Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Modify complex electrical equipment
Modify complex electrical equipment
Unit of competency
National Code
UTPNEG127A
UTPNEG127A
State Code
S3752
S3752
TGA Status
Replaced
Replaced
DTWD Status
Archived
Archived
State Implementation and Classification
Approved Date
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
Nominal Hours
60
Description
Notes
Elements and Performance Criteria
No information
Stream: Production Plant
Field: Maintenance
Equivalencies: This unit of competence is based on unit 7.4 of the Electrical Contractors
Industry Association Competency Standards (electrical stream)
Inspection should be planned with the appropriate parties to determine access, conditions and work requirements
Equipment may include HV transformers, tap changers, switchgear and associatedcontrol panels, alarms, alternators, igniters, flame scanners, unit control panels, mimic panels, conveyors, alternator cooling systems, automatic voltage regulators, sootblowers, vibratory feeders, battery chargers, precipitators and overhead cranes
Materials may include masonry anchors, bolts, nuts, washers, screws, rivets, saddles, clips, brackets, solvents, adhesives, insulation tapes, heat shrink, sleeving, spiral binding, cable ties, solder, lubricants, oil, greases, sealants, lugs, connectors, terminal blocks, cable markers, identification labels, transformer oil, jointing compound, cable compounds and phase markers
Components may include fuses/circuit breakers, timers, contactors, contacts, coils, relays, solenoids, overloads, switches, plugs, busbar, cable, fans, thermostats, , seals and motor bearings and brush gear
Test and measurement instruments may include multimeters, tong testers, insulation resistance/continuity tester, ductor tester, growlers, overload injection tester, liquid leak tester, pressure gauges and vacuum gauges
Work may be performed with equipment on line
Work completion details may include plant and maintenance records, job cards, check sheets and on device labelling updates
Work site environment may be affected by nearby plant or processes, e.g. heat, noise, dust, oil, water and chemical
Isolations can refer to electrical/mechanical or other associated processes
Field: Maintenance
Equivalencies: This unit of competence is based on unit 7.4 of the Electrical Contractors
Industry Association Competency Standards (electrical stream)
Inspection should be planned with the appropriate parties to determine access, conditions and work requirements
Equipment may include HV transformers, tap changers, switchgear and associatedcontrol panels, alarms, alternators, igniters, flame scanners, unit control panels, mimic panels, conveyors, alternator cooling systems, automatic voltage regulators, sootblowers, vibratory feeders, battery chargers, precipitators and overhead cranes
Materials may include masonry anchors, bolts, nuts, washers, screws, rivets, saddles, clips, brackets, solvents, adhesives, insulation tapes, heat shrink, sleeving, spiral binding, cable ties, solder, lubricants, oil, greases, sealants, lugs, connectors, terminal blocks, cable markers, identification labels, transformer oil, jointing compound, cable compounds and phase markers
Components may include fuses/circuit breakers, timers, contactors, contacts, coils, relays, solenoids, overloads, switches, plugs, busbar, cable, fans, thermostats, , seals and motor bearings and brush gear
Test and measurement instruments may include multimeters, tong testers, insulation resistance/continuity tester, ductor tester, growlers, overload injection tester, liquid leak tester, pressure gauges and vacuum gauges
Work may be performed with equipment on line
Work completion details may include plant and maintenance records, job cards, check sheets and on device labelling updates
Work site environment may be affected by nearby plant or processes, e.g. heat, noise, dust, oil, water and chemical
Isolations can refer to electrical/mechanical or other associated processes
Critical aspects of evidence
The knowledge and application of relevant sections of: Occupational, health and safety legislation; Statutory legislation; Enterprise/site safety procedures; Enterprise/site emergency procedures
Attainment of electrical licence, deeming competency associated with electrical work
Preparation and planning of work
Modification techniques and procedures
Completion of work procedures
Context of assessment
Competency Standards should be assessed in the workplace or simulated workplace and under the normal range of workplace conditions
Assessment of this unit will be supported with documentary evidence, by means of endorsement stating type and application of work
Interdependent assessment of unit
Nil
Knowledge and Skills
A knowledge of:
Occupational health and safety standards; Relevant statutory requirements and codes of practice; Relevant Australian standards; Equipment and material required to perform the work; Isolation procedures; General layout of plant/work site and operation of its equipment; Modification techniques; Complex electrical equipment; Regulatory procedures; Electrical principles; Test and measurement instruments; Circuit plan appreciation; Engineering and workshop practice; Communication principles
The ability to:
Apply occupational health and safety standards; Follow relevant statutory regulations and codes of practice; Apply relevant Australian standards; Use and update plans, drawings and texts; Use tools and relevant equipment; Use test and measurement instruments; Modify complex electrical equipment; Select materials for the job; Apply regulatory procedures; Apply electrical principles; Carry out work completion details; Apply data analysis techniques and tools; Communicate effectively.
The knowledge and application of relevant sections of: Occupational, health and safety legislation; Statutory legislation; Enterprise/site safety procedures; Enterprise/site emergency procedures
Attainment of electrical licence, deeming competency associated with electrical work
Preparation and planning of work
Modification techniques and procedures
Completion of work procedures
Context of assessment
Competency Standards should be assessed in the workplace or simulated workplace and under the normal range of workplace conditions
Assessment of this unit will be supported with documentary evidence, by means of endorsement stating type and application of work
Interdependent assessment of unit
Nil
Knowledge and Skills
A knowledge of:
Occupational health and safety standards; Relevant statutory requirements and codes of practice; Relevant Australian standards; Equipment and material required to perform the work; Isolation procedures; General layout of plant/work site and operation of its equipment; Modification techniques; Complex electrical equipment; Regulatory procedures; Electrical principles; Test and measurement instruments; Circuit plan appreciation; Engineering and workshop practice; Communication principles
The ability to:
Apply occupational health and safety standards; Follow relevant statutory regulations and codes of practice; Apply relevant Australian standards; Use and update plans, drawings and texts; Use tools and relevant equipment; Use test and measurement instruments; Modify complex electrical equipment; Select materials for the job; Apply regulatory procedures; Apply electrical principles; Carry out work completion details; Apply data analysis techniques and tools; Communicate effectively.
No information
| State Code | National Code | Title | Type |
|---|---|---|---|
| BBG6 | UTP40198 | Certificate IV in ESI Generation (Electrical/Electronic) | Qualification |