Unit of competency Outline
Date retreived
23/07/2026 1:23 PM AWST
23/07/2026 1:23 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install domestic solid fuel burning appliances
Install domestic solid fuel burning appliances
Unit of competency
National Code
CPCPMS3041
CPCPMS3041
State Code
OCN21
OCN21
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040327 - Plumbing
Original Release Date
01/06/2021
Nominal Hours
20
Description
This unit specifies the skills and knowledge required to install domestic solid fuel burning appliances.In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, regulatory or certification requirements.
Notes
Elements and Performance Criteria
1 Prepare for installation.
- 1.1 Access, read and determine domestic solid fuel burning appliances requirements from job specifications, relevant Australian Standards, codes, manufacturer`s specifications and jurisdictional requirements.
- 1.2 Identify and apply workplace policies and procedures, work health and safety (WHS) and environmental requirements.
- 1.3 Inspect installation sites and confirm appliance installation locations as suitable or negotiate alternative locations with clients.
- 1.4 Confirm heat sensitivities of building materials at appliance installation locations and confirm heat protection strategies with clients.
- 1.5 Select and check the serviceability of the appropriate tools, equipment and personal protective equipment (PPE).
2 Install appliance.
- 2.1 Measure and mark appliance location according to compliance requirements.
- 2.2 Measure, cut or make up floor and wall protection materials and install according to compliance requirements.
- 2.3 Position appliance and check clearance distances to confirm compliance.
- 2.4 Install appliance according to compliance and organisational requirements.
3 Install flue.
- 3.1 Check flue dimensions and components and obtain additional sections or components as required to meet compliance requirements.
- 3.2 Calculate, measure, mark and check locations and dimensions of ceiling and roof penetrations according to compliance and organisational requirements.
- 3.3 Make penetrations to host materials with minimal damage and according to specifications and organisational requirements.
- 3.4 Install structural supports according to plans and specifications.
- 3.5 Prepare opening in compliance with specifications, manufacturer recommendations and regulations.
- 3.6 Install flue and associated components according to compliance and organisational requirements.
- 3.7 Apply flashings and sealants to restore integrity of ceilings and roofs according to compliance and organisational requirements.
- 3.8 Performance test penetration to ensure correct fit of completed installation, and take remedial action as required.
4 Finalise installation and clean up.
- 4.1 Install appliance and associated components and check for complete and correct installation and operation according to compliance and organisational requirements.
- 4.2 Demonstrate operation of appliance to clients and explain factors that affect optimum performance.
- 4.3 Restore installation site and clean tools and equipment, check for serviceability and report any damage, and store and secure.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WF924 | CPCPMS3041A | Install domestic solid fuel burning appliances | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGC2 | CPC32420 | Certificate III in Plumbing | Qualification |