Unit of competency Outline

Date retreived
22/07/2026 9:46 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Perform dogging on board a vessel

Perform dogging on board a vessel

Unit of competency
National Code
MARC057
State Code
OCH17
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
27/10/2020
State Implementation and Classification
Approved Date
09/04/2021
Field of Education
030717 - Plant And Machine Operations
Original Release Date
09/04/2021
Nominal Hours
55
Description
This unit involves the skills and knowledge required to apply slinging techniques select and inspect lifting gear and/or direct crane/operator in moving a load.This unit applies to people working in the maritime industry in the capacity of:Able Seafarer - Engine/Deck or Integrated Rating who apply safe work practices when undertaking basic dogging on a range of vesselsNavigational Watch - Deck/Engine.Licensing/Regulatory InformationLegislative and regulatory requirements are applicable to this unit. This unit is one of the requirements to obtain Australian Maritime Safety Authority (AMSA) certification as an Able Seafarer - Engine/Deck, Integrated Rating or Navigational Watch - Deck/Engine and to meet regulatory requirements this unit must be delivered consistent with Marine Orders and with the relevant sections of the International Convention on Standards of Training, Certification and Watchkeeping for Seafarers (STCW).
Notes
Elements and Performance Criteria
1 Plan job
  • 1.1 Relevant site information is obtained for related task in accordance with workplace procedures
  • 1.2 Sea conditions and use of tag lines are assessed in accordance with workplace procedures
  • 1.3 Hazards and potential hazards associated with slinging and directing loads are identified in accordance with workplace procedures
  • 1.4 Hazard control measures consistent with appropriate standards are identified to ensure safety of personnel and equipment in accordance with workplace procedures
  • 1.5 Weight, dimensions and load centre of gravity (CG) are identified and assessed
  • 1.6 Suitable lifting/slinging points on load are established
  • 1.7 Appropriate lifting equipment needs are assessed, including rig/vessel crane limitations, in accordance with workplace procedures
  • 1.8 Appropriate communication methods are established in consultation with crane/operators and other appropriate personnel
  • 1.9 Manufacturer specifications/information is obtained for special loads, as required
2 Select and inspect equipment
  • 2.1 Lifting equipment appropriate to task is selected and inspected for serviceability in accordance with workplace procedures
  • 2.2 Damaged or excessively worn lifting equipment is identified, labelled and isolated in accordance with workplace procedures
  • 2.3 Appropriate communication equipment is selected and serviceability checked
  • 2.4 Appropriate personal protective equipment (PPE) is selected and checked
3 Prepare site and equipment
  • 3.1 Hazard prevention/control measures are applied consistent with appropriate standards to ensure safety of personnel and equipment in accordance with workplace procedures
  • 3.2 Clear communications and roles of deck crew are established when working cargo with a rig crane or another vessel in accordance with workplace procedures
  • 3.3 Appropriate slinging method is selected
  • 3.4 Lifting equipment is prepared and assembled, as required
  • 3.5 Load landing destination is prepared
4 Perform tasks
  • 4.1 Knots, hitches and bends using fibre and synthetic ropes are correctly made and used in course of deck operations
  • 4.2 Lifting equipment is attached and secured to lifting hook using appropriate techniques
  • 4.3 Lifting hook is positioned over load CG
  • 4.4 Lifting equipment is attached and secured to load in an appropriate manner
  • 4.5 Tag line is attached and secured, as required
  • 4.6 Test lift is conducted to ensure load security
  • 4.7 Load is moved, and stability and control are maintained at all times
  • 4.8 Appropriate communication methods and communication signals are applied to safely coordinate load movement within sight and out-of-sight of ship’s crane operator
  • 4.9 Loads are correctly rigged using appropriate ropes and rigging gear in accordance with workplace procedures
  • 4.10 Load is landed to ensure it is stable and secure from movement, is in position to be lashed with appropriate consideration given to effects of vessel’s motion on stowed cargo when lashing cargo
5 Shut down job, clean up and maintain equipment
  • 5.1 Lifting equipment is removed or disconnected from load and prepared for next task or storage
  • 5.2 Defective equipment is isolated and tagged in accordance with workplace procedures
  • 5.3 Lifting equipment is stored in accordance with workplace procedures
  • 5.4 Hazard prevention/control measures are removed, as required, in accordance with workplace procedures
  • 5.5 Excess materials from work area are removed, as required, in accordance with workplace procedures
  • 5.6 Defects are reported and recorded in accordance with workplace procedures, and appropriate action is taken
  • 5.7 Rope, wire and cables are stowed and maintained in accordance with workplace procedures and manufacturer instructions
No information
No information
Replaces
State Code National Code Title Type
AWK82 MARC032 Perform dogging on board a vessel Unit of competency