Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Schedule resources

Schedule resources

Unit of competency
National Code
ICTWOR3041A
State Code
D3524
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
15/06/2010
State Implementation and Classification
Approved Date
15/04/2014
Field of Education
080301 - Business Management
Original Release Date
15/04/2014
Nominal Hours
40
Description
This unit describes the performance outcomes, skills and knowledge required to undertake scheduling of resources for a new installation or upgrade of an existing system, for all telecommunications applications including telephony, data, video and multimedia. It involves assessing human resources, plant, equipment and material needs and negotiating with external suppliers.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of endorsement but users should confirm requirements with the relevant federal, state or territory authority.
Notes
Elements and Performance Criteria
1. Scope project resources
  • 1.1. Collate and analyse design and estimation documents from appropriate personnel for resource needs, deadlines and comply with relevant legislation, codes, regulations and standards
  • 1.2. Consult interested parties for input to schedule
2. Schedule resources for a project
  • 2.1. Coordinate resource requirements for project to match available labour to quantity and type of work required
  • 2.2. Schedule availability of resources to suit relevant interested parties and according to works schedules including start and finish dates
  • 2.3. Document and clearly communicate resources schedule to appropriate personnel for approval
3. Monitor and coordinate resources schedule according to project progress
  • 3.1. Monitor and coordinate quantity, quality and timing of supply of each input and service according to the progress of projects being undertaken
  • 3.2. Reschedule resources based on priorities and report to the appropriate person according to enterprise guidelines
  • 3.3. Complete administrative tasks
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Design and estimation documents may include:
budget estimates
design plans
estimators list
material list
preferred supplier list
project plans
tender document
works schedule.
Appropriate personnel may include:
estimator
project administrator
project manager.
Relevant legislation, codes, regulations and standards may include:
AS Communications Cabling Manual (CCM) Volume 1
Australian Communications Industry Forum (ACIF) standards and codes
ACMA technical standards
Australian building codes and regulations
Australian standards
enterprise standards
environmental protection
fire regulations
heritage legislation
industrial relations agreements including awards and enterprise
local government
manufacturer's enterprise operating policy and procedures
national code
OHS Act
power company requirements
Privacy Act
services and utilities codes of practice and standards:
electricity
gas
water
spectrum management regulations
statutory requirements
Trade Practices Act
traditional land owners.
Interested parties may include:
local
managers
property owners
stakeholders
state and federal agencies
tenants
utilities.
Resource requirements may include:
equipment:
installation
monitoring
test
labour
material
plant:
barriers
diggers
excavators
work platforms
safety equipment:
for hazardous chemicals
gas monitors
personal protective equipment
radiation detectors.
Works schedules may include:
labour requirements and availability
plant, equipment and materials availability
variations in work environment likely to affect the planned completion of the project.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
identify resource requirements from plans, equipment and system manuals, specifications and relevant enterprise policy
plan and provision to meet key dates and milestones for:
appropriately skilled labour
volume and type of material
monitor work progress, coordinate and adjust resource requirements to meet both customer's needs and cost parameters.
Context of and specific resources for assessment
Assessment must ensure:
telecommunications operations site suitable for scheduling projects
equipment currently used in industry
relevant enterprise and site related documentation
relevant regulatory, supplier and equipment documentation that impact on scheduling activities.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
review of activities involving the scheduling of resources for a telecommunications project completed by the candidate
review of an oral and written report with completed documentation
direct observation of the candidate scheduling resources for a telecommunications project
oral or written questioning to assess required knowledge.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:
ICTWOR3028A Organise resources
ICTWOR3035A Organise material supply
ICTWOR3093A Manage spare parts
ICTWOR3127A Supervise worksite activities.

Aboriginal people and other people from a non-English speaking background may have second language issues.

Access must be provided to appropriate learning and assessment support when required.

Assessment processes and techniques must be culturally appropriate, and appropriate to the oral communication skill level, and language and literacy capacity of the candidate and the work being performed.

In all cases where practical assessment is used it will be combined with targeted questioning to assess required knowledge. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency.

Where applicable, physical resources should include equipment modified for people with special needs.
Replaces
State Code National Code Title Type
D2094 ICTTC041D Schedule resources Unit of competency
Replaced By
State Code National Code Title Type
AWC76 ICTWOR303 Schedule resources Unit of competency