Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install and maintain de-energised high voltage underground polymeric cables

Install and maintain de-energised high voltage underground polymeric cables

Unit of competency
National Code
UETTDRCJ27
State Code
OBI34
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
25/09/2019
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
04/12/2019
Nominal Hours
45
Description
This unit involves the skills and knowledge required to install and maintain de-energised high voltage (HV) underground polymeric cables in the electricity supply industry (ESI).It includes jointing, terminating, repairing and replacing cables; isolating systems and circuits and following procedures of for accepting electrical access permits. It also includes using equipment, tools and materials; undertaking pre-commissioning and/or re-commissioning tests and updating system data/maintenance records.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare to install and maintain de-energised HV underground polymeric cables
  • 1.1 Work plan, construction plans, drawings, workplace procedures and material lists are received, confirmed and communicated with relevant personnel
  • 1.2 Job requirements and workplace procedures are identified and communicated with relevant personnel
  • 1.3 Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the installation and maintenance of de-energised HV underground polymeric cables are obtained and confirmed for the purposes of the work to be performed
  • 1.4 Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
  • 1.5 WHS/OHS and environmental hazards are identified, WHS/OHS risks are assessed and control measures identified in accordance with workplace procedures
  • 1.6 Relevant work permits are confirmed and signed in accordance with workplace procedures
  • 1.7 Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
  • 1.8 Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
  • 1.9 Traffic management plan is confirmed as being applied in accordance with workplace procedures
2 Carry out the installation and maintenance of de-energised HV underground polymeric cables
  • 2.1 WHS/OHS, sustainable energy and environmental principles and practices are monitored and followed to reduce incidents in accordance with workplace procedures
  • 2.2 Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
  • 2.3 Systems and circuits are isolated as required, proved safe to work on in accordance with workplace procedures
  • 2.4 De-energised HV underground polymeric cables are installed in accordance with the work schedule and workplace procedures
  • 2.5 Maintenance, including repair and/or replacement of de-energised HV undergroundpolymeric cables is carried out in accordance with the work schedule and workplace procedures
  • 2.6 Unplanned events are responded to in accordance with workplace procedures
  • 2.7 Quality checks of work are undertaken in accordance with workplace procedures
3 Complete installation and maintenance of de-energised HV underground polymeric cables
  • 3.1 Completed work is checked against work plan, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures
  • 3.2 WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
  • 3.3 Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
  • 3.4 Tools, equipment and surplus resources are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
  • 3.5 Relevant work permits are signed off and HV underground polymeric cables are returned to service in accordance with workplace procedures
  • 3.6 Work records, reports and/or documentation are completed in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WD606 UETTDRCJ27A Install and maintain de-energised high voltage underground polymeric cables Unit of competency
Replaced By
State Code National Code Title Type
ODN00 UETDRDU013 Joint, terminate and maintain high voltage underground polymeric cable Unit of competency