Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Design grid-connected photovoltaic power supply systems
Design grid-connected photovoltaic power supply systems
Unit of competency
National Code
UEERE0011
UEERE0011
State Code
OCA34
OCA34
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Original Release Date
12/07/2021
Nominal Hours
54
Description
This unit involves the skills and knowledge required to design grid-connected photovoltaic (PV) power supply systems.It includes preparing to design, and developing and obtaining approval for grid connected power supply systems. It also includes designing grid-connected PV power supply system installation, following design briefs, incorporating schemes for protection of persons and property from dangers of system malfunctions, ensuring safety and performance standards and functional requirements are meet, and documenting design calculations and criteria.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to design a grid-connected PV power supply system
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures are identified and applied
- 1.2 Grid system is determined from design brief
- 1.3 Industry regulations and job requirements are identified and applied to work in accordance with workplace procedures
- 1.4 Design development work is planned to meet scheduled timelines in consultation with relevant person/s
2 Develop a grid-connected PV power supply system design
- 2.1 Grid-connected power supply systems, performance standards and compliance methods are applied to the design
- 2.2 Alternative arrangements for hybrid power systems design is considered based on the requirements outlined in the design brief
- 2.3 Safety, functional and budgetary considerations are incorporated in design
- 2.4 Grid-connected power supply system design draft is checked for compliance with the design brief, industry regulations, job requirements and workplace procedures
- 2.5 Grid-connected power supply system design is documented and submitted to relevant person/s for authorisation
- 2.6 Unplanned situations are responded to in accordance with workplace procedures
3 Obtain approval for grid-connected PV power supply system design
- 3.1 Grid-connected power supply system design is presented and explained to client and/or relevant person/s
- 3.2 Requests for alterations to design are negotiated with relevant person/s in accordance with workplace procedures
- 3.3 Final design is documented and authorisation obtained from relevant person/s
- 3.4 Quality of work is monitored against workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC705 | UEENEEK135A | Design grid connected photovoltaic power supply systems | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OEW95 | UEERE0061 | Design grid-connected photovoltaic power supply systems | Unit of competency |