Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Set up and prepare for open-cut drilling operations
Set up and prepare for open-cut drilling operations
Unit of competency
National Code
RIIBHD304D
RIIBHD304D
State Code
WH015
WH015
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
28/05/2014
Field of Education
030303 - Mining Engineering
Original Release Date
28/05/2014
Nominal Hours
40
Description
This unit describes a participant’s skills and knowledge required to set up and prepare for open-cut drilling operations in the Coal and Metalliferous mining and Extractive.This unit is appropriate for those working in operational roles of open-cut drilling. No licensing or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare drilling site
- 1.1 Access, interpret and apply open cut drilling documentation and ensure the work activity is compliant
- 1.2 Receive, interpret and clarify shift changeover details
- 1.3 Identify, manage and report potential hazards and risks according to work plan
- 1.4 Select and wears personal protective equipment
- 1.5 Conduct equipment pre-start checks to ensure equipment is ready for operation
- 1.6 Assess site conditions and historical information of past performance to determine and clarify drilling requirements
- 1.7 Locate and connect ancillary services
- 1.8 Stabilise drill to minimise delays and breakdowns and ensure safety of operating personnel and continuous drilling
- 1.9 Communicate with other personnel using approved communication methods
- 1.10 Adhere to emergency procedures to ensure safety of personnel, plant and equipment
2 Mark out drill pattern
- 2.1 Erect physical barricades and signage to protect pattern from unauthorised personnel and equipment
- 2.2 Adjust drill pattern within authorised tolerances and drill pattern
- 2.3 Obtain authorisation for changes to drill pattern plan from relevant authority
- 2.4 Place indicators on drill pattern in preparation for hole drilling
- 2.5 Mark out drill pattern ensuring it is visible and aids the drilling process
- 2.6 Protect pre-existing drill holes according to characteristics of hole
- 2.7 Complete all written documentation clearly, concisely and on time
3 Move equipment and materials to pattern
- 3.1 Prepare rig for moving
- 3.2 Determine route and destination prior to movement of equipment and materials
- 3.3 Identify and manage potential hazards to ensure safe transportation to drill site
- 3.4 Move equipment and attachments safely and avoid damage to equipment and site or injury to personnel
- 3.5 Align drill rig in appropriate position to access drill pattern efficiently
- 3.6 Connect ancillary services
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC323 | RIIBHD304B | Set-up and prepare for open cut drilling operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AZB1 | RII31815 | Certificate III in Drilling Operations | Qualification |
| J656 | RII30113 | Certificate III in Surface Extraction Operations | Qualification |
| AZE5 | RII30115 | Certificate III in Surface Extraction Operations | Qualification |