Unit of competency Outline

Date retreived
23/07/2026 7:42 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Coordinate and monitor the operation of irrigation delivery systems

Coordinate and monitor the operation of irrigation delivery systems

Unit of competency
National Code
NWP425B
State Code
D1951
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
30/04/2012
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
20/06/2014
Nominal Hours
40
Description
This unit of competency describes the outcomes required to coordinate and monitor irrigation delivery systems to ensure system maintenance and performance standards and customer liaison.
Notes
Elements and Performance Criteria
1Confirm performance measures in irrigation system's management plan.
  • 1.1 Identify customer requirements for irrigated culture.
  • 1.2 Identify environmental factors that impact on the irrigation system.
  • 1.3 Consult historic system information and stakeholders as appropriate
  • 1.4 Confirm performance requirements for an irrigation system management plan.
2Monitor and coordinate processes and resource targets.
  • 2.1 Correctly select, fit and use equipment, including personal protective equipment.
  • 2.2 Apply monitoring and testing programs and identify, investigate and report any deviations from water quantity, quality, release or flow.
  • 2.3 Evaluate the timeliness, volume and flow rates of water deliveries and identify, investigate and report deviations from agreed service levels.
  • 2.4 Evaluate maintenance budgets, activity programs and output target measures and identify, investigate and report deviations from targets.
  • 2.5 Identify and record links between operational problems and maintenance activities.
3Report outcomes of coordination and monitoring.
  • 3.1 Analyse, record and report coordination and monitoring data according to organisational procedures and statutory requirements.
  • 3.2 Identify and report current and potential problems according to organisational procedures.
  • 3.3 Make recommendations for improvements in system performance and/or customer service.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.
Environmental factors may include:
environmental flows
chemicals
nutrients
salinity
downstream requirements
Historic system information may include:
previous studies
impact of weather
relevant hydrometric information
previous system deliveries
previous flow rates
operational procedures
Stakeholders may include:
customers
government
farmer and grower associations
downstream land holders
other water authorities
employees
customer representative committees
land care or similar active groups
local communities
Irrigation system management plan may include:
service levels
capital investment
maintenance levels
Equipment may include:
electronic monitoring and metering systems
manual chart recording systems
on- and off-road vehicles
communication equipment
personal protective equipment
Monitoring and testing programs may include:
timeliness of deliveries
flow
input and output quality
testing procedures
frequency
sampling locations
budgets
physical achievement targets
operational procedures
number of complaints
Organisational and statutory requirements may include:
relevant federal legislation
relevant state or territory legislation
relevant local government by-laws or planning instruments
board or authority by-laws
The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to coordinate and monitor the operation of irrigation systems including:
identifying customer requirements for irrigated culture and environmental factors that impact on the irrigation system
consulting historic system information and stakeholders as appropriate
confirming performance requirements for an irrigation system management plan
implementing monitoring and testing programs and investigating and reporting deviations from planned parameters
evaluating performance of water deliveries and investigating and reporting deviations from agreed service levels
evaluating performance targets such as maintenance budgets, activity programs and output target and investigating and reporting deviations
analysing and reporting data
identifying and reporting problems
making recommendations for system performance or customer service improvements
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.
Replaces
State Code National Code Title Type
M1951 NWP425A Co-ordinate and monitor the operation of irrigation systems Unit of competency
Replaced By
State Code National Code Title Type
AVY98 NWPIRR033 Coordinate and monitor the operation of irrigation delivery systems Unit of competency
State Code National Code Title Type
J158 AHC41112 Certificate IV in Irrigation Qualification
D246 NWP40107 Certificate IV in Water Operations Qualification