Unit of competency Outline

Date retreived
22/07/2026 5:01 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Control timber pests

Control timber pests

Unit of competency
National Code
CPPPMT3010A
State Code
WC166
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
10/01/2012
State Implementation and Classification
Approved Date
23/05/2012
Field of Education
059901 - Pest And Weed Control
Original Release Date
23/05/2012
Nominal Hours
40
Description
This unit of competency specifies the outcomes required to implement a management plan to control timber pests. The unit requires the ability to review existing reports and to design, implement and monitor a management plan to control timber pests. The selection of appropriate equipment, chemicals, materials and methods is essential for performing the task effectively.
Notes
Elements and Performance Criteria
1 Design timber pest management plan.
  • 1.1 Work order and inspection report are reviewed to confirm task according to company requirements.
  • 1.2 Hazards are identified and risks controlled at work site according to company, legislative, and occupational health and safety (OHS) requirements.
  • 1.3 Suitable timber pest management methods are selected for control of timber pests based on inspection report and work site environment and according to legislative and company requirements.
  • 1.4 Access and application equipment for implementing timber pest management plan are identified, selected and applied according to manufacturer specifications and legislative, OHS and company requirements.
  • 1.5 Materials for implementing timber pest management plan are identified and requirements are calculated according to manufacturer specifications and legislative, OHS and company requirements.
2 Prepare to implement timber pest management plan.
  • 2.1 Timber pest management plan is reviewed to identify factors affecting completion of work order, and issues are clarified with appropriate persons according to company requirements.
  • 2.2 Suitable personal protective equipment (PPE) is selected and used according to manufacturer specifications and OHS and company requirements.
  • 2.3 Equipment is selected and operational effectiveness checked according to manufacturer specifications and legislative, OHS, company and environmental requirements.
  • 2.4 Chemicals and materials are prepared according to manufacturer specifications and environmental, legislative, OHS and company requirements.
  • 2.5 Signage and barriers are installed as required to maximise protection of public health and safety during the treatment operation.
3 Implement pest management plan.
  • 3.1 Hazards are identified and risks controlled at work site according to legislative, OHS and company requirements.
  • 3.2 Materials are installed as identified in timber pest management plan according to manufacturer specifications and environmental, legislative, OHS and company requirements.
  • 3.3 Work is conducted using safe operating practices according to manufacturer specifications and environmental, legislative, OHS and company requirements.
  • 3.4 Implementation is reviewed to check effectiveness of timber pest management plan.
  • 3.5 Emergency response procedures are implemented when necessary according to manufacturer specifications and environmental, legislative, OHS and company requirements.
4 Restore work site.
  • 4.1 Work site is restored to condition agreed with client and requirements of timber pest management plan according to environmental, legislative, OHS and company requirements.
  • 4.2 Hazards are eliminated prior to handover according to environmental, legislative, OHS and company requirements.
  • 4.3 Signage and barriers are removed when work site is available for re-use, according to work order and OHS and company requirements.
  • 4.4 Appropriate persons are notified of further hazard reduction or necessary rectification measures according to environmental, legislative, OHS and company requirements.
5 Clean, safety-check and store equipment.
  • 5.1 Equipment and PPE are cleaned and decontaminated according to manufacturer specifications and environmental, OHS and company requirements.
  • 5.2 Equipment and PPE are safety-checked and required maintenance is recorded according to manufacturer specifications and OHS and company requirements.
  • 5.3 Cleaned equipment and PPE are stored to allow ready access and re-use according to company requirements.
  • 5.4 Chemicals are transported and stored according to manufacturer specifications and OHS and company requirements.
  • 5.5 Collected waste is disposed of according to work order, manufacturer specifications and environmental, legislative, OHS and company requirements.
  • 5.6 Exposed skin is treated to remove contamination according to manufacturer specifications and OHS and company requirements.
6 Complete documentation.
  • 6.1 Required certificates and notices are prepared and issued according to environmental and legislative requirements.
  • 6.2 Company documentation is completed and distributed according to legislative and company requirements.
7 Monitor effectiveness of timber pest management plan.
  • 7.1 Periodic contact schedule is established with client according to company requirements.
  • 7.2 Regular liaison is maintained with client to monitor effectiveness of plan according to company requirements.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Work order information may include:
access to work site, including:
timing of access
access and egress points
budget allocations
completion times and dates
dress and presentation requirements
job requirements and tasks
legislative and local government requirements
OHS requirements and emergency response procedures
requirements for working in isolated and remote locations
resource requirements - equipment and materials
specific client requirements, such as:
noise control
sensitivity of occupants to pests or pest management
relationships with other customer activities
use of signage and barriers
work schedules
work site contact persons.
Inspection reports may include:
building approvals
previous inspection reports
previous written reports
treatment notices on buildings
warranties.
Company requirements may include:
access and equity policy, principles and practice
business and performance plans
client communication procedures
client confidentiality procedures
client service standards
company goals, objectives, plans, systems and processes
company issued identification badge, card or pass
company policies and procedures
defined resource parameters
dress and presentation requirements
duty of care, code of conduct and code of ethics
emergency response and evacuation procedures
employer and employee rights and responsibilities
establishing operator identity with client
internal communication channels and reporting procedures
maintenance procedures for equipment and PPE
OHS policies and procedures
personnel practices and guidelines
policies and procedures relating to own role, responsibility and delegation
quality and continuous improvement processes and standards
records and information systems and processes
training (induction and refresher) materials
work site access security clearance procedures.
Hazards may include:
allergic reactions to chemicals, pests or equipment, including latex allergies
biological and animal waste
bites and stings
blood and blood-stained products
confined or restricted spaces
contaminated clothing, materials or equipment
damaged or inappropriate equipment
dust and fibres
electrical hazards arising from:
cables
electrical fittings:
switches
lights
untested electrical equipment
fatigue
fire
gas
heights
inadequate lighting and ventilation
infectious and zoonotic diseases, such as:
scabies
Q fever
leaks, spills, splashes and sprays
mobile or vehicle hazards around plant and vehicles
moving or unguarded parts
noise
occupational violence and bullying
poor personal hygiene practices
release of substances with negative environmental impact
unsafe manual-handling techniques, including awkward and repetitive postures
unsafe underfoot conditions, such as slippery, uneven and rough surfaces
work in unfamiliar isolated or remote environments.
Work sites may include:
building surroundings
buildings
domestic, commercial or industrial premises.
Legislative requirements may include:
Australian standards, quality assurance and certification requirements
award and enterprise agreements
industry advisory standards and codes, such as:
building codes
dangerous goods codes
relevant commonwealth, state and territory legislation and local government regulations that affect company operation, such as:
anti-discrimination and diversity
chemical controls
chemical registers and manifests
consumer protection legislation
dangerous goods Acts and regulations
declared pest (plant and animal) reporting
environmental protection issues
equal employment opportunity
freedom of information
industrial relations
motor and commercial vehicle transportation
motor licence and endorsement regulations
OHS Acts and regulations
privacy
public health
trade practices
workplace consultative arrangements.
Occupational health and safety (also known as workplace health and safety) requirements may relate to:
allergic reactions, such as contact dermatitis
animal management and control procedures
communication devices for isolated or remote locations, such as:
mobile phone
two-way radio
dermatoxicological control and prevention measures
emergency procedures for contact with toxic substances, such as:
splashes in eye or on skin
inhalation
ingestion
hazard identification and risk assessment mechanisms
hierarchy of hazard control procedures
industry advisory standards
information provided by national registration authority for chemical approval and state government authorities, such as:
agriculture
environment protection
health
primary industry
injury and dangerous occurrence reporting
national and industry codes of practice
OHS control procedures, such as:
health and safety plans
job plans
job safety analyses
risk assessments
safe operating practices and procedures
safe work instructions
safe work method statements
health surveillance and monitoring, such as regular blood testing
routes of entry and potential symptoms of exposure to chemicals
safe work practices for equipment, PPE and chemical storage, including interpretation of:
MSDS
hazardous substance information, such as long latency periods
safety, induction and refresher training
selection and use of PPE and clothing appropriate to hazard
up-to-date electrical test and tag compliance.
Timber pest management methods may include:
biological controls
chemical and physical barrier treatments
cultural controls
environmental controls
management controls.
Control may be:
eradication
exclusion
partial.
Timber pests include:
timber pests found in geographic region, such as:
borers
carpenter ants
termites
wood decay fungi.
Work site environment may include:
age of timber structure
associated building or land use
dark and humid areas
drainage
geographic location
known pressure pest areas
level of moisture
previous treatments
soil type
timber type
ventilation.
Equipment may include:
borescopes
brooms
bunding materials
cameras
dishes or bowls
drills
dusters
electrical extension leads
elevated work platforms
equipment decontamination materials
flexible lights
flushing agents
generators
hoses
injectors
knives
ladders
magnifying glasses
measuring jugs
mirrors
probes
safety harnesses
sand and other absorbent materials
screwdrivers
sharps containers
shovels and rakes
sound, moisture and movement detectors
sounding instruments
specimen bottles
spray equipment
torches
trays
waste disposal containers.
Timber pest management plan may include:
advice on health, safety, legislative and environmental matters
advice on pest prevention strategies
chemical application methods
details of timber pest and timber pest activity
follow-up pest management advice, monitoring and call-back schedule
timber pest management methods
types and quantities of chemicals to be used.
Manufacturer specifications may include:
emergency response resources
equipment operating manuals
government publications
instructional guides
MSDS
other resources supplied by manufacturer, such as:
laminated cards
notices
wall posters
product labels
safety instructions pre-printed on equipment.
Materials may include:
building components
cleaning products
flammable products
pesticides
physical barriers
registered agricultural and veterinary (AGVET) products
sealing components.
Calculated requirements may apply to:
assessment of physical characteristics
chemical compatibilities
equipment used
flow rates and pressures
nozzle tip selection
recalibration of equipment
surface areas
volumes.
Appropriate persons may include:
clients
colleagues
managers
persons in control of work site
supervisors.
Personal protective equipment may include:
air-line and self-contained respirators
breathing respirators:
full-face
half-face
chemical-impervious gloves
chemical-resistant aprons
communication equipment
contaminated clothing bags
cradles
drinking fluids
dust masks
eye protection, such as:
safety glasses
goggles
eyewashes and showers
face shields (splash-proof)
first aid kits appropriate to tasks and locations
hair nets
hard hats
high-visibility vests and clothing
long pants
noise protection
non-slip safety shoes or boots
overalls, coveralls or other chemical protective clothing
prodding and probing sticks and rods
safety harnesses
soap and towels
sunscreen
tongs
torches
washable sun hats
wet-work protective clothing.
Environmental requirements may include:
clean up, containment or isolation
company policies and guidelines
emergency chemical spill control measures
hazardous materials handling
regulations, by-laws and guidelines of environmental protection agencies and government departments, such as:
agriculture
emergency services
national parks and wildlife.
Chemicals may include:
cleaning products
flammable products
pesticides
registered AGVET products.
Signage and barriers may include:
physical barriers and restraints erected to restrict access to work site
signs complying with legislative requirements or Australian standards that warn of danger or adverse conditions.
Public health and safety may affect:
animals
client staff
company staff
customers
distributors
facility users
colleagues
general public, including neighbours and bystanders
inspectors
retailers
suppliers
trade and service providers.
Emergency response procedures include:
clean up
containment
decontamination
first aid
isolation
notification of authorities
use of firefighting appliances
use of PPE
work site or workplace evacuation.
Clients may include:
bodies corporate
building supervisors
companies or organisations
environmental health officers
executive housekeepers
maintenance managers
owners
persons in control of work processes
property agents or managers
tenants.
Waste may be solid or liquid and include:
contaminated or hazardous biological waste
used containers
used or contaminated PPE, such as disposable gloves.
Company documentation may include:
client records
pest activity and inspection reports
pest management system problem and action reports
service logbooks
site management reports
site visit reports.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed by observing practical demonstration of timber pest identification and control.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the required skills and knowledge specified in this unit.
In particular the person should demonstrate the ability to:
comply with company, legislative and regulatory requirements
achieve outcomes in relation to work order
design a timber pest management plan taking into account environmental sustainability
identify hazards and risks associated with timber pest management and apply knowledge of hierarchy of hazard control
implement and monitor a timber pest management plan
select equipment and chemicals.
Context of and specific resources for assessment
Assessment of essential underpinning knowledge may be conducted in an off-site context. It is to comply with relevant regulatory or Australian standards’ requirements.
Resource implications for assessment include access to:
suitable work site or venue
suitable equipment and materials
PPE
relevant databases and information sources
company procedures, manufacturer specifications and MSDS
plain English version of relevant statutes and procedures
work order instructions, work plans and schedules, and policy documents
assessment instruments, including personal planner and assessment record book.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Property Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Guidance information for assessment
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
This unit could be assessed on its own or in combination with other units relevant to the job function, for example:
CPPPMT3002A Assess pest management options
CPPPMT3006A Apply pesticides to manage pests
CPPPMT3008A Inspect and report on timber pests
CPPPMT3043A Prepare and present pest management proposals.
Replaces
State Code National Code Title Type
S4358 PRMPM10B Control timber pests Unit of competency
Replaced By
State Code National Code Title Type
AVE24 CPPPMT3010 Control timber pests Unit of competency
State Code National Code Title Type
D766 CPP30911 Certificate III in Pest Management Qualification