Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Locate underground services in surveying practice
Locate underground services in surveying practice
Unit of competency
National Code
CPPSIS5061A
CPPSIS5061A
State Code
WE816
WE816
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
26/02/2013
Field of Education
031101 - Surveying
Original Release Date
26/02/2013
Nominal Hours
50
Description
This unit of competency specifies the outcomes required to locate underground services in surveying practice. It requires the ability to plan approaches in order to meet geophysics contingencies and management requirements. Functions would be carried out within organisational guidelines.
Notes
Elements and Performance Criteria
1 Plan processes to locate underground service.
- 1.1 Objectives, principal work activities and constraints are defined and documented with written survey specifications.
- 1.2 Details of instruments and basic techniques to be used are evaluated and determined.
- 1.3 Geophysics methods to locate services and surveying data requirements are determined.
- 1.4 Pertinent legal and statutory standards and requirements, and OHS standards are considered and adhered to.
- 1.5 Work is scheduled to be completed within time available.
- 1.6 Equipment required for the location of services is checked to be in good working order.
2 Implement plan to locate underground service.
- 2.1 Project management mechanisms are implemented to measure, record and report progress of activities in relation to agreed schedule and plans.
- 2.2 Required components relating to underground services are measured, managing the impact of contingencies and problems as they arise.
- 2.3 Data collected is scrutinised to determine targets on lines of radar.
- 2.4 Measured survey data is reduced to the project reference system for comparison with design.
- 2.5 Measurements are validated and recorded according to specifications.
- 2.6 Checks are completed according to organisational guidelines.
- 2.7 Processes are followed that comply with manufacturer specifications for equipment use, relevant legislation and company policy.
3 Finalise the location of underground service.
- 3.1 Relevant personnel are informed of the results according to organisational guidelines.
- 3.2 Required documentation is completed according to organisational guidelines.
- 3.3 Survey data is archived according to project specifications.
- 3.4 Review of achievements against objectives is undertaken.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the performance criteria is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Objectives may include:
agreed client requirements
written survey specifications.
Constraints may include:
coverage of project
datum
environmental factors
industry requirements
legal and statutory
financial
resource availability
time available.
Techniques may include:
field procedures
office procedures.
Geophysics methods may include:
ground penetrating radar (GPR) acquisition
interpretation of the data presented
spraying targets on the ground.
Surveying data may include:
depth
dimension
direction
flow rates
position
slope.
Legal and statutory standards may include:
local government requirements
national standards
federal and state statutes and regulations.
OHS may include:
Australian standards
developing site safety plan
identifying potential hazards
inspecting work sites
training staff in OHS requirements
using personal protective equipment and clothing
using safety equipment and signage.
Equipment required for the location of services may include:
GPR
global navigation satellite system (GNSS)
level
tape
theodolite
total station.
Project management mechanisms may include:
communicating with stakeholders
resolving disputes
monitoring and adjusting key milestones.
Contingencies may include:
equipment failure
injury to personnel
personnel turnover
observation errors
obstructions to project plan
weather.
Targets on lines of radar may include:
collecting, interpreting and reporting on location of services:
detection using GPR and cable, locating where to spray the targets on the ground
mapping the location
mapping multiple types of features, such as services, rebar and voids
mapping types of features in the one area using surveying equipment and outputting data in GIS or computer-aided design (CAD).
Measurements may include use of:
current meter
echo sounder
GNSS
level
tape
tide gauge
total station.
Specifications may include:
detailed technical descriptions of survey data and its requirements
preparation of cross-sections and plans, with all information included.
Organisational guidelines may include:
appropriate timelines
code of ethics
company policy
final product formats
formal design parameters
legislation relevant to the work or service function
operational and equipment manuals
OHS policies and procedures
personnel practices and guidelines outlining work roles and responsibilities
requirements for data processing.
Manufacturer specifications may include:
equipment specifications
operator manuals.
Legislation may include:
Australian standards
award and enterprise agreements
certification requirements
codes of practice
quality assurance requirements.
Company policy may include:
internal and external communication guidelines
company OHS standards
customer service standards
company goals, such as mission statement
governance guidelines
guidelines on the use of equipment
operational manuals
operational plan
strategic plan.
Required documentation may include:
electronic or paper-based correspondence with client
field records
final report
records of conversation
survey plots
organisational work activity sheets.
Objectives may include:
agreed client requirements
written survey specifications.
Constraints may include:
coverage of project
datum
environmental factors
industry requirements
legal and statutory
financial
resource availability
time available.
Techniques may include:
field procedures
office procedures.
Geophysics methods may include:
ground penetrating radar (GPR) acquisition
interpretation of the data presented
spraying targets on the ground.
Surveying data may include:
depth
dimension
direction
flow rates
position
slope.
Legal and statutory standards may include:
local government requirements
national standards
federal and state statutes and regulations.
OHS may include:
Australian standards
developing site safety plan
identifying potential hazards
inspecting work sites
training staff in OHS requirements
using personal protective equipment and clothing
using safety equipment and signage.
Equipment required for the location of services may include:
GPR
global navigation satellite system (GNSS)
level
tape
theodolite
total station.
Project management mechanisms may include:
communicating with stakeholders
resolving disputes
monitoring and adjusting key milestones.
Contingencies may include:
equipment failure
injury to personnel
personnel turnover
observation errors
obstructions to project plan
weather.
Targets on lines of radar may include:
collecting, interpreting and reporting on location of services:
detection using GPR and cable, locating where to spray the targets on the ground
mapping the location
mapping multiple types of features, such as services, rebar and voids
mapping types of features in the one area using surveying equipment and outputting data in GIS or computer-aided design (CAD).
Measurements may include use of:
current meter
echo sounder
GNSS
level
tape
tide gauge
total station.
Specifications may include:
detailed technical descriptions of survey data and its requirements
preparation of cross-sections and plans, with all information included.
Organisational guidelines may include:
appropriate timelines
code of ethics
company policy
final product formats
formal design parameters
legislation relevant to the work or service function
operational and equipment manuals
OHS policies and procedures
personnel practices and guidelines outlining work roles and responsibilities
requirements for data processing.
Manufacturer specifications may include:
equipment specifications
operator manuals.
Legislation may include:
Australian standards
award and enterprise agreements
certification requirements
codes of practice
quality assurance requirements.
Company policy may include:
internal and external communication guidelines
company OHS standards
customer service standards
company goals, such as mission statement
governance guidelines
guidelines on the use of equipment
operational manuals
operational plan
strategic plan.
Required documentation may include:
electronic or paper-based correspondence with client
field records
final report
records of conversation
survey plots
organisational work activity sheets.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the Assessment Guidelines for this Training Package.
Overview of assessment
This unit of competency could be assessed on its own or in combination with other units relevant to the job function, for example CPPSIS5048A Conduct an engineering survey, CPPSIS5049A Conduct an engineering surveying project, and CPPSIS5057A Carry out a precision survey.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
matching objectives with resources to meet project deadlines
applying geophysics processes to survey practices
measuring a range of components relating to underground services
knowledge of geophysics methods.
Specific resources for assessment
Resource implications for assessment include access to:
assessment instruments, including personal planner and assessment record book
assignment instructions, work plans and schedules, policy documents and duty statements
registered training provider of assessment services
relevant guidelines, regulations and codes of practice
suitable venue and equipment.
Access must be provided to appropriate learning and assessment support when required.
Where applicable, physical resources should include equipment modified for people with disabilities.
Context of assessment
Holistic: based on the performance criteria, evidence guide, range statement and required skills and knowledge.
Method of assessment
Demonstrated over a period of time and observed by the assessor (or assessment team working together to conduct the assessment).
Demonstrated competency in a range of situations, which may include customer/workplace interruptions and involvement in related activities normally experienced in the workplace.
Obtained by observing activities in the field and reviewing induction information. If this is not practicable, observation in realistic simulated environments may be substituted.
Guidance information for assessment
Assessment requires that the clients’ objectives and industry expectations are met. If the clients’ objectives are narrowly defined or not representative of industry needs, it may be necessary to refer to portfolio case studies of a variety of SIS requirements to assess competency.
Oral questioning or written assessment and hypothetical situations (scenarios) may be used to assess underpinning knowledge (in assessment situations where the candidate is offered a preference between oral questioning or written assessment, questions are to be identical).
Supplementary evidence may be obtained from relevant authenticated correspondence from existing supervisors, team leaders or specialist training staff.
All practical demonstration must adhere to the safety and environmental regulations relevant to each State or Territory.
Overview of assessment
This unit of competency could be assessed on its own or in combination with other units relevant to the job function, for example CPPSIS5048A Conduct an engineering survey, CPPSIS5049A Conduct an engineering surveying project, and CPPSIS5057A Carry out a precision survey.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
matching objectives with resources to meet project deadlines
applying geophysics processes to survey practices
measuring a range of components relating to underground services
knowledge of geophysics methods.
Specific resources for assessment
Resource implications for assessment include access to:
assessment instruments, including personal planner and assessment record book
assignment instructions, work plans and schedules, policy documents and duty statements
registered training provider of assessment services
relevant guidelines, regulations and codes of practice
suitable venue and equipment.
Access must be provided to appropriate learning and assessment support when required.
Where applicable, physical resources should include equipment modified for people with disabilities.
Context of assessment
Holistic: based on the performance criteria, evidence guide, range statement and required skills and knowledge.
Method of assessment
Demonstrated over a period of time and observed by the assessor (or assessment team working together to conduct the assessment).
Demonstrated competency in a range of situations, which may include customer/workplace interruptions and involvement in related activities normally experienced in the workplace.
Obtained by observing activities in the field and reviewing induction information. If this is not practicable, observation in realistic simulated environments may be substituted.
Guidance information for assessment
Assessment requires that the clients’ objectives and industry expectations are met. If the clients’ objectives are narrowly defined or not representative of industry needs, it may be necessary to refer to portfolio case studies of a variety of SIS requirements to assess competency.
Oral questioning or written assessment and hypothetical situations (scenarios) may be used to assess underpinning knowledge (in assessment situations where the candidate is offered a preference between oral questioning or written assessment, questions are to be identical).
Supplementary evidence may be obtained from relevant authenticated correspondence from existing supervisors, team leaders or specialist training staff.
All practical demonstration must adhere to the safety and environmental regulations relevant to each State or Territory.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AXG75 | CPPSIS5061 | Locate underground services in surveying practice | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J357 | CPP50112 | Diploma of Surveying | Qualification |