Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct maintenance on deployed operations
Conduct maintenance on deployed operations
Unit of competency
National Code
TLIX5043A
TLIX5043A
State Code
D5427
D5427
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
06/07/2011
Field of Education
089901 - Purchasing, Warehousing And Distribution
Original Release Date
06/07/2011
Nominal Hours
40
Description
This unit involves the skills and knowledge required to organise logistic maintenance support operations in a deployed context in support of organisational operations. Licensing, legislative, regulatory or certification requirements are applicable to this unit.
Notes
Elements and Performance Criteria
1Analyse the maintenance requirement
- 1.1 Maintenance tasks are received and analysed for operational maintenance requirements
- 1.2 Information is sourced and analysed to identify the maintenance factors to be considered in supporting operations
- 1.3 Logistic information management systems are utilised in the scheduling and coordination of maintenance
- 1.4 The maintenance of workshop equipment is scheduled within the constraints of delivering maintenance support
- 1.5 The considerations of production/maintenance planning are applied to derive the most efficient employment of maintenance equipment and personnel
- 1.6 The enabling components of maintenance support are identified and established
- 1.7 Instructions are prepared and delivered to implement and coordinate maintenance support
- 1.8 Risk analysis is conducted to identify and mitigate against unacceptable risks
- 1.9 Technical advice is provided to management and stakeholders
2Manage maintenance support
- 2.1 Maintenance technical policy and procedure are applied in the conduct of maintenance support
- 2.2 Occupational health and safety (OH&S) requirements and recognised safety precautions are applied throughout the operation in accordance with standard procedures
- 2.3 Maintenance personnel are supervised and efficiently and effectively employed within their area of speciality
- 2.4 Requests for repair/recovery support are received and an appropriate response is developed to support to the task
- 2.5 Maintenance effort is monitored to ensure workload is effectively distributed across the maintenance organisation
- 2.6 Operational or organisational constraints are recognised and maintenance tasks are directed to align with these constraints
- 2.7 The maintenance activity is monitored to ensure that the maintenance organisations are conducting activity with appropriate authority and in accordance with organisational policy and procedures
- 2.8 Liaison with agencies involved in the operation, maintenance and supply chain is carried out to ensure the most effective coordination of effort
- 2.9 Maintenance support priorities are set in order to align the maintenance support activities with the organisational objectives
- 2.10 Management and stakeholders are advised when significant issues or developments arise that may adversely impact on the technical integrity of material within the organisation
- 2.11 Maintenance records are maintained and entered into information systems
3Forecast repair parts requirements
- 3.1 Repair parts agencies are liaised with to coordinate the provisioning of repair parts to meet forecast maintenance requirements
- 3.2 The supply and demand of repair parts is monitored to ensure repair parts and materials are available to support maintenance activities
- 3.3 The management of repair parts records are monitored to ensure visibility over repair parts to support maintenance planning
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance.
Maintenance effort may include:
technical inspection
testing
servicing
classification
recovery
repair
rebuilding
salvage
calibration
Maintenance technical policy and procedure may include:
maintenance doctrine
technical regulations
engineering instructions
maintenance plans
standard operating procedures
maintenance advisory bulletins
Maintenance planning tools may include:
logistic information systems
maintenance information systems:
current availability
workflow
backlog
scheduling
back-loading
cross-loading
The considerations of production/maintenance planning may include:
duration of repair work
location of the equipment
priority of the equipment
parent unit activity
capacity
capability
repair policy
Enabling components of maintenance support may include:
competent and qualified tradespeople
facilities and support equipment, including recovery equipment
tools and test equipment
repair parts
technical data and documentation
time
repair pools
Repair/recovery support may include:
forward repair of material
forward recovery of material
establishment of equipment collection point
back loading of material
Repair parts may include:
all essential elements, materials, components, assemblies or sub-assemblies of an end item of equipment required for the maintenance or repair of equipment
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance.
Maintenance effort may include:
technical inspection
testing
servicing
classification
recovery
repair
rebuilding
salvage
calibration
Maintenance technical policy and procedure may include:
maintenance doctrine
technical regulations
engineering instructions
maintenance plans
standard operating procedures
maintenance advisory bulletins
Maintenance planning tools may include:
logistic information systems
maintenance information systems:
current availability
workflow
backlog
scheduling
back-loading
cross-loading
The considerations of production/maintenance planning may include:
duration of repair work
location of the equipment
priority of the equipment
parent unit activity
capacity
capability
repair policy
Enabling components of maintenance support may include:
competent and qualified tradespeople
facilities and support equipment, including recovery equipment
tools and test equipment
repair parts
technical data and documentation
time
repair pools
Repair/recovery support may include:
forward repair of material
forward recovery of material
establishment of equipment collection point
back loading of material
Repair parts may include:
all essential elements, materials, components, assemblies or sub-assemblies of an end item of equipment required for the maintenance or repair of equipment
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required knowledge and skills, the range statement and the assessment guidelines for this Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria of this unit
Context of and specific resources for assessment
Competency should be demonstrated on at least one occasion covering the scope of the unit of competence
Resources for assessment include:
a range of relevant exercises, case studies and/or other simulated practical and knowledge assessment, and/or
access to an appropriate range of relevant operational situations in the workplace
In both real and simulated environments, access is required to:
relevant and appropriate materials and equipment, and
applicable documentation including workplace procedures, regulations, codes of practice and operation manuals
Method of assessment
Assessment of this unit must be undertaken by a registered training organisation
As a minimum, assessment of knowledge must be conducted through appropriate written/oral tests
Practical assessment must occur:
through activities in an appropriately simulated environment, and/or
in an appropriate range of situations in the workplace
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required knowledge and skills, the range statement and the assessment guidelines for this Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria of this unit
Context of and specific resources for assessment
Competency should be demonstrated on at least one occasion covering the scope of the unit of competence
Resources for assessment include:
a range of relevant exercises, case studies and/or other simulated practical and knowledge assessment, and/or
access to an appropriate range of relevant operational situations in the workplace
In both real and simulated environments, access is required to:
relevant and appropriate materials and equipment, and
applicable documentation including workplace procedures, regulations, codes of practice and operation manuals
Method of assessment
Assessment of this unit must be undertaken by a registered training organisation
As a minimum, assessment of knowledge must be conducted through appropriate written/oral tests
Practical assessment must occur:
through activities in an appropriately simulated environment, and/or
in an appropriate range of situations in the workplace
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AVG83 | TLIX5043 | Conduct maintenance on deployed operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W943 | TLI50510 | Diploma of Deployment Logistics | Qualification |