Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Berth and shut down an electric tram

Berth and shut down an electric tram

Unit of competency
National Code
TLIC3034A
State Code
D5039
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
07/03/2011
State Implementation and Classification
Approved Date
10/08/2011
Field of Education
039907 - Rail Operations
Original Release Date
10/08/2011
Nominal Hours
20
Description
This unit involves the skills and knowledge required to berth and shut down an electric tram including determining the required berthing location; berthing, shutting down and securing the tram; carrying out all required post-operational activities; and completing post-operational paperwork. This unit replaces part of the previous unit TDTC2101A Drive tram. Licensing, legislative, regulatory or certification requirements are applicable to this unit.
Notes
Elements and Performance Criteria
1Determine berthing location
  • 1.1 Contact is made with tram controller and depot staff, or information is obtained from an information board, to determine planned location for berthing the tram
  • 1.2 Directions of tram controller and depot staff are interpreted and followed
2Berth and shut down an electric tram
  • 2.1 Electric tram is berthed in accordance with organisation's and site requirements
  • 2.2 Shut-down procedures are carried out in accordance with specifications and organisation's requirements
3Carry out post-operational checks
  • 3.1 Visual and other checks are made of tram as per workplace procedures
  • 3.2 Any identified faults and defects are fixed or reported and recorded as per workplace procedures
  • 3.3 Faulty and defective equipment that presents a safety risk is reported as per workplace procedures and relevant regulations
  • 3.4 Outcomes of post-operational checks are recorded as per workplace procedures
4Secure an electric tram
  • 4.1 Brakes are applied as per workplace procedures
  • 4.2 Electric tram is secured in accordance with depot requirements
5Complete post-operational paperwork
  • 5.1 Timesheet or other work record is completed
  • 5.2 Roster is checked for future work allocation
  • 5.3 Issues and variations are discussed and resolved with roster clerk
  • 5.4 All required documentation is completed as per workplace procedures
  • 5.5 All equipment is returned and stowed as per workplace requirements
  • 5.6 Records of the electric tram are completed in accordance with workplace procedures and regulatory requirements
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance.
Operations may be conducted:
by day or night in all relevant weather conditions
Electric trams include all electric trams in service within Australian transport systems and may include:
hand-operated or foot pedal control systems or both
Electric tram equipment may include:
ancillary systems
automatic control systems
braking systems
drive systems
instrumentation
manual controls
communication systems
warning equipment
power source
vigilance systems
traction systems
Visual inspection of an electric tram may include:
lights
hoses
couplings
destination indicators or signs
doors and door locks
springs
brake equipment
wheels
seals
sand
pantographs or trolley poles
electrical cables
glass windows and doors
audible faults (e.g. hiss of escaping air)
visible faults (e.g. oil leaks, tears and cracks)
Post operation checks may include:
sand levels
brake testing
internal and external lights
air systems
interlocks and door controls
Risk minimisation may require differentiating between faults, defects and deficiencies that:
do not present a hazard and could be attended to under running maintenance or in a normal maintenance schedule
present a potential hazard and need to be attended to under running maintenance or at the next most practical opportunity
present an immediate hazard and require immediate attention
Relevant personnel may include:
tram crew
tram controllers
rostering supervisors and staff
other tram drivers and crews
depot coordinators
supervisors and other operational personnel
maintenance personnel
immediate internal or external customers
internal and external suppliers
Action taken upon the identification of faults, defects or deficiencies may include:
reporting the problem and carrying out repairs (depending on the level and extent of work required), or isolating the faulty equipment and advising appropriate personnel of the fault and need for repair or replacement
Depending on the organisation concerned workplace procedures may be called:
standard operating procedures
company procedures
enterprise procedures
organisational procedures
established procedures
Information and documents may include:
relevant national and state or territory transport regulations and codes of practice
notices in drivers' notice board/box
reference cards
tram driver roster sheet and/or table card
operational instructions, policies and procedures:
emergency procedures manual
conditions of service, legislation and industrial agreements including workplace agreements and awards
Applicable legislation, regulations and codes may include:
applicable legislated rail safety requirements including acts and regulations from each state and territory together with any nationally approved compliance codes and/or guidelines
relevant state/territory road rules and tramway codes of practice
relevant Australian Standards and related requirements
relevant state/territory OH&S legislation
relevant state/territory environmental protection legislation
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required knowledge and skills, the range statement and the assessment guidelines for this Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria of this unit and include demonstration of applying:
the underpinning knowledge and skills
relevant legislation and workplace procedures
other relevant aspects of the range statement
Context of and specific resources for assessment
Performance is demonstrated consistently over a period of time and in a suitable range of contexts
Resources for assessment include:
a range of relevant exercises, case studies and/or other simulated practical and knowledge assessment, and/or
access to an appropriate range of relevant operational situations in the workplace
In both real and simulated environments, access is required to:
relevant and appropriate materials and equipment, and
applicable documentation including workplace procedures, regulations, codes of practice and operation manuals
Method of assessment
Assessment of this unit must be undertaken by a registered training organisation
As a minimum, assessment of knowledge must be conducted through appropriate written/oral tests
Practical assessment must occur:
through activities in an appropriately simulated environment at the registered training organisation, and/or
in an appropriate range of situations in the workplace
Replaced By
State Code National Code Title Type
AVJ94 TLIC3034 Berth and shut down an electric tram Unit of competency
State Code National Code Title Type
W923 TLI31410 Certificate III in Rail Driving Qualification