Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Conduct guided boring

Conduct guided boring

Unit of competency
National Code
RIINHB309E
State Code
AWB57
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
14/12/2015
State Implementation and Classification
Approved Date
14/07/2016
Field of Education
030303 - Mining Engineering
Original Release Date
14/07/2016
Nominal Hours
60
Description
This unit describes a participant’s skills and knowledge required to conduct guided boring in the drilling and civil construction sectors.This unit is appropriate for those working in operational roles.Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of this unit.
Notes
Elements and Performance Criteria
1. Plan and prepare for guided boring
  • 1.1 Access, interpret and apply guided boring documentation and ensure the work activity is compliant
  • 1.2 Obtain, read, interpret, clarify and confirm work requirements
  • 1.3 Identify and address potential risks, hazards and environmental issues and implement control measures
  • 1.4 Select and wear personal protective equipment appropriate for work activities
  • 1.5 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
  • 1.6 Communicate and coordinate activities with others throughout the work activity
2. Bore pilot hole
  • 2.1 Carry out pre-start and start up procedures
  • 2.2 Identify, select and apply rig operational controls
  • 2.3 Fit locating device to drill head and attach drill head to drill stem
  • 2.4 Align drilling head with survey tool and survey control system
  • 2.5 Drill pilot hole according to design alignment
  • 2.6 Monitor drill path ensuring pilot hole meets conformance envelope and dogleg severity is within limits
  • 2.7 Add drill stem sections as required
  • 2.8 Steer, and where required, zone steer drill head to achieve required pitch and direction
  • 2.9 Monitor and interpret all gauge/dial readings
  • 2.10 Monitor and interpret drill fluid return and drill spoil
  • 2.11 Monitor and interpret drill head position and pitch
  • 2.12 Maintain communication with all relevant personnel
  • 2.13 Maintain drill log and reports as required
3. Complete back reaming, and product pull back
  • 3.1 Lock out machine
  • 3.2 Remove drill head
  • 3.3 Check free rotation of swivel
  • 3.4 Connect appropriate back reamer, swivel and product
  • 3.5 Locate product feed to prevent damage and within breakover limitations
  • 3.6 Check all safety precautions are in place and restart machine
  • 3.7 Back reaming/pre-ream, and install product, removing drill stem sections
  • 3.8 Monitor and interpret all gauge/dial readings
  • 3.9 Monitor and interpret drill fluid flow from both ends of hole
  • 3.10 Monitor product feed
  • 3.11 Continually monitor hazards and risks, and ensure safety of self, other personnel, plant and equipment
  • 3.12 Take required actions to achieve satisfactory product installation as required
  • 3.13 Maintain drill log and reports as required
4. Respond to problems
  • 4.1 Identify possible problems in equipment or process
  • 4.2 Determine problems needing action
  • 4.3 Determine possible fault causes
  • 4.4 Rectify problem using appropriate solution within area of responsibility
  • 4.5 Follow through items initiated until final resolution has occurred
  • 4.6 Report problems outside area of responsibility to designated person
5. Complete equipment maintenance and housekeeping
  • 5.1 Carry out shutdown and secure equipment
  • 5.2 Monitor wear on drill stem, particularly threads
  • 5.3 Dress damaged threads or replace drill stem as required
  • 5.4 Check all equipment and hoses
  • 5.5 Monitor wear on drill heads and reamers and take required action
  • 5.6 Clean all equipment upon completion of bore, ensuring environmental controls are followed
  • 5.7 Rotate drill stems in stack
  • 5.8 Ensure drill fluid is appropriately contained/disposed of
  • 5.9 Ensure maintenance schedules are followed
  • 5.10 Ensure housekeeping activities are completed
  • 5.11 Process records
No information
No information
Replaces
State Code National Code Title Type
WH478 RIINHB309D Conduct guided boring Unit of competency
State Code National Code Title Type
BFI5 RII31820 Certificate III in Drilling Operations Qualification