Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Set out, install and commission irrigation systems
Set out, install and commission irrigation systems
Unit of competency
National Code
CPCPIG3001A
CPCPIG3001A
State Code
W9705
W9705
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
14/02/2011
Field of Education
040327 - Plumbing
Original Release Date
14/02/2011
Nominal Hours
4
Description
Notes
Elements and Performance Criteria
No information
handling of materials
hazard control
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
dirt mounds
hazardous materials and substances
other machines
pits
poles
recently filled trenches
surrounding structure and facilities
traffic control
trees
trip hazards
underground services
uneven and unstable terrain
use of tools and equipment
work site visitors and the public
working in proximity to others
use of firefighting equipment
use of first aid equipment
workplace environment and safety.
clean-up protection
stormwater protection
waste management.
Environment Protection Authority (EPA)
internal company quality assurance policy and risk management strategy
International Standards Organisation
site safety plan
workplace operations and procedures.
state or territory statutory authority
statutory plumbing authority.
chain blocks
forklifts
hand and power tools
hand excavation equipment
hand trolleys
hoists and jacks
ladders
lifting and load shifting equipment
mechanical excavation equipment
rollers
trench shoring equipment
water flow and water test equipment.
charts and hand drawings
diagrams or sketches
instructions issued by authorised organisational or external personnel
job drawings
manufacturer specifications and instructions
maps
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
regulatory and legislative requirements, particularly those pertaining to:
building codes
OHS and environmental requirements
plumbing regulations
relevant Australian standards
safe work procedures relating to setting out, installing and commissioning irrigation systems
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
copper tube, polyethylene, stainless steel and UPVC pipes
joints and components
system components, including:
automatic controls
back flow prevention devices
low voltage solenoid valves
water emitters
water emitters, which may include:
hear drive
impact
in-line turbo drippers
mist sprays
oscillating
pop up (full circle, half, quarter)
pulsating
selection of water emitters, based on:
automatic control systems
manufacturer specifications
physical site conditions
site requirements
types of plants requiring irrigated water.
hazard control
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
dirt mounds
hazardous materials and substances
other machines
pits
poles
recently filled trenches
surrounding structure and facilities
traffic control
trees
trip hazards
underground services
uneven and unstable terrain
use of tools and equipment
work site visitors and the public
working in proximity to others
use of firefighting equipment
use of first aid equipment
workplace environment and safety.
clean-up protection
stormwater protection
waste management.
Environment Protection Authority (EPA)
internal company quality assurance policy and risk management strategy
International Standards Organisation
site safety plan
workplace operations and procedures.
state or territory statutory authority
statutory plumbing authority.
chain blocks
forklifts
hand and power tools
hand excavation equipment
hand trolleys
hoists and jacks
ladders
lifting and load shifting equipment
mechanical excavation equipment
rollers
trench shoring equipment
water flow and water test equipment.
charts and hand drawings
diagrams or sketches
instructions issued by authorised organisational or external personnel
job drawings
manufacturer specifications and instructions
maps
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
regulatory and legislative requirements, particularly those pertaining to:
building codes
OHS and environmental requirements
plumbing regulations
relevant Australian standards
safe work procedures relating to setting out, installing and commissioning irrigation systems
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
copper tube, polyethylene, stainless steel and UPVC pipes
joints and components
system components, including:
automatic controls
back flow prevention devices
low voltage solenoid valves
water emitters
water emitters, which may include:
hear drive
impact
in-line turbo drippers
mist sprays
oscillating
pop up (full circle, half, quarter)
pulsating
selection of water emitters, based on:
automatic control systems
manufacturer specifications
physical site conditions
site requirements
types of plants requiring irrigated water.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
locating, interpreting and applying relevant information, standards and specifications to set out, install and commission irrigation systems
applying safety requirements throughout the work sequence, including the use of personal protective clothing and equipment
as a minimum the ability to, given the plans or specifications determine the system requirements, set out, install and commission an irrigation system sourced from an isolating valve to supply four water emitters of varying type and requiring a solenoid valve, ensuring:
correct identification of location, design and details of proposed installation
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, standards and organisational quality procedures and processes
communicating and working effectively and safely with others.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe working practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Integrated Framework Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
locating, interpreting and applying relevant information, standards and specifications to set out, install and commission irrigation systems
applying safety requirements throughout the work sequence, including the use of personal protective clothing and equipment
as a minimum the ability to, given the plans or specifications determine the system requirements, set out, install and commission an irrigation system sourced from an isolating valve to supply four water emitters of varying type and requiring a solenoid valve, ensuring:
correct identification of location, design and details of proposed installation
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, standards and organisational quality procedures and processes
communicating and working effectively and safely with others.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe working practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Integrated Framework Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W1303 | BCPIG3001A | Set out, install and commission irrigation systems | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| D7466 | CPCPIG3011A | Set out, install and commission irrigation systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W576 | CPC20908 | Certificate II in Urban Irrigation | Qualification |