Unit of competency Outline
Date retreived
23/07/2026 12:24 AM AWST
23/07/2026 12:24 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Prepare for and apply shotcrete for installation
Prepare for and apply shotcrete for installation
Unit of competency
National Code
MSMPMC328
MSMPMC328
State Code
OAF80
OAF80
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
21/05/2019
Field of Education
040399 - Building, N.e.c.
Original Release Date
21/05/2019
Nominal Hours
40
Description
This unit describes the skills and knowledge required to prepare for and apply shotcrete refractory installation. Shotcrete is the generic term used to describe the placement of cementitious products, including concrete or refractory monolithics, by high volume and high velocity air. It is also known as guniting.This unit applies to installation with shotcrete alone and with shotcrete that needs to join to brick, block, moulded or cast refractory. The refractory may be applied by wet or dry processes.This unit applies to operators who are required to take responsibility for own outputs and follow established procedures to prepare for and apply shotcreting to procedures and specifications; mix the shotcrete and correct any deficiencies in the quality of work. Operators are also required to work autonomously and apply their own judgement to interpret information; monitor processes; identify and address routine and non-routine problems and hazards. This unit applies to an individual working alone or as part of a team or group and in liaison with other shift team members, team leader and supervisor. No licensing or certification requirements exist at the time of publication. Relevant legislation, industry standards and codes of practice within Australia must be applied.
Notes
Elements and Performance Criteria
1. Establish the suitability of resources
- 1.1 Check all information conforms with resources
- 1.2 Record discrepancies in information
- 1.3 Report any inaccuracies in information to the person in charge
- 1.4 Identify and select materials, components, tools and equipment
2. Apply shortcode to prepared surface
- 2.1 Prepare backgrounds, cutting out, demolition and keying
- 2.2 Mix shotcrete
- 2.3 Assemble and operate shotcreting equipment
- 2.4 Apply shotcrete
- 2.5 Remove and reinstate damaged shotcrete material
- 2.6 Maintain tools and equipment
3. Respond to problems
- 3.1 Identify problems in equipment or process
- 3.2 Rectify problem using appropriate solution
- 3.3 Report problems outside area of responsibility to designated person
4.Contribute to controlling hazards in work area
- 4.1 Identify shotcreting hazards
- 4.2 Assess risks arising from those hazards
- 4.3 Implement measures to control those risks
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAH29 | PMC552094 | Prepare for and apply shotcrete for installation | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEA6 | MSM30318 | Certificate III in Manufactured Mineral Products | Qualification |