Unit of competency Outline
Date retreived
22/07/2026 4:54 PM AWST
22/07/2026 4:54 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Apply quick changeover procedures
Apply quick changeover procedures
Unit of competency
National Code
ICPSU357C
ICPSU357C
State Code
D3270
D3270
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
09/09/2014
Field of Education
080307 - Organisation Management
Original Release Date
09/09/2014
Nominal Hours
20
Description
This unit describes the performance outcomes, skills and knowledge required to carry out quick operational changeovers.
Notes
Elements and Performance Criteria
1. Prepare for changeover
- 1.1. Timing of changeover is determined according to production schedule
- 1.2. All required tools/parts/materials are obtained for changeover
- 1.3. Process and tools/parts/materials are organised ready for changeover
- 1.4. Liaison with relevant people is conducted for quick changeover
2. Make quick changeover
- 2.1. Quick changeover is planned according to quick changeover principles
- 2.2. Changeover is completed according to enterprise procedures
- 2.3. Output is checked to meet specifications
- 2.4. Any steps which cause a problem are noted and changes recommended to problematic steps
3. Improve OHS
- 3.1. Hazards in all steps/actions are identified
- 3.2. Risks from each hazard are determined
- 3.3. Actions which may be performed in a more ergonomic manner are identified
- 3.4. Changes are recommended to improve OHS
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Changeover may include:
an exchange of dies/tools (traditional), or a change between batches, or it may be any quantum equipment/process change to produce a different product eg plate changeover, stock change producing only the one product or simultaneous range of products. This is not applicable to a maintenance/PVI shutdown as experienced by continuous process manufacturers.
Procedures may include:
procedures includes all work instructions, standard operating procedures, formulas/recipes, batch sheets, temporary instructions and similar instructions provided for the smooth running of the plant. They may be written, oral, computer-based or in some other form.
SMED may include:
changeover is sometimes referred to as SMED which is a more extreme form where SMED is an abbreviation for Single Minute Exchange of Die; literally, changing a die on a forming or stamping machine in a minute or less; broadly, the ability to perform any set up activity in a minute or less of machine or process downtime. The key to doing this is frequently the capability to convert internal set up time to external set up time. Variations on SMED include:
single-digit set up performing a set up activity in a single-digit number of minutes, ie fewer than ten
OTED: One touch exchange of die; literally, changing a die with one physical motion such as pushing a button; broadly, an extremely simple procedure for performing a set up activity.
Set up time may include:
set up time - work required to change over a machine or process from one item or operation to the next item or operation. It can be divided into two types:
internal set up work that can be done only when the machine or process is not actively engaged in production; OR
external set up work that can be done concurrently with the machine or process performing production duties.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Changeover may include:
an exchange of dies/tools (traditional), or a change between batches, or it may be any quantum equipment/process change to produce a different product eg plate changeover, stock change producing only the one product or simultaneous range of products. This is not applicable to a maintenance/PVI shutdown as experienced by continuous process manufacturers.
Procedures may include:
procedures includes all work instructions, standard operating procedures, formulas/recipes, batch sheets, temporary instructions and similar instructions provided for the smooth running of the plant. They may be written, oral, computer-based or in some other form.
SMED may include:
changeover is sometimes referred to as SMED which is a more extreme form where SMED is an abbreviation for Single Minute Exchange of Die; literally, changing a die on a forming or stamping machine in a minute or less; broadly, the ability to perform any set up activity in a minute or less of machine or process downtime. The key to doing this is frequently the capability to convert internal set up time to external set up time. Variations on SMED include:
single-digit set up performing a set up activity in a single-digit number of minutes, ie fewer than ten
OTED: One touch exchange of die; literally, changing a die with one physical motion such as pushing a button; broadly, an extremely simple procedure for performing a set up activity.
Set up time may include:
set up time - work required to change over a machine or process from one item or operation to the next item or operation. It can be divided into two types:
internal set up work that can be done only when the machine or process is not actively engaged in production; OR
external set up work that can be done concurrently with the machine or process performing production duties.
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
routine positive participation in quick changeover procedures
assessment will need to occur in an organisation using quick changeover or a suitable simulation in say a workshop.
Context of and specific resources for assessment
Assessment must ensure:
assessment may take place on the job, off the job or a combination of these. Off the job assessment must be undertaken in a closely simulated workplace environment
machinery for changeover.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct questioning combined with review of portfolios of evidence and third party workplace reports of on-the-job performance by the candidate.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended.
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
routine positive participation in quick changeover procedures
assessment will need to occur in an organisation using quick changeover or a suitable simulation in say a workshop.
Context of and specific resources for assessment
Assessment must ensure:
assessment may take place on the job, off the job or a combination of these. Off the job assessment must be undertaken in a closely simulated workplace environment
machinery for changeover.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct questioning combined with review of portfolios of evidence and third party workplace reports of on-the-job performance by the candidate.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D0520 | ICPSU357B | Apply quick changeover procedures | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AUN43 | ICPSUP357 | Apply quick changeover procedures | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W787 | ICP40510 | Certificate IV in Printing and Graphic Arts (Mail House) | Qualification |
| J186 | ICP30712 | Certificate III in Printing and Graphic Arts (Print Finishing) | Qualification |
| W764 | ICP20410 | Certificate II in Printing and Graphic Arts (Print Production Support) | Qualification |
| J184 | ICP30512 | Certificate III in Printing and Graphic Arts (Printing) | Qualification |
| W776 | ICP30510 | Certificate III in Printing and Graphic Arts (Printing) | Qualification |
| W767 | ICP20710 | Certificate II in Printing and Graphic Arts (Sacks and Bags) | Qualification |