Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Insert tie bars in fresh concrete
Insert tie bars in fresh concrete
Unit of competency
National Code
RIICRC323
RIICRC323
State Code
WC342
WC342
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
16/08/2012
Field of Education
030901 - Construction Engineering
Original Release Date
16/08/2012
Nominal Hours
8
Description
This unit covers the insertion of tie bars in fresh concrete operations in the civil construction industry. It includes planning and preparing, setting up, conducting the insertion of tie bars into fresh concrete and cleaning up. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories and industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare for operations
- 1.1 Access, interpret and apply compliance documentation relevant to the work activity
- 1.2 Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
- 1.3 Identify, obtain and implement signage requirements from the project traffic management plan
- 1.4 Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults
- 1.5 Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task
2. Setup operations
- 2.1 Verify quantity of bars meet task requirements
- 2.2 Confirm bars are fit for purpose
- 2.3 Confirm saw cut locations are marked out or programmed into paving computer as per site specifications
- 2.4 Check automatic program spacing
- 2.5 Check tie bar spacing and variations conform to plans
- 2.6 Check for safe operations and confirm operation of emergency stops
3. Operate tie bar system
- 3.1 Maintain safe working area around tie bar inserter
- 3.2 Maintain adequate stock of bars at tie bar inserter
- 3.3 Operate and monitor mechanical or manual tie bar insertion for correct location, alignment and depth (if sidebars)
- 3.4 Report missed bars or jamming immediately to the relevant personnel
- 3.5 Ensure location of any missed or non compliant insertion is recorded by relevant site personnel
- 3.6 Ensure concrete is fully compacted around the tie bar
- 3.7 Ensure magazine is sufficiently loaded at all times
- 3.8 Operate hiab (if fitted) to load magazine safely and accurately
- 3.9 Load magazine by hand according to correct procedures
4. Clean Up
- 4.1 Clean up work area at end of day
- 4.2 Return unused stockbars to store
Relevant compliance documentation may include:
legislative, organisational and site requirements and procedures
manufacturer’s guidelines and specifications
Australian standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Safety requirements may include:
OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances
safe operating procedures including recognising and preventing hazards associated with high voltage power lines, uneven/unstable terrain, trees, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working at heights, working in proximity to others, worksite visitors and the public
safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distance are kept from excavations, and areas secured from unauthorised access or movement
recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational first aid requirements and evacuation
Site may include:
formed/prepared roads
pads
highways and major arterial roads
freeways
car and truck parks
container yards
Task may include:
loading magazine
operating manual or automatic tie bar inserter
spreading concrete materials
Traffic may include:
congested urban environments
low traffic rural areas
off-road un-trafficked areas
parking sites
pedestrian areas
Plant, tools and equipment may include:
measuring tapes
depth gauges
standard tool kits
string lines
straight edges
screed
hiab
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust and clean-up management
legislative, organisational and site requirements and procedures
manufacturer’s guidelines and specifications
Australian standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Safety requirements may include:
OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances
safe operating procedures including recognising and preventing hazards associated with high voltage power lines, uneven/unstable terrain, trees, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working at heights, working in proximity to others, worksite visitors and the public
safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distance are kept from excavations, and areas secured from unauthorised access or movement
recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational first aid requirements and evacuation
Site may include:
formed/prepared roads
pads
highways and major arterial roads
freeways
car and truck parks
container yards
Task may include:
loading magazine
operating manual or automatic tie bar inserter
spreading concrete materials
Traffic may include:
congested urban environments
low traffic rural areas
off-road un-trafficked areas
parking sites
pedestrian areas
Plant, tools and equipment may include:
measuring tapes
depth gauges
standard tool kits
string lines
straight edges
screed
hiab
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust and clean-up management
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for the insertion of tie bars into fresh concrete
implementation of requirements, procedures and techniques for the safe, effective and efficient insertion of tie bars into fresh concrete
working with others to undertake the insertion of tie bars into fresh concrete that meets all of the required outcomes
consistent timely insertion of tie bars into fresh concrete that safely, effectively and efficiently meets the required outcomes
identify and correctly mark onsite changes in tie bar spacing from the plans
conduct insertion and compaction of tie bars to correct depth over 75 linear metres on a minimum of three (3) occasions
load a magazine on at least one occasion in accordance with manufacturer’s procedures
set out manually inserted tie bars and corresponding saw cuts
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate’s required knowledge
observed, documented and/or first hand testimonial evidence of the candidate’s:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate’s:
working with others to undertake and complete the insertion of tie bars in fresh concrete
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for the insertion of tie bars into fresh concrete
implementation of requirements, procedures and techniques for the safe, effective and efficient insertion of tie bars into fresh concrete
working with others to undertake the insertion of tie bars into fresh concrete that meets all of the required outcomes
consistent timely insertion of tie bars into fresh concrete that safely, effectively and efficiently meets the required outcomes
identify and correctly mark onsite changes in tie bar spacing from the plans
conduct insertion and compaction of tie bars to correct depth over 75 linear metres on a minimum of three (3) occasions
load a magazine on at least one occasion in accordance with manufacturer’s procedures
set out manually inserted tie bars and corresponding saw cuts
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate’s required knowledge
observed, documented and/or first hand testimonial evidence of the candidate’s:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate’s:
working with others to undertake and complete the insertion of tie bars in fresh concrete
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH139 | RIICRC323D | Insert tie bars in fresh concrete | Unit of competency |