Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Perform advanced tower crane erection

Perform advanced tower crane erection

Unit of competency
National Code
CPCCRI3006A
State Code
W9489
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040329 - Scaffolding And Rigging
Original Release Date
20/06/2014
Nominal Hours
20
Description
Notes
Elements and Performance Criteria
No information
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to performing advanced tower crane erection
relevant Australian standards
safe work procedures relating to performing advanced tower crane erection
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.

planning and preparation includes work site inspection, equipment defect identification, assessment of conditions and hazards and determination of work requirements
calculations include load charts, fleet angles, diverter sheaves, lead loads, head loads, load angle factors, multiple fall, load share, load share distribution, pre-cast compliance charts and safe working loads
sling types include chain, flexible steel wire rope, and natural or synthetic fibre
load slinging methods include straight sling, adjustable sling, reeved sling and inclined sling
personal cartage systems include personnel boxes and elevated work platforms
types of cranes to be used in erection include fixed cranes, tower cranes, hydraulic mobile cranes, lattice boom mobile cranes, slewing cranes
types of cranes to be erected include hammerhead tower cranes, luffing boom tower cranes and self erecting tower cranes
crane components to be erected include crane bases, bottom towers, tower sections, climbing frame/transition pieces, tower braces, guys, masts, turntables, machine decks, power packs, main jibs, counter jibs, counter weights, wire ropes, hook and block reeving and connecting bolts.

emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances, including cement and curing agents
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
working at heights
work site visitors and the public
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.

include:
air winches
chain blocks
chain winches
come alongs
drifts
eye bolts
hammers
hand operated creeper winches
jacks
plumbing/levelling equipment
pneumatic wrenches
podgers spanners
pulley blocks
shackles
shifting spanners
sledge hammers
spirit levels and automatic levels
tape measures
torque multipliers
trolleys
turn buckles
wedges
wrenches
may include:
angle grinders
elevated work platforms
explosive power tools
hydraulic jacks
laser levels
lifting clutches and snatch blocks
lifting lugs
oxy-acetylene equipment
pneumatic tools
rigging screws
skates
skids
water levelling equipment
winches and rails.

Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.

clean-up management
dust and noise
vibration
waste management.

federal, state and local authorities administering the applicable Acts, regulations and codes of practice.

Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

locate, interpret and apply of relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
fully erect and rig one hammerhead tower crane and one luffing boom tower crane (including a jib for each) to manufacturer and engineer's specifications
complete the raising of one hammerhead tower crane and one luffing boom tower crane by installing at least two extra sections for each.

Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Integrated Framework Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.

Replaces
State Code National Code Title Type
W1870 BCGRI3006B Perform advanced tower crane erection Unit of competency
Replaced By
State Code National Code Title Type
D7403 CPCCRI3016A Perform advanced tower crane erection Unit of competency