Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Implement an outdoor tiling project
Implement an outdoor tiling project
Unit of competency
National Code
AHCLSC315
AHCLSC315
State Code
ODU44
ODU44
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
31/05/2022
Field of Education
040399 - Building, N.e.c.
Original Release Date
31/05/2022
Nominal Hours
35
Description
This unit of competency describes the skills and knowledge required to install and construct a paved surface, including preparing for tiling project, setting out and preparing site, implementing the tiling project, checking and cleaning up site.The unit applies to individuals who implement an outdoor tiling project under broad direction, and take responsibility for their own work and for the quality of the work of others.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Prepare for tiling project
- 1.1 Interpret site plans and specifications
- 1.2 Identify potential hazards and risks, and implement safe working practices to manage risks
- 1.3 Select materials, tools and equipment required to implement an outdoor tiling project and check for safe operation
- 1.4 Identify environmental impacts of proposed works and implement controls if required
- 1.5 Select, fit, use and maintain personal protective equipment (PPE) applicable to the task
- 1.6 Organise delivery of materials to site according to workplace priorities
2. Set out and prepare the site
- 2.1 Erect site bunting, control pedestrian access and place safety signage
- 2.2 Assess existing base material where applicable
- 2.3 Set out tiles to determine tiling pattern and identify cutting requirements according to site plans and specifications
- 2.4 Create template to form accurate curves and edges for tiled surfaces around walls and structures
3. Implement tiling project
- 3.1 Identify location of first tile
- 3.2 Prepare mortar and adhesive according to manufacturer specifications
- 3.3 Lay first tile
- 3.4 Lay tiles according to tiling pattern, with perimeter tiles marked and cut to fit template requirements
- 3.5 Fix tiles to specified grade, flush and square
- 3.6 Mix grout and apply to joints according to specifications, to provide flush and smooth finish
- 3.7 Polish or clean tiled surface according to manufacturer specifications
4. Check quality of work and clean-up site
- 4.1 Inspect the quality of finished works to ensure standard of finished tiling project is in accordance with site plans and specifications
- 4.2 Clean work-site and dispose of or recycle waste material from site
- 4.3 Clean, maintain and store tools and equipment
- 4.4 Identify and report unserviceable tools and equipment according to workplace procedures