Unit of competency Outline

Date retreived
23/07/2026 4:45 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install prefabricated fibreglass swimming pools

Install prefabricated fibreglass swimming pools

Unit of competency
National Code
CPCSPS4005
State Code
OCM16
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
15/09/2022
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040399 - Building, N.e.c.
Original Release Date
01/06/2021
Nominal Hours
40
Description
This unit specifies the skills and knowledge required to install variously shaped in-ground prefabricated fibreglass swimming pools. It includes preparing for filtration and circulation systems and luminary bonding for equipment and lighting.This unit applies to a range of contexts and reflects the role of those who are responsible for the installation process and the management of excavation and heavy lifting equipment to complete the installation of prefabricated fibreglass:private swimming poolspublic swimming pools, including:hydrotherapy and therapeutic exercise poolswading and receiving pools associated with water slideswave pools.This unit is suitable for those using specialised knowledge to complete routine and non-routine tasks, and their own judgement to deal with predictable and sometimes unpredictable problems.No licensing or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan installation of prefabricated fibreglass swimming pool.
  • 1.1 Access, read and interpret relevant information from plans, specifications, codes and standards.
  • 1.2 Interpret and apply work health and safety and environmental requirements.
  • 1.3 Identify and confirm with client type and location of filtration and circulation system and lighting requirements.
  • 1.4 Calculate and order materials and components.
  • 1.5 Determine commencement date and schedule delivery of material and components and required plant and equipment.
  • 1.6 Apply relevant WHS regulations and codes when locating and preparing for work near existing underground and overhead services.
  • 1.7 Determine job priorities and sequence job tasks in consultation with others on site.
  • 1.8 Select, fit and use personal protective equipment appropriate to activity.
2 Install prefabricated fibreglass swimming pool.
  • 2.1 Set out and mark pool position, finish height and excavation depth.
  • 2.2 Excavate to set out depth and side clearance, allowing for backfill.
  • 2.3 Select and prepare base in accordance with soil classifications of site.
  • 2.4 Confirm installation of circulation pipework to shell of swimming.
  • 2.5 Confirm and implement requirements for managing traffic during pool installation.
  • 2.6 Communicate with crane service provider to lift, position and set shell to the specified level.
3 Clean up site.
  • 3.1 Clear the work area and reuse, recycle or dispose of materials in accordance with workplace and environmental requirements.
  • 3.2 Clean tools and equipment, check for serviceability, report any damage or faults and store and secure.