Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Supervise cabling project

Supervise cabling project

Unit of competency
National Code
ICTCBL4023A
State Code
D3335
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
15/06/2010
State Implementation and Classification
Approved Date
18/01/2011
Field of Education
031309 - Communications Equipment Installation And Maintenance
Original Release Date
18/01/2011
Nominal Hours
100
Description
This unit describes the performance outcomes, skills and knowledge required to supervise a cabling project. It requires planning, preparing financial budgets and monitoring of cabling work. Cable used must be compliant with appropriate Australian Communications and Media Authority (ACMA) technical standard requirements for underground, aerial, Category 5, 6, 6A, 7 or 7A, or unshielded twisted pairs (UTP). Cabling products must be ACMA-approved.All customer cabling work in the telecommunications, fire, security and data industries must be performed by a registered cabler. All cablers are required to register with an ACMA-accredited registrar.
Notes
Elements and Performance Criteria
1. Plan and organise cabling activities
  • 1.1. Obtain cabling installation specifications and project specifications from the customer
  • 1.2. Prepare work schedules and installation plans identifying key dates and milestones
  • 1.3. Organise resource requirements
  • 1.4. Verify location of proposed installation according to the plans obtained from authorised personnel
  • 1.5. Obtain information on location of other services from relevant authorities
  • 1.6. Document plans for cabling project and advise relevant parties
2. Prepare financial budgets
  • 2.1. Prepare budget identifying cost and expenditure items from scheduling and planning documentation
  • 2.2. Advise relevant personnel of purchasing and other delegations within budget allocations
  • 2.3. Prepare budget projections within estimated and approved contract pricing
3. Source human resource requirements for cabling
  • 3.1. Estimate number and determine availability of suitable human resources according to contract requirements and relevant industrial and enterprise policy
  • 3.2. Establish necessary competency and licence requirements of project personnel prior to recruitment
  • 3.3. Schedule personnel workloads and allocate within industrial and enterprise requirements
4. Monitor cabling works
  • 4.1. Follow occupational health and safety (OHS) processes and site-specific safety requirements according to plan
  • 4.2. Monitor compliance regularly with customer specification, relevant legislation, codes, regulations and standards
  • 4.3. Notify customer promptly on difficult or known problem areas
  • 4.4. Reallocate work as required to meet client and company requirements
  • 4.5. Monitor costs and time schedules to identify and resolve any potential problem
  • 4.6. Provide a report on work progress activity and schedule
5. Evaluate outcomes of cabling projects
  • 5.1. Review cabling projects to identify areas where performance has been below client and enterprise expectations
  • 5.2. Implement recommendations to ensure effective improvements
6. Complete administrative tasks
  • 6.1. Complete documentation
  • 6.2. Notify customer and obtain sign off
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Key dates and milestones may include:
installation of other services
materials delivery
start and finish date or time.
Resource requirements may include:
cable must be:
compliant with appropriate ACMA technical standard requirements for:
underground
aerial
Category 5, 6, 6A, 7 or 7A
UTP
cabling hardware requirements
cabling products must be ACMA-approved
competent staff
consumables
facilities and equipment
finances
time availability.
Plans may include:
building
constructions
design
site layout drawings
street.
Authorised personnel may include:
construction manager
project manager
site manager
site supervisor.
Relevant authorities may include:
cable location services (Dial before you dig)
environment protection
local government
private owners
utility providers such as:
electricity
fire services
gas
other telecommunications providers
water.
Documentation may include:
ACMA requirements
contract documentation
enterprise and client policy and procedures
estimations and quotations
work contracts
work plans and schedules.
Relevant legislation, codes, regulations and standards include:
Australian Communications Industry Forum (ACIF) standards and codes
AS Communications Cabling Manual (CCM) Volume 1
AS/NZS 3000:2007
AS/NZS 3080:2003
AS/NZS 3084:2003
AS/NZS 3085.1:2004
AS/NZS IEC 61935.1:2006
AS/NZS IEC 61935.2:2006
AS/NZS ISO/IEC 14763.3:2007
AS/NZS ISO/IEC 15018:2005
AS/NZS ISO/IEC 24702:2007
cabling security codes and regulations
industrial awards and conditions
industry standards include:
regulated or industry codes of practice
appropriate ACMA technical standards
OHS
technical standards AS/ACIF S008:2006 and AS/ACIF S009:2006
Trade Practices Act.















EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
complete all appropriate plans and financial budgets for cabling activities
supervise cabling project applying human resource policies including awards and conditions and all related OHS and work practices
monitor and implement alternate plans where necessary to meet work schedules and customer requirements
complete a project report on a cabling projects detailing recommendations for improvement.
Context of, and specific resources for assessment
Assessment must ensure:
site with cabling project
access to human resource policies, including awards and conditions and all related OHS and work practices
relevant regulatory and equipment documentation that impact on monitoring activities.
Methods of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
review of a hands-on project completed by the candidate
review of an oral and written report prepared by the candidate, including completed documentation
direct observation of the candidate supervising a cabling project.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:
ICTCBL3009A Install, terminate and certify structured cabling installation.

Aboriginal people and other people from a non-English speaking background may have second language issues.

Access must be provided to appropriate learning and assessment support when required.

Assessment processes and techniques must be culturally appropriate, and appropriate to the oral communication skill level, and language and literacy capacity of the candidate and the work being performed.

In all cases where practical assessment is used it will be combined with targeted questioning to assess required knowledge. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency.

Where applicable, physical resources should include equipment modified for people with special needs.