Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install minor structures
Install minor structures
Unit of competency
National Code
TLIS2013A
TLIS2013A
State Code
D5335
D5335
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
10/08/2011
Field of Education
039907 - Rail Operations
Original Release Date
10/08/2011
Nominal Hours
30
Description
This unit involves the skills and knowledge required to install minor non-track bearing structures and assemblies in rail industry contexts in accordance with safeworking and regulatory requirements and workplace procedures. This includes planning and preparing for the installation, installing the structure in accordance with workplace requirements, and cleaning up the site after installation. Licensing or certification requirements may be applicable to this unit.
Notes
Elements and Performance Criteria
1Plan and prepare
- 1.1 Type of structure to be installed is identified and appropriate methods are planned in accordance with workplace procedures and specifications
- 1.2 Structure and/or materials for installation are identified, obtained and prepared in accordance with plans and specification
2Install structure
- 2.1 Where required, excavation is conducted to standards in accordance with workplace procedures and regulatory requirements
- 2.2 Where required, foundations are installed in accordance with workplace procedures and specifications
- 2.3 Components are assembled and installed in accordance with specifications and/or plans using appropriate methods
- 2.4 Level/position of structure is adjusted to required standard to maintain correct track geometry/clearances
- 2.5 Fasteners are installed and tightened in position using correct fastening method to ensure structural integrity
- 2.6 Installed structure is checked against specified requirements/plans and all required adjustments are made
3Maintain structures
- 3.1 Components requiring replacement are checked against standards and are measured for preparation of replacement component
- 3.2 Materials required for job are identified and organised as required to enable appropriate replacement of components
- 3.3 Replacement components are cut and shaped to the required standard in accordance with workplace procedures
- 3.4 Surfaces of components are treated using appropriate methods and materials as required
4Clean up site
- 4.1 Site is cleaned up to remove unnecessary materials and restore site to environmentally sound and safe condition
5Complete documentation
- 5.1 Work as executed documentation is completed as required in accordance with workplace procedures
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| S8320 | TLIS2013B | Install minor structures | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W929 | TLI32110 | Certificate III in Rail Structures | Qualification |