Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Conduct commercial and structural re-glazing

Conduct commercial and structural re-glazing

Unit of competency
National Code
MSFGG3019
State Code
WI501
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
10/12/2013
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
040323 - Glazing
Original Release Date
19/06/2014
Nominal Hours
40
Description
This of competency unit covers replacing glass in commercial, structural and/or architectural engineered applications.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking glass and glazing work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Identify work requirements
  • 1.1 Work requirements in the form of type of glass, frames and the method of fixing are identified from work instructions
  • 1.2 Work health and safety (WHS) requirements for fabrication and installation of commercial re-glazing, including personal protective equipment, are identified and observed throughout the work
  • 1.3 The process for fabricating and installing commercial re-glazing is identified
2 Prepare for work
  • 2.1 Work sequence is planned in a logical order to suit the job and workplace requirements
  • 2.2 Tools, equipment and materials, other than glass and frames, are selected and checked prior to use to ensure they are appropriate for the work, serviceable and in a safe condition
  • 2.3 Type of glass to be fitted and frames are selected to match the customer order, existing glass type, requirements for security, noise or light control and relevant Australian Standards
  • 2.4 Glass fixing method is selected to meet specifications
  • 2.5 Glass is checked for type, size and imperfections
3 Identify site conditions and constraints
  • 3.1 Site safety hazards are recognised and corrective action taken to reduce injury to self and others including working at heights and on scaffolding
  • 3.2 Other on-site difficulties are recognised and corrective action taken in accordance with regulations and glazing requirements
  • 3.3 Covering material is applied, where necessary, to protect existing fixtures and fittings
  • 3.4 Special characteristics of the window or door which may affect the finished job are identified and corrective action taken
4 Prepare frame and materials
  • 4.1 Frame condition, if applicable, is assessed to ensure suitability for re-glazing in accordance with customer requirements and Australian Standards
  • 4.2 Defective frames are reported for repair or replacement in accordance with workplace procedures
  • 4.3 Frame is prepared, if required, to receive glass
  • 4.4 Fixing and sealing materials are prepared by mixing or cutting to length, as appropriate
5 Fit glass
  • 5.1 Glass is fixed to the frame using the selected method and in accordance with recognised industry procedures and Australian Standards
  • 5.2 Solvents and sealants are used in accordance with manufacturer recommendations and Australian Standards
  • 5.3 Excess sealing material is removed and glass and frame cleaned after fixing
6 Inspect final product and clean up work area
  • 6.1 Completed installation is checked to ensure compliance with customer requirements, specifications and Australian Standards
  • 6.2 Work area is cleaned and left in a safe condition and rubbish removed from work area and disposed of in accordance with relevant statutory requirements and enterprise requirements
  • 6.3 Tools, equipment and materials are cleaned and stored following workplace procedures
  • 6.4 Waste and scrap material are removed for disposal or recycling, as required
  • 6.5 Workplace documentation is completed in accordance with workplace requirements, including calculating the cost of glass, fittings, materials and labour
No information
No information
Replaces
State Code National Code Title Type
S7835 LMFGG3019C Conduct commercial and structural re-glazing Unit of competency
Replaced By
State Code National Code Title Type
OAJ05 MSFGG3038 Conduct commercial and structural reglazing Unit of competency
State Code National Code Title Type
J732 MSF30413 Certificate III in Glass and Glazing Qualification