Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install de-watering conduit and gas drainage equipment
Install de-watering conduit and gas drainage equipment
Unit of competency
National Code
RIINHB319D
RIINHB319D
State Code
WH487
WH487
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
29/05/2014
Field of Education
040327 - Plumbing
Original Release Date
29/05/2014
Nominal Hours
40
Description
This unit describes a participant’s skills and knowledge required to install de-watering conduit and gas drainage equipment in Coal mining and Drilling. This unit is appropriate for those working in driller roles.No licensing, legislative or certification requirements apply to this unit at the time of publication
Notes
Elements and Performance Criteria
1. Plan and prepare for installation of de-watering conduit and gas drainage equipment
- 1.1 Access, interpret and apply de-watering conduit and gas drainage equipment documentation and the work activity is compliant
- 1.2 Obtain, read, interpret, clarify and confirm work requirements
- 1.3 Identify and address potential risks, hazards and environmental issues and implement control measures
- 1.4 Select and wear personal protective equipment appropriate for work activities
- 1.5 Communicate and coordinate activities with others throughout the work activity
- 1.6 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
- 1.7 Prepare the de-watering conduit installation plan in consultation with the site gas drainage official and in accordance with appropriate site management plans
2. Install de-watering conduit and monitor water drainage
- 2.1 Carry out any pre-start and start up procedures
- 2.2 Identify, select and apply rig operational controls
- 2.3 Insert hollow rods into the hole
- 2.4 Attach non-return valve and anchor onto the de-watering conduit
- 2.5 Perforate the conduit at the appropriate locations to allow ingress of water
- 2.6 Install the de-watering conduit into hollow rod to the required distance
- 2.7 Identify and remedy operational problems
- 2.8 Remove hollow rods leaving conduit in place
- 2.9 Connect conduit to de-watering system and commence removing water via the water trap
- 2.10 Empty water trap
- 2.11 Disconnect de-watering equipment from the de-watering conduit when all water has been removed
- 2.12 Monitor, record and interpret all pressure and flow readings
- 2.13 Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment
3. Connect gas drainage equipment and monitor gas drainage
- 3.1 Select and install appropriate gas drainage equipment
- 3.2 Select and use appropriate measuring equipment to monitor gas drainage
- 3.3 Correctly identify and tag gas drainage and monitoring units identifying the number, length and diameter of the hole
4. Complete equipment maintenance and housekeeping
- 4.1 Carry out any shutdown and securing of equipment
- 4.2 Ensure that the drill rods are inspected for wear and damage, threads dressed and greased, and rods are replace as required
- 4.3 Monitor all drill equipment and hoses and ancillary equipment and carryout remedial action
- 4.4 Ensure all drilling equipment is cleaned and maintained
- 4.5 Ensure housekeeping activities are completed
- 4.6 Process records
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WB682 | RIINHB319A | Install de-watering conduit and gas drainage equipment | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFI5 | RII31820 | Certificate III in Drilling Operations | Qualification |
| J633 | RII31813 | Certificate III in Drilling Operations | Qualification |
| AZB1 | RII31815 | Certificate III in Drilling Operations | Qualification |