Unit of competency Outline
Information current as of
19/10/2026 1:32 AM AWST
19/10/2026 1:32 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install vehicle plant, equipment and systems
Install vehicle plant, equipment and systems
Unit of competency
National Code
AUMATK007
AUMATK007
State Code
WH915
WH915
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
11/03/2014
Original Release Date
10/01/2014
Nominal Hours
60
Field of Education
030717 - Plant And Machine Operations
Description
This unit describes the performance outcomes required to install the plant, equipment and systems required for the design, development and production of motor vehicles.It applies to those in an automotive manufacturing environment.No licensing, legislative or certification requirements apply to this unit at the time of publication.
General notes
N/A
Elements and Performance Criteria
1. Prepare for installation
- 1.1 Installation instructions and work plans are identified and confirmed with appropriate personnel and installation requirements are determined
- 1.2 Parts, plant and equipment required for installation are obtained according to workplace procedures and within scope of responsibilities
- 1.3 Workplace procedures for installing vehicle plant, equipment and systems are identified
- 1.4 Work site is prepared according to installation plan and requirements of the manufacturer of the component parts, plant and equipment
- 1.5 Compliance of prepared work site with design drawings, work specifications, and work health and safety (WHS) requirements is determined
2. Conduct installation
- 2.1 Pre-installation of parts, plant, equipment, fixtures and additional low voltage wiring is completed according to the installation plan and work specifications
- 2.2 Parts, plant, equipment, fixtures and additional low voltage wiring are installed according to installation plan and work specifications
- 2.3 Parts, plant, equipment, fixtures and additional low voltage wiring installations are checked against technical and safety requirements
3. Finalise installation
- 3.1 Installation is checked against design specifications, workplace quality standards, manufacturer instructions and WHS requirements
- 3.2 Installation faults are reported and rectified according to workplace procedures
- 3.3 Installation reports are completed according to workplace procedures