Unit of competency Outline
Information current as of
23/10/2026 11:49 PM AWST
23/10/2026 11:49 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Decommission mechanical signalling infrastructure and interlocking equipment from service
Decommission mechanical signalling infrastructure and interlocking equipment from service
Unit of competency
National Code
TLIS4007
TLIS4007
State Code
AVH60
AVH60
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
23/02/2016
Original Release Date
19/10/2015
Nominal Hours
40
Field of Education
030701 - Mechanical Engineering
Description
This unit involves the skills and knowledge required to decommission mechanical signalling infrastructure equipment and interlocking equipment from service in accordance with safeworking and regulatory requirements, and workplace procedures.It includes disconnecting mechanical/electromechanical equipment and components; modifying, testing and adjusting remaining equipment; and certifying and securing operational mechanical equipment in accordance with workplace requirements.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines as they apply to decommissioning mechanical signalling infrastructure and interlocking equipment from service.Work is performed under minimal supervision, generally within a team environment.It involves the application of routine operational principles and procedures when decommissioning mechanical signalling infrastructure equipment and interlocking equipment from service, as part of workplace activities across a variety of operational contexts within the Australian rail system.No licensing, legislative or certification requirements apply to this unit at the time of publication.
General notes
N/A
Elements and Performance Criteria
1 Disconnect mechanical/ interlocking equipment and components
- 1.1 Required authorisation is confirmed to ensure safe train operations may continue after mechanical/interlocking equipment components are disconnected
- 1.2 Hazards are identified, risks are assessed and control measures are implemented
- 1.3 Mechanical/interlocking equipment and components are prepared to enable ready removal
- 1.4 Mechanical/interlocking equipment components are removed from operational area and area is made safe
2 Modify, test and adjust remaining equipment
- 2.1 Remaining equipment is modified as necessary to ensure compliance with job specifications
- 2.2 Correct test equipment and procedures are identified
- 2.3 Appropriate tests are correctly carried out in conjunction with other personnel to ensure operational compliance
3 Certify and secure operational equipment
- 3.1 Operational readiness is confirmed and required documentation/certification is correctly completed and processed to allow for commissioning
- 3.2 Equipment is locked and secured to ensure against unauthorised interference
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D5357 | TLIS4007A | Decommission mechanical signalling infrastructure and interlocking equipment from service | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AD217 | TLISS00109 | Decommission Mechanical Signalling Infrastructure and Interlocking Equipment Skill Set | Skill set |