Unit of competency Outline

Date retreived
22/07/2026 1:41 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Conduct and report on initial construction inspections of residential buildings up to three storeys

Conduct and report on initial construction inspections of residential buildings up to three storeys

Unit of competency
National Code
CPCCBS6012
State Code
AUX79
TGA Status
Replaced
DTWD Status
Transition (Replaced)
Current Release Number
1.00
Current Release Date
05/06/2015
State Implementation and Classification
Approved Date
13/01/2016
Field of Education
040305 - Building Surveying
Original Release Date
13/01/2016
Nominal Hours
110
Description
This unit of competency specifies the outcomes required to inspect for compliance the site preparation, foundations, footings and framing of class 1 and 10 buildings and structures, as defined in the Building Code of Australia (BCA) and up to three storeys and not more than 2000 square metres in floor area. The unit supports the work of private or municipal building surveyors or certifiers who conduct mandated inspections of class 1 and 10 buildings and structures at the following initial stages of construction:site preparation, foundations and footingsframing.It applies to planning and conducting inspections, reporting on issues of non-compliance, and preparing certificates of compliance according to legislative and regulatory requirements. The certificate of compliance for each stage must be completed and processed before the next stage of construction may commence.The building surveyor or certifier must be satisfied that remedial work required in cases of non-compliance is understood by the building contractor and completed within required timeframes. This involves developing and maintaining professional and cooperative relationships with building contractors throughout a highly regulated process. Licensing, legislative, regulatory or certification requirements apply to this unit in some States. Relevant state and territory regulatory authorities should be consulted to confirm those requirements.
Notes
Elements and Performance Criteria
No information
No information
No information