Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Select and fit insulation and sheathing
Select and fit insulation and sheathing
Unit of competency
National Code
CPCPMS3012A
CPCPMS3012A
State Code
D7470
D7470
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
27/09/2011
Field of Education
040327 - Plumbing
Original Release Date
27/09/2011
Nominal Hours
8
Description
This unit of competency specifies the outcomes required to install insulating sheathing on hot and cold piping, fittings and vessels. It includes the selection of insulation materials.
Notes
Elements and Performance Criteria
1. Prepare for work.
- 1.1. Plans and specifications are obtained.
- 1.2. Safety (OHS) requirements associated with selecting and installing insulating sheathing, and workplace environmental requirements, are adhered to throughout the work.
- 1.3. Quality assurance requirements are identified and adhered to in accordance with workplace requirements.
- 1.4. Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements.
- 1.5. Tools and equipment, including personal protective equipment, are selected and checked for serviceability.
- 1.6. Work area is prepared to support efficient selection and installation of insulating sheathing.
2. Identify insulation requirements.
- 2.1. Insulation materials are selected that comply with plans, specifications and relevant information.
- 2.2. Quantity and type of materials required are calculated from plans and specifications.
- 2.3. Allowances for fabrication and assembly are determined.
- 2.4. Materials are identified, ordered and collected in accordance with workplace procedures.
- 2.5. Materials are checked for compliance with docket and order form and for acceptable condition, and faults are reported.
3. Install insulation.
- 3.1. Surfaces to be insulated are cleaned of dirt, rust, scale and grease.
- 3.2. Insulating materials, including metal sheathing, are installed in accordance with plans and specifications.
- 3.3. Vapour barriers are applied to suit job requirements.
4. Clean up.
- 4.1. Work area is cleared and materials disposed of or recycled in accordance with state and territory legislation and workplace procedures.
- 4.2. Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures.
- 4.3. Documentation is completed in accordance with workplace requirements.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Safety (OHS) is to be in accordance with commonwealth, state and territory legislation and regulations and may include:
handling of materials
hazard control
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
hazardous materials and substances
service lines
surrounding structures and facilities
trip hazards
use of tools and equipment
work site visitors and the public
working at heights
working in proximity to others
use of firefighting equipment
use of first aid equipment
workplace environment and safety.
Environmental requirements are to cover:
clean-up protection
ozone protection
waste management.
Quality assurance requirements may include:
Environment Protection Authority (EPA)
internal company quality assurance policy and risk management strategy
International Standards Organisation
site safety plan
workplace operations and procedures.
Statutory and regulatory authorities include:
state or territory statutory authority
statutory plumbing authority.
Tools and equipment may include:
dust masks and respirators
fall protection equipment
hand and power tools
ladders
lifting and load shifting equipment, including:
chain blocks
elevated work platforms
forklifts
hand trolleys
hoists and jacks
restricted height scaffolds
rollers
measuring equipment
swaging machines.
Insulation materials may be:
chemically blown PVC nitrile rubber sponge in tubular or sheet form
closed cell
flexible
hydrous calcium silicate with fibrous reinforcement in preformed sections
metal
polyisocyanurate (PIR) foam in preformed sections
powder form and jute fibre in strip form
resin-bonded glass fibre in flexible blanket or preformed sections
resin-bonded mineral wool in flexible blanket form
rigid polyurethane foam in preformed sections.
Information may include:
charts and hand drawings
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
regulatory and legislative requirements, particularly those pertaining to:
building codes
OHS and environmental requirements
plumbing regulations
relevant Australian standards
safe work procedures relating to selecting and installing insulating sheathing to hot and cold piping, fittings and vessels
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Materials may include:
foam
hydrous calcium silicate
jute fibre
metal
PVC nitrile rubber sponge
resin-bonded glass fibre
resin-bonded mineral wool
other approved materials.
Fault reporting:
may be written or verbal
is to be in accordance with company's workplace procedures.
Metal sheathing may include:
aluminium
aluminium and zinc coated steel
stainless steel
zinc coated steel
other approved materials.
Vapour barriers may include:
mastic or plastic type filling compounds and adhesives
reinforced aluminium foil and polyethylene tubular jacket.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Safety (OHS) is to be in accordance with commonwealth, state and territory legislation and regulations and may include:
handling of materials
hazard control
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
hazardous materials and substances
service lines
surrounding structures and facilities
trip hazards
use of tools and equipment
work site visitors and the public
working at heights
working in proximity to others
use of firefighting equipment
use of first aid equipment
workplace environment and safety.
Environmental requirements are to cover:
clean-up protection
ozone protection
waste management.
Quality assurance requirements may include:
Environment Protection Authority (EPA)
internal company quality assurance policy and risk management strategy
International Standards Organisation
site safety plan
workplace operations and procedures.
Statutory and regulatory authorities include:
state or territory statutory authority
statutory plumbing authority.
Tools and equipment may include:
dust masks and respirators
fall protection equipment
hand and power tools
ladders
lifting and load shifting equipment, including:
chain blocks
elevated work platforms
forklifts
hand trolleys
hoists and jacks
restricted height scaffolds
rollers
measuring equipment
swaging machines.
Insulation materials may be:
chemically blown PVC nitrile rubber sponge in tubular or sheet form
closed cell
flexible
hydrous calcium silicate with fibrous reinforcement in preformed sections
metal
polyisocyanurate (PIR) foam in preformed sections
powder form and jute fibre in strip form
resin-bonded glass fibre in flexible blanket or preformed sections
resin-bonded mineral wool in flexible blanket form
rigid polyurethane foam in preformed sections.
Information may include:
charts and hand drawings
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
regulatory and legislative requirements, particularly those pertaining to:
building codes
OHS and environmental requirements
plumbing regulations
relevant Australian standards
safe work procedures relating to selecting and installing insulating sheathing to hot and cold piping, fittings and vessels
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Materials may include:
foam
hydrous calcium silicate
jute fibre
metal
PVC nitrile rubber sponge
resin-bonded glass fibre
resin-bonded mineral wool
other approved materials.
Fault reporting:
may be written or verbal
is to be in accordance with company's workplace procedures.
Metal sheathing may include:
aluminium
aluminium and zinc coated steel
stainless steel
zinc coated steel
other approved materials.
Vapour barriers may include:
mastic or plastic type filling compounds and adhesives
reinforced aluminium foil and polyethylene tubular jacket.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
locating, interpreting and applying relevant information, standards and specifications to select and install insulating sheathing to piping, fittings and vessels
applying safety requirements throughout the work sequence, including the use of personal protective clothing and equipment
as a minimum the ability to, given the plans and specifications, insulate 2 metres of small bore heating line with at least one change in direction; 2 metres of refrigeration line with at least one change in direction, and metal sheath at least 2 metres of pipework with at least one change in direction, ensuring:
correct identification of requirements and details of proposed installations
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, standards and organisational quality procedures and processes
communicating and working effectively and safely with others.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe working practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
locating, interpreting and applying relevant information, standards and specifications to select and install insulating sheathing to piping, fittings and vessels
applying safety requirements throughout the work sequence, including the use of personal protective clothing and equipment
as a minimum the ability to, given the plans and specifications, insulate 2 metres of small bore heating line with at least one change in direction; 2 metres of refrigeration line with at least one change in direction, and metal sheath at least 2 metres of pipework with at least one change in direction, ensuring:
correct identification of requirements and details of proposed installations
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, standards and organisational quality procedures and processes
communicating and working effectively and safely with others.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe working practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W9709 | CPCPMS3002A | Select and fit insulation and sheathing | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WF915 | CPCPMS3032A | Select and fit insulation and sheathing | Unit of competency |