Unit of competency Outline
Date retreived
23/07/2026 12:53 AM AWST
23/07/2026 12:53 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Cut and install resilient floor coverings to stairs
Cut and install resilient floor coverings to stairs
Unit of competency
National Code
LMFFC3016A
LMFFC3016A
State Code
W0205
W0205
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
09/12/2003
Field of Education
040321 - Floor Coverings
Original Release Date
09/12/2003
Nominal Hours
24
Description
Notes
Elements and Performance Criteria
No information
The Range Statement provides advice to interpret the scope and context of this unit of competency, allowing for differences between enterprises and workplaces. It relates to the unit as a whole and facilitates holistic assessment. The following variables may be present for this particular unit:
Stairs and stairways may include:
open newell
bullnose steps
circular
recessed steps
open tread
box steps and kit winder treads
Work involves the cutting, welding, laying and fixing of resilient floor covering to stairs
Resilient flooring includes:
homogenous/heterogeneous
linoleum sheet
encapsulated glass fibre
in-laid
rotogravure
Unit context
OH&S requirements may include legislation, building codes, material safety management systems, hazardous and dangerous goods codes and local safe operating procedures
Work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements
Work requires individuals to demonstrate discretion, judgement and problem solving skills in the laying out, cutting, welding and fixing of resilient floor covering
Tools and equipment may include:
utility knife with hook
straight and concave blades
straight edge
square
chalk and chalk-line
tape measure
hacksaw
serrated trowel
hammer
seam and edge trimmer
recess scriber and pre-formed linoleum recess scribers
scribing bar
welding gun and accessories
hot air gun
grooving tool
divider
pencil cove roller
hand roller
cove gauging tool
roller
gas bottle and gun
rubber mallet
paint brush and bucket
spatula knife
builders pencil
contact bucket
linoleum trolley
liquid seam sealer
seam sealer applicator and wall trimmer
Materials are to include but are not limited to:
resilient flooring
skirting
reducing and edge strips
welding rod
coving accessories
tapes
pattern paper and adhesives
Personal protective equipment
Personal protective equipment is to include that prescribed under legislation, regulations and enterprise policies and practices
Adhesives
Plasticised and rubber resin acrylic, two-part epoxy, polyurethane and water-based and solvent-based contact adhesive
Information and procedures
Workplace procedures relating to the use and operation of tools and equipment
Workplace instructions, including job sheets, plans, drawings and designs
Workplace procedures relating to reporting and communications
Manufacturers' instructions for the use of equipment and materials
Stairs and stairways may include:
open newell
bullnose steps
circular
recessed steps
open tread
box steps and kit winder treads
Work involves the cutting, welding, laying and fixing of resilient floor covering to stairs
Resilient flooring includes:
homogenous/heterogeneous
linoleum sheet
encapsulated glass fibre
in-laid
rotogravure
Unit context
OH&S requirements may include legislation, building codes, material safety management systems, hazardous and dangerous goods codes and local safe operating procedures
Work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements
Work requires individuals to demonstrate discretion, judgement and problem solving skills in the laying out, cutting, welding and fixing of resilient floor covering
Tools and equipment may include:
utility knife with hook
straight and concave blades
straight edge
square
chalk and chalk-line
tape measure
hacksaw
serrated trowel
hammer
seam and edge trimmer
recess scriber and pre-formed linoleum recess scribers
scribing bar
welding gun and accessories
hot air gun
grooving tool
divider
pencil cove roller
hand roller
cove gauging tool
roller
gas bottle and gun
rubber mallet
paint brush and bucket
spatula knife
builders pencil
contact bucket
linoleum trolley
liquid seam sealer
seam sealer applicator and wall trimmer
Materials are to include but are not limited to:
resilient flooring
skirting
reducing and edge strips
welding rod
coving accessories
tapes
pattern paper and adhesives
Personal protective equipment
Personal protective equipment is to include that prescribed under legislation, regulations and enterprise policies and practices
Adhesives
Plasticised and rubber resin acrylic, two-part epoxy, polyurethane and water-based and solvent-based contact adhesive
Information and procedures
Workplace procedures relating to the use and operation of tools and equipment
Workplace instructions, including job sheets, plans, drawings and designs
Workplace procedures relating to reporting and communications
Manufacturers' instructions for the use of equipment and materials
The Evidence Guide identifies the critical aspects, knowledge and skills to be demonstrated to confirm competency for this unit. This is an integral part of the assessment of competency and should be read in conjunction with the Range Statement.
Critical Aspects of Evidence
Interpret work order and locate and apply relevant information
Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment
To complete a minimum of the installation of resilient flooring to:
a box step stairway, stringer and PVC stair nosing
a kite winder treads stairway, and PVC stair nosing
a bull nose step stairway PVC stair nosing
Follow work instructions, operating procedures and inspection practices to:
minimise the risk of injury to self and others
prevent damage to goods, equipment and products
maintain required production output and product quality
Work effectively with others
Modify activities to cater for variations in workplace contexts and environment
Underpinning Knowledge
The type, characteristics, uses and limitations of weldable resilient floor coverings
Forming and welding techniques for installing resilient floor coverings to stairs
The types and uses of resilient floor covering installation tools and equipment
The type, characteristics, uses and limitations of resilient floor covering installation adhesives
Workplace safety system requirements related to resilient floor covering installation
Characteristics and requirements of sub-floor preparation
Workflow in relation to cutting, welding and laying resilient flooring to stairs
Underpinning Skills
Information. Collect, organise and understand information related to work orders, plans and safety procedures
Communication. Communicate ideas and information to enable confirmation of work requirements and specifications, coordination of work with site supervisor, other workers and customers, and the reporting of work outcomes and problems
Planning. Plan and organise activities including the preparation and layout of the worksite and the obtaining of equipment and materials to avoid any back tracking, workflow interruptions or wastage
Teamwork. Work with others and in a team by recognising dependencies and using cooperative approaches to optimise workflow and productivity
Mathematical ideas and techniques. Use mathematical ideas and techniques to correctly complete measurements, calculate area, estimate resilient sheeting requirements and other material requirements
Solve problems. Use pre-checking and inspection techniques to anticipate installation problems, avoid reworking and avoid wastage
Use of technology. Use workplace technology related to the installation of resilient floor covering including tools, equipment, calculators and measuring devices
Resource Implications
Resilient floor covering, resilient flooring welding equipment and materials, tools and equipment, adhesives and tapes, trims, accessories and stairs requiring floor covering.
Method of Assessment
Assessment methods must confirm consistency of performance over time and in a range of workplace relevant contexts.
Assessment should be by direct observation of tasks and questioning on underpinning knowledge.
Assessment may be in conjunction with assessment of other relevant units of competency.
Context of Assessment
Assessment may occur on the job or in a workplace simulated facility with relevant resilient floor covering installation equipment, materials, work instructions and deadlines.
Key Competency Levels
NB:These levels do not relate to the Australian Qualifications Framework. They relate to the seven areas of generic competency that underpin effective workplace practices.
There are three levels available:
Level 1 where work is within set conditions and process
Level 2 where the management or facilitation of conditions or process is exercises; and
Level 3 where the design and/or development of conditions or process is required
Communicating ideas and information
(1)
Collecting analysing and organising information
(1)
Planning and organising activities
(2)
Working with others and in teams
(1)
Using mathematical ideas and techniques
(1)
Solving problems
(2)
Using technology
(1)
Critical Aspects of Evidence
Interpret work order and locate and apply relevant information
Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment
To complete a minimum of the installation of resilient flooring to:
a box step stairway, stringer and PVC stair nosing
a kite winder treads stairway, and PVC stair nosing
a bull nose step stairway PVC stair nosing
Follow work instructions, operating procedures and inspection practices to:
minimise the risk of injury to self and others
prevent damage to goods, equipment and products
maintain required production output and product quality
Work effectively with others
Modify activities to cater for variations in workplace contexts and environment
Underpinning Knowledge
The type, characteristics, uses and limitations of weldable resilient floor coverings
Forming and welding techniques for installing resilient floor coverings to stairs
The types and uses of resilient floor covering installation tools and equipment
The type, characteristics, uses and limitations of resilient floor covering installation adhesives
Workplace safety system requirements related to resilient floor covering installation
Characteristics and requirements of sub-floor preparation
Workflow in relation to cutting, welding and laying resilient flooring to stairs
Underpinning Skills
Information. Collect, organise and understand information related to work orders, plans and safety procedures
Communication. Communicate ideas and information to enable confirmation of work requirements and specifications, coordination of work with site supervisor, other workers and customers, and the reporting of work outcomes and problems
Planning. Plan and organise activities including the preparation and layout of the worksite and the obtaining of equipment and materials to avoid any back tracking, workflow interruptions or wastage
Teamwork. Work with others and in a team by recognising dependencies and using cooperative approaches to optimise workflow and productivity
Mathematical ideas and techniques. Use mathematical ideas and techniques to correctly complete measurements, calculate area, estimate resilient sheeting requirements and other material requirements
Solve problems. Use pre-checking and inspection techniques to anticipate installation problems, avoid reworking and avoid wastage
Use of technology. Use workplace technology related to the installation of resilient floor covering including tools, equipment, calculators and measuring devices
Resource Implications
Resilient floor covering, resilient flooring welding equipment and materials, tools and equipment, adhesives and tapes, trims, accessories and stairs requiring floor covering.
Method of Assessment
Assessment methods must confirm consistency of performance over time and in a range of workplace relevant contexts.
Assessment should be by direct observation of tasks and questioning on underpinning knowledge.
Assessment may be in conjunction with assessment of other relevant units of competency.
Context of Assessment
Assessment may occur on the job or in a workplace simulated facility with relevant resilient floor covering installation equipment, materials, work instructions and deadlines.
Key Competency Levels
NB:These levels do not relate to the Australian Qualifications Framework. They relate to the seven areas of generic competency that underpin effective workplace practices.
There are three levels available:
Level 1 where work is within set conditions and process
Level 2 where the management or facilitation of conditions or process is exercises; and
Level 3 where the design and/or development of conditions or process is required
Communicating ideas and information
(1)
Collecting analysing and organising information
(1)
Planning and organising activities
(2)
Working with others and in teams
(1)
Using mathematical ideas and techniques
(1)
Solving problems
(2)
Using technology
(1)
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8571 | LMFFL3310A | Cut and install resilient floor coverings to stairs | Unit of competency |