Unit of competency Outline

Date retreived
22/07/2026 10:27 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Develop system infrastructure design plan

Develop system infrastructure design plan

Unit of competency
National Code
ICAA5044B
State Code
D0007
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
08/07/2010
State Implementation and Classification
Approved Date
29/11/2007
Field of Education
020305 - Systems Analysis And Design
Original Release Date
29/11/2007
Nominal Hours
35
Description
Notes
Elements and Performance Criteria
No information
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Databases, applications, servers, operating systems, gateways, ASP and ISP

May include timeframe, cost implications, and technical and logistical considerations

May be in reference to the business, system, application, network or people in the organisation

May include but is not limited to workstations, personal computers, modems and other connectivity devices, networks, DSL modems, remote sites and servers

May include but is not limited to large and small LANs, WANs, the internet, PSTN for dial-up modems, private lines, VPNs, data and voice

May include but is not limited to commercial, in-house, packaged or customised software

May include ISO/IEC/AS standards, organisational standards, project standards (for further information refer to the Standards Australia website at: www.standards.com.au )

May include a total organisational change, a systems-only change, a business improvement process, or an e-business solution involving the total organisation or part of the organisation

May include but is not limited to:
Operating system: Novell NetWare 5 or above or any operating system that has multi-user ability, Linux, Mac OS, Windows 2000 or above
Database software: Oracle, Sybase, Microsoft SQL server, Ingres, DB2, Informix, mSQL, MySQL, SQL server
Configuration: small memory model, large memory model, requests per second

May be in reference to the business, system, application, network or people in the organisation

May include but is not limited to new hardware, hardware upgrades, new software, software upgrades, user training and implementing a new system

May include but is not limited to internal departments, external organisations, individual people and employees

May include but are not limited to commercial software applications; organisation-specific software; word processing, spreadsheet, database, graphic and communication packages
May include presentation applications contained in: Microsoft Office, Lotus Suite, Claris Works and Star Office

May include but are not limited to technical requirements, user problem statement, current system functionality

May follow ISO/IEC/AS standards, audit trails, naming standards, version control, project management and report writing conventions, maintaining equipment inventory, and client training and satisfaction reports

May include a supervisor, teacher, authorised business representative or client

May be in reference to the business, system, application, network or people in the organisation

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects of evidence
Assessment must confirm sufficient knowledge of communications technology, hardware, software and data modelling. Assessment must confirm the ability to translate business processes into technical processes.
Assessment must confirm the ability to plan and develop a model for a physical system from the requirements.

Knowledge and skills
Current industry-accepted hardware and software products
Broad general knowledge of the client business domain, particularly the business function and organisation (e.g. when specifying architecture requirements)
Basic knowledge of cabling and telecommunications technologies (e.g. when specifying architecture requirements)
Broad knowledge of vendor product directions and technology directions (e.g. when specifying hardware and software)
Networking technologies, including broad knowledge of general features and capabilities incorporating substantial depth in some areas (e.g. when specifying architecture requirements)
Broad knowledge of systems architectural design principles and methodologies (e.g. when specifying architecture requirements
Broad knowledge of modelling techniques and methodologies (e.g. when specifying architecture requirements, and for comparing and contrasting after walk-through of expected performance criteria against vendor proposed offerings)
Problem solving skills for a broad range of unpredictable problems involving analysis, diagnosis and evaluation (e.g. when specifying the critical principles, functions and framework for the system to operate across the enterprise or business units, taking into consideration the project deliverables, acceptance criteria and current IT blueprint)
Plain English literacy and communication skills in relation to analysis, evaluation and presentation of information (e.g. when the initial statement of hardware needs is written)
Group facilitation and presentation skills in relation to transferring and collecting information (e.g. when estimating current and future capacity requirements and evaluating against client's future requirements, and for documenting recommendations for improvement and referring them to appropriate technical specialists)
Questioning and active listening skills (e.g. when specifying the critical principles, functions and framework for the system to operate across the enterprise or business units, taking into consideration the project deliverables, acceptance criteria and current IT blueprint)
Technological capability assessment skills involving analysis, diagnosis and evaluation (e.g. when evaluating various products against architecture requirements to determine the best IT solution, and for estimating current and future capacity requirements and evaluating against client's future requirements)
Research skills for specifying, analysing and evaluating broad features of a particular business domain and best practice in system development (e.g. when evaluating various products against architecture requirements to determine the best IT solution, and for benchmarking requirements model against current industry standards and IT blueprint for performance, interoperability and expected future organisational needs)
Project planning skills in relation to set benchmarks and identified scope (e.g. when specifying the critical principles, functions and framework for the system to operate across the enterprise or business units, taking into consideration the project deliverables, acceptance criteria and current IT blueprint)
Report writing skills for business requiring depth in some areas, analysis and evaluation of information in a defined range of areas (e.g. when documenting recommendations for improvement and referring them to appropriate technical specialists)

Assessment guidance
The purpose of this unit is to define the standard of performance to be achieved in the workplace. In undertaking training and assessment activities related to this unit, consideration should be given to the implementation of appropriate diversity and accessibility practices in order to accommodate people who may have special needs. Additional guidance on these and related matters is provided in ICA05 Section 1.
Competency in this unit should to be assessed using summative assessment to ensure consistency of performance in a range of contexts. This unit can be assessed either in the workplace or in a simulated environment. However, simulated activities must closely reflect the workplace to enable full demonstration of competency.
Assessment will usually include observation of real or simulated work processes and procedures and/or performance in a project context as well as questioning on underpinning knowledge and skills. The questioning of team members, supervisors, subordinates, peers and clients where appropriate may provide valuable input to the assessment process. The interdependence of units for assessment purposes may vary with the particular project or scenario.

In the case of this unit, it could be assessed in a holistic manner with:

ICAS5123B Manage network security
ICAA5054B Validate quality and completeness of system design specifications
ICAA5056B Prepare disaster recovery and contingency plans
ICAT5083B Develop and conduct client acceptance test
ICAI5100ABBuild an internet infrastructure
ICAA5045ABProduce network architecture design

Resources

To demonstrate competency in this unit the learner will need access to:

Client requirements
The project deliverables
The acceptance criteria
Current IT blueprint
Information on a range of IT business solutions and vendor offerings
Future organisational business process requirements
Technical specifications

Role context
The breadth, depth and complexity covering planning and initiation of alternative approaches to skills or knowledge applications across a broad range of technical and/or management requirements, evaluation and coordination would be characteristic.
The demonstration of competency may also require self-directed application of knowledge and skills, with substantial depth in some areas where judgement is required in planning and selecting appropriate equipment, services and techniques for self and others.
Applications involve participation in development of strategic initiatives as well as personal responsibility and autonomy in performing complex technical operations or organising others. It may include participation in teams including teams concerned with planning and evaluation functions. Group or team coordination may also be involved.

An individual demonstrating this competency would be able to:

Demonstrate understanding of a broad knowledge base incorporating theoretical concepts, with substantial depth in some areas
Analyse and plan approaches to technical problems or management requirements
Transfer and apply theoretical concepts and/or technical or creative skills to a range of situations
Evaluate information, using it to forecast for planning or research purposes
Take responsibility for own outputs in relation to broad quantity and quality parameters
Take some responsibility for the achievement of group outcomes
Maintain knowledge of industy products and services

Replaces
State Code National Code Title Type
C8647 ICAA5044A Develop system infrastructure design plan Unit of competency
Replaced By
State Code National Code Title Type
D2791 ICAA5044C Develop system infrastructure design plan Unit of competency