and manufacturer guidelines.
  • 2.3 Undertake slab removal as required.
  • 2.4 Measure plot to determine correct location of initial probe position.
  • 2.5 Probe gravesite according to measurements.
  • 2.6 Record measurements from probe to determine vacancy status.
  • 2.7 Report viability of gravesite to appropriate personnel.
3. Prepare for digging.
  • 3.1 Assemble and brief gravedigging work team as required.
  • 3.2 Advise gravedigging work team of above and below ground lines of communication to be used in case of emergency.
  • 3.3 Select and prepare personal protective equipment.
  • 3.4 Select and prepare tools and equipment according to work requirements.
  • 3.5 Mark site according to grave dimensions and supervisor instructions.
  • 3.6 Inspect and remove monuments, masonry or headstones that impact stability or access.
  • 3.7 Apply protective strategies to preserve adjacent graves.
  • 3.8 Place protective restraints to ensure access by authorised personnel only.
No information
No information
Replaces
State Code National Code Title Type
S7033 SIFBCR017A Prepare for gravedigging Unit of competency
State Code National Code Title Type
J576 SIF30213 Certificate III in Gravedigging, Grounds and Maintenance Qualification
AC406 SIFSS00004 Safe Gravedigging Skill set