Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Weld rail on tram/light rail systems using submerged ARC welding process
Weld rail on tram/light rail systems using submerged ARC welding process
Unit of competency
National Code
TLIW0044
TLIW0044
State Code
AVH49
AVH49
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
23/02/2016
Original Release Date
19/10/2015
Nominal Hours
25
Field of Education
030711 - Boilermaking And Welding
Description
This unit involves the skills and knowledge required to weld rail on tram/light rail systems using a submerged arc welding process. It covers preparing materials, selecting and setting up welding equipment, carrying out submerged arc welding, inspecting for and correcting defects, and maintaining weld records. Welds would mainly involve building up or pad welding on longer lengths of rail on tram/light rail systems. It covers welding both the rail head and the check rail.No licensing, legislative or certification requirements apply to this unit at the time of publication.
General notes
N/A
Elements and Performance Criteria
1 Prepare for welding
- 1.1 Weld requirements are identified from specifications and/or technical drawings
- 1.2 Rail surface is correctly prepared using tools and techniques appropriate to the material and process
- 1.3 Materials are assembled/aligned to specifications as required
- 1.4 Track is measured prior to commencement of welding
- 1.5 Welding machine settings and consumables are identified from job requirements, welding procedures, specifications and/or technical drawings
- 1.6 Hazards are identified, risks are assessed and control measures are implemented
2 Assemble and set up equipment
- 2.1 Welding equipment is assembled and set up safely and correctly in accordance with operating procedures
- 2.2 Defective equipment is tagged and replaced in accordance with organisational and manufacturer specifications
3 Weld rail using submerged arc process
- 3.1 Pad, butt and fillet welds are deposited correctly in flat and fillet welds in horizontal position in accordance with specifications
- 3.2 Joints are cleaned to specifications using techniques and tools appropriate to the defect, material and process
4 Inspect welds and correct faults
- 4.1 Weld joints are visually inspected against specifications
- 4.2 Track is measured to ensure welded track is within accepted tolerances
- 4.3 Weld defects are identified and remedial action is taken, where required
- 4.4 Defects are removed with minimum loss of sound metal using techniques and tools appropriate to the defect, material and process
5 Maintain weld records
- 5.1 Weld records are filled in legibly and proofread
- 5.2 Weld records are processed in accordance with organisational procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WG244 | TLIW0044A | Weld rail on tram/light rail systems using submerged arc welding process | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AD223 | TLISS00148 | Submerged ARC Welding Skill Set | Skill set |