Unit of competency Outline

Date retreived
22/07/2026 9:24 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Test and Commission Complex Electrical Equipment

Test and Commission Complex Electrical Equipment

Unit of competency
National Code
UEPMNT414A
State Code
S5123
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
07/11/2006
State Implementation and Classification
Approved Date
07/05/2008
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
07/05/2008
Nominal Hours
40
Description
1)
This unit deals with the skills and knowledge required to conduct testing and commissioning of complex and H.V. electrical wiring systems and equipment.
Notes
Elements and Performance Criteria
1 Plan and prepare for the work
  • 1.1 Work requirements are identified from request/work orders or equivalent and clarified/confirmed with appropriate parties or by site inspection
  • 1.2 Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturers' specifications, environmental requirements and enterprise procedures are identified, applied and monitored throughout the work procedure
  • 1.3 Resources required to satisfy the work plan are identified, obtained and inspected for compliance with the job specifications
  • 1.4 Relevant plans, drawings and texts are selected and interpreted in accordance with the work plan
  • 1.5 Correct size, type and quantity of materials/components are determined, obtained and inspected for compliance with the job specifications
  • 1.6 Work is planned in detail including sequencing and prioritising and considerations made, where appropriate, for the maintenance of plant security and capacity in accordance with system/site requirements
  • 1.7 Co-ordination requirements, including requests for isolations where appropriate, are resolved with others involved, affected or required by the work
  • 1.8 Potential hazards are identified and prevention and/or control measures are selected in accordance with the work plan and site procedures
  • 1.9 Work area is prepared in accordance with work requirements and site procedures
  • 1.10 Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training
2 Test wiring systems
  • 2.1 Required isolations are confirmed where appropriate in accordance with site requirements
  • 2.2 Wiring systems are tested using appropriate plans, drawings and texts in accordance with the work plan
  • 2.3 Wiring systems are tested in conjunction with others involved in, or affected by, the work in accordance with the work plan
  • 2.4 Wiring systems, including enclosures/ supports, are inspected prior to testing to ensure absence of any damage, defects and/or signs of deterioration in accordance with the work plan
  • 2.5 Fixed wiring is tested as appropriate and results/observations are interpreted and documented to confirm compliance with job specifications
3 Test the equipment
  • 3.1 Required isolations are confirmed where appropriate in accordance with site requirements
  • 3.2 Equipment is tested using appropriate plans, drawings and texts in accordance with the work plan
  • 3.3 Equipment is tested in conjunction with other involved in, or affected by, the work in accordance with the work plan
  • 3.4 Required test conditions are confirmed and the equipment is inspected to ensure absence of any damage, defects and/or signs of deterioration in accordance with the work plan
  • 3.5 Equipment is tested using appropriate test techniques in accordance with the work plan
  • 3.6 Equipment test results/observations are interpreted and documented to confirm compliance with job specifications
4 Commission the equipment
  • 4.1 Required isolations are confirmed where appropriate in accordance with site requirements
  • 4.2 Equipment is commissioned using appropriate plans, drawings and texts in accordance with the work plan
  • 4.3 Equipment is commissioned in conjunction with others involved in, or affected by, the work in accordance with the work plan
  • 4.4 Equipment is set up in accordance with operational requirements/manufacturer specifications
  • 4.5 Testing and monitoring procedures are followed and results monitored, interpreted and documented to ensure equipment operates/functions within specifications
  • 4.6 Equipment is commissioned with due regard being paid to plant security and capacity in accordance with the work plan
  • 4.7 Final job inspection is carried out and permits relinquished as required in accordance with the work plan
5 Complete the work
  • 5.1 Work is completed and appropriate personnel notified in accordance with site/enterprise requirements
  • 5.2 Work area is cleared of waste, cleaned, restored and secured in accordance with site/enterprise procedures
  • 5.3 Plant, tools and equipment are maintained and stored in accordance with site/enterprise procedures
  • 5.4 Work completion details are finalised in accordance with site/enterprise procedures
No information
No information
Replaces
State Code National Code Title Type
S3755 UTPNEG130A Test and commission complex electrical equipment Unit of competency
Replaced By
State Code National Code Title Type
WE274 UEPMNT414B Test and commission complex electrical equipment Unit of competency
State Code National Code Title Type
S507 UEP40506 Certificate IV in ESI Generation Maintenance (Electrical/Electronic) Qualification