Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Plan and monitor works projects in catchments and waterways
Plan and monitor works projects in catchments and waterways
Unit of competency
National Code
AHCNRM506A
AHCNRM506A
State Code
D7076
D7076
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
08/03/2012
Field of Education
080315 - Project Management
Original Release Date
08/03/2012
Nominal Hours
150
Description
This unit of competency covers the process of planning, implementing and reviewing works projects in catchments and waterways. It requires the ability to assist in the planning of works projects, monitor and support the works project and report on the works project. Planning and monitoring work projects in catchments and waterways requires knowledge of catchment health, wetland and floodplain processes and function, heritage and cultural values of waterways and monitoring and evaluation tools for works projects. No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Inspect and assess catchment and waterways sites for inclusion in a works program
- 1.1. The environmental outcomes and priorities of the works program are established.
- 1.2. Site assessments are undertaken to confirm the physical characteristics and health of catchment and waterways.
- 1.3. The range of likely operating conditions, hazards and sensitive environments are assessed for impact on any proposed works project/s.
- 1.4. The heritage and cultural values of sites are assessed.
- 1.5. Potential project partners and investors are consulted on the scope and purpose of the works program.
2. Plan works projects
- 2.1. Project priorities are determined in consultation with stakeholders based on catchment plans, project impact and availability of funding.
- 2.2. The requirements for permits, licenses and other authorisations are met.
- 2.3. Equipment and materials required for project/s are determined and sourced using enterprise guidelines.
- 2.4. Terms and conditions of project work are confirmed with project partners and investors.
- 2.5. Plans and specifications for works project/s are prepared according to enterprise guidelines.
- 2.6. Project documentation is completed and details are finalised and communicated, as required.
3. Monitor works project/s
- 3.1. Monitoring program is established using data collection guidelines, data collection parameters and timelines.
- 3.2. Data benchmarks for evaluating the outcomes of project/s are established.
- 3.3. Occupational health and safety (OHS) arrangements are monitored against legislative requirements and other relevant policies.
- 3.4. The ongoing requirements of contractors and project workers are met.
- 3.5. Appropriate and timely support that meets the requirements of the project is provided.
- 3.6. The condition of the project site is monitored to ensure it is left in an agreed condition.
4. Review works program
- 4.1. Individual projects are evaluated to ensure compliance with agreed outcomes.
- 4.2. Sites are assessed to determine whether projects are meeting the environmental outcomes.
- 4.3. Changes to the works program are recommended to better achieve catchment and waterways priorities.
- 4.4. A relational data management system is used for recording monitoring data and reporting to stakeholders.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Environmental outcomes may include:
reductions in salinity
increase in vegetation cover
improvements in water quality parameters
reducing or stabilising erosion
nutrient losses from land to water
protection of heritage or cultural values.
Site assessment may include:
an environmental assessment
establishing conditions before works
identifying cultural significance
assessing access issues for equipment and machinery
assessing access issues for workers
establishing seasonal issues i.e. site saturation or dryness for works.
Works project details may include:
landholder contact details
description of project works
partner details
funding amounts
permits and approvals
contractor requirements
resources.
Monitoring programs may include:
monitoring programs that contribute data to assess indicators of catchment health such as:
Waterwatch
Saltwatch
index of stream condition
macro invertebrate monitoring sites
SEPP water quality monitoring
stream flow management plans
EVC mapping
Australian Bureau of Statistics data.
Data benchmarks may include:
quantitative data for site or catchment
social indicators such as Landcare membership
qualitative history of management and attitudes to sustainable catchment management.
Contractor and project workers requirements may include:
management of materials and equipment resources and invoicing
resource procurement
timesheets
OHS.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Environmental outcomes may include:
reductions in salinity
increase in vegetation cover
improvements in water quality parameters
reducing or stabilising erosion
nutrient losses from land to water
protection of heritage or cultural values.
Site assessment may include:
an environmental assessment
establishing conditions before works
identifying cultural significance
assessing access issues for equipment and machinery
assessing access issues for workers
establishing seasonal issues i.e. site saturation or dryness for works.
Works project details may include:
landholder contact details
description of project works
partner details
funding amounts
permits and approvals
contractor requirements
resources.
Monitoring programs may include:
monitoring programs that contribute data to assess indicators of catchment health such as:
Waterwatch
Saltwatch
index of stream condition
macro invertebrate monitoring sites
SEPP water quality monitoring
stream flow management plans
EVC mapping
Australian Bureau of Statistics data.
Data benchmarks may include:
quantitative data for site or catchment
social indicators such as Landcare membership
qualitative history of management and attitudes to sustainable catchment management.
Contractor and project workers requirements may include:
management of materials and equipment resources and invoicing
resource procurement
timesheets
OHS.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate must be able to research and determine the environmental conditions of project worksites in relation to the wider catchment and be able to determine the physical and human resources necessary for project success. The candidate must be able to determine suitable monitoring procedures and evaluate the environmental benefits of the works program utilising existing techniques and reporting guidelines.
Context of and specific resources for assessment
Specific resources required for assessment of this unit include access to monitoring equipment used in the collection of catchment health data such as Waterwatch kits, pH meters and EC meters.
Assessment of this unit could take place in conjunction with VBP584 Provide technical advice on sustainable catchment management.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate must be able to research and determine the environmental conditions of project worksites in relation to the wider catchment and be able to determine the physical and human resources necessary for project success. The candidate must be able to determine suitable monitoring procedures and evaluate the environmental benefits of the works program utilising existing techniques and reporting guidelines.
Context of and specific resources for assessment
Specific resources required for assessment of this unit include access to monitoring equipment used in the collection of catchment health data such as Waterwatch kits, pH meters and EC meters.
Assessment of this unit could take place in conjunction with VBP584 Provide technical advice on sustainable catchment management.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAO60 | AHCNRM506 | Plan and monitor works projects in catchments and waterways | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D523 | AHC51110 | Diploma of Conservation and Land Management | Qualification |