Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Assess construction faults in buildings up to three storeys

Assess construction faults in buildings up to three storeys

Unit of competency
National Code
CPCCSV6003A
State Code
W9587
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
20/10/2009
Field of Education
030903 - Structural Engineering
Original Release Date
20/10/2009
Nominal Hours
20
Description
This unit of competency specifies the outcomes required to identify construction faults in buildings up to three storeys and not exceeding a maximum floor area of 2000 square metres.It includes the identification and evaluation of construction problems and determination of alternative methods in accordance with legislative requirements.
Notes
Elements and Performance Criteria
1. Identify and analyse construction faults on building sites up to three storeys.
  • 1.1. Information is collected relating to the specific building construction problem.
  • 1.2. Construction problem for the type of construction is identified relative to original specifications and building material.
  • 1.3. Construction faults are communicated to appropriate personnel and documented in accordance with standard work practices.
  • 1.4. Problem solving techniques are used, typical faults and problems are identified and action to rectify is deemed to be in accordance with the BCA.
2. Identify construction techniques, methods and materials nominated in relevant legislation in the BCA and Australian standard.
  • 2.1. Building terminology is used accurately in the communication of issues.
  • 2.2. Working drawings and specifications are examined and existing or designed construction problems are identified and evaluated.
  • 2.3. Alternative methods and materials to meet construction aims and objectives are prepared to the specification nominated in relevant legislation in the BCA and Australian standards.
  • 2.4. Detailed sketches of available alternative methods and materials available to meet the construction aims and objectives are prepared to specification.
3. Resolve construction faults in construction techniques and methods.
  • 3.1. Project working drawings and specifications identifying existing or designed construction problems are evaluated.
  • 3.2. Report identifying available alternative methods and materials to meet the construction aims and objectives is prepared to specification.
  • 3.3. Detailed sketches of available alternative methods and materials available to meet the construction aims and objectives are prepared to specification.
4. Resolve construction faults using alternative construction methods.
  • 4.1. Suitable methods from available alternative solutions are evaluated and recommended to resolve the problem in accordance with project aims and objectives.
  • 4.2. Selected methods are integrated into the project in order to resolve the construction problems in accordance with project aims.
  • 4.3. Evaluation of available alternative forms of construction is carried out in accordance with project aims.
5. Resolve common on-site faults with building materials.
  • 5.1. Commonly occurring on-site problems with building materials and their causes are evaluated.
  • 5.2. Corrective and preventative measures are identified and implemented.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Building construction includes:
design specifications
evaluation and identification of construction faults and the determination of alternative methods
maintenance specifications and adherence to legislative requirements for BCA Class 2 to 9 buildings
standards and services in compliance with relevant legislation.
Type of construction includes:
residential, industrial and commercial medium rise buildings
wide span buildings, limited to three storeys and a maximum floor area not exceeding 2000 square metres.
Building material includes:
concrete
masonry and autoclaved aerated concrete (AAC)
steel-framed
timber-framed.
Construction faults include:
installation
refurbishing
renovation
restoration.
Australian standards include:
AS1288 Installation of glass in buildings
AS1684 Residential timber framed construction
AS2050 Fixing of roof tiles
AS2180 Metal rainwater goods, selection and installation
AS2208 Safety glazing materials for use in buildings
AS3500 National plumbing
AS3600 Concrete structures
AS3660 Protection of buildings from subterranean termites
AS3700 Masonry
AS3740: 2004 Waterproofing of wet areas in residential buildings
AS4349 Inspection of buildings.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
comply with OHS regulations applicable to workplace operations
apply organisational management policies and procedures, including quality assurance requirements where appropriate
assess construction faults in buildings, determine a rectification strategy and consider alternative construction methods; and the associated reporting of data, findings, recommendations and strategies for at least one residential building project and one commercial building project or equivalent in compliance with relevant legislation
provide reports to appropriate body/individual as determined by the project brief.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W1474 BCGSV6003A Assess construction faults in buildings up to 3 storeys Unit of competency
Replaced By
State Code National Code Title Type
AUX78 CPCCBS6010 Conduct and report on building surveying audits of residential buildings up to three storeys Unit of competency
State Code National Code Title Type
W618 CPC60108 Advanced Diploma of Building Surveying Qualification