Unit of competency Outline

Date retreived
23/07/2026 5:38 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Commission complex refrigeration/air conditioning control systems

Commission complex refrigeration/air conditioning control systems

Unit of competency
National Code
UEERA0012
State Code
OBY36
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
05/10/2020
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031315 - Refrigeration And Air Conditioning Mechanics
Original Release Date
12/07/2021
Nominal Hours
36
Description
This unit involves the skills and knowledge required to set up, adjust and commission complex control systems for refrigeration or air conditioning optimum performance.It includes applying safe working practices, testing and analysing system parameters, adjusting equipment and controls, following procedures and documenting final operating parameters and settings.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c.).Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, skills and knowledge described in this unit require a relevant contract of training, such as an Australian Apprenticeship.Additional and/or other conditions may apply in some jurisdictions subject to regulations related to refrigeration, air conditioning or electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations.Permits may also be required for some work environments, such as confined spaces, working aloft, near live electrical apparatus and site rehabilitation.
Notes
Elements and Performance Criteria
1 Prepare to commission complex control systems for refrigeration and air conditioning
  • 1.1 WHS/OHS procedures are obtained and implemented in accordance with workplace procedures
  • 1.2 WHS/OHS risk control measures and procedures for work are followed
  • 1.3 Safety hazards not previously identified are documented and risk control measures implemented
  • 1.4 Appropriate person/s is consulted to ensure the work is coordinated effectively with others involved on the worksite
  • 1.5 System operating parameters are identified by reviewing system specifications and component technical data
  • 1.6 Tools, equipment and testing devices required for the work are obtained and checked for correct operation and safety in accordance with workplace procedures
  • 1.7 Preparatory work is checked to ensure damage has not occurred and is compliant with requirements
  • 1.8 Need to test or measure live work is determined in accordance with workplace procedures and WHS/OHS requirements
  • 1.9 Circuits are checked as being isolated in accordance with WHS/OHS requirements and workplace procedures
2 Commission complex control systems for refrigeration and air conditioning
  • 2.1 WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
  • 2.2 Testing/measuring devices are connected and set up in accordance with requirements for a particular system
  • 2.3 Measurements and adjustments are made to equipment components and controls to provide optimum system performance in accordance with system specifications and regulatory requirements
  • 2.4 Decisions for dealing with unexpected situations are made from discussions with appropriate person/s, job specifications and requirements
  • 2.5 Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
  • 2.6 Commissioning is carried out efficiently without waste of materials or damage to apparatus, the surrounding environment or services applying sustainable energy principles
3 Complete and report commissioning activities
  • 3.1 WHS/OHS risk control work completion measures and procedures are followed
  • 3.2 Worksite is cleaned and made safe in accordance with workplace procedures
  • 3.3 Adjustment settings and results of commissioning work are documented and appropriate person/s notified in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
S7361 UEENEEJ126A Commission complex refrigeration/air conditioning control systems Unit of competency