Unit of competency Outline

Date retreived
22/07/2026 10:55 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Manage IT project delivery

Manage IT project delivery

Unit of competency
National Code
ICAPMG604A
State Code
D7925
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
18/07/2011
State Implementation and Classification
Approved Date
26/03/2012
Field of Education
080315 - Project Management
Original Release Date
26/03/2012
Nominal Hours
40
Description
This unit describes the performance outcomes, skills and knowledge required to manage the creation and delivery of the products of an information technology (IT) project within small, medium or large organisations.
Notes
Elements and Performance Criteria
1. Manage systems analysis and design
  • 1.1 Apply systems thinking to project design
  • 1.2 Model IT process and systems according to specifications
  • 1.3 Re-engineer business processes
  • 1.4 Control IT systems development
  • 1.5 Review IT architecture
  • 1.6 Manage the design and integration of the system
2. Facilitate project-related workshops
  • 2.1 Apply facilitation techniques
  • 2.2 Apply problem-solving techniques
  • 2.3 Facilitate requirements gathering
  • 2.4 Facilitate IT design workshops
3. Manage IT project team performance
  • 3.1 Establish a project team performance framework
  • 3.2 Measure team member performance
  • 3.3 Manage the performance of technical staff
  • 3.4 Manage project team dissolution
4. Manage the project delivery cycle
  • 4.1 Delegate project work to project team members
  • 4.2 Review and report status of project
  • 4.3 Assess progress and update plans
  • 4.4 Assess the quality of deliverables and rectify where required
  • 4.5 Control project issues and take corrective action
  • 4.6 Update project control documents
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Model may include:
context and dataflow diagrams
entity relationship diagrams
interaction models
object models
PMBOK and PRINCE2
screen prototypes
state models
system design models
system diagrams
use cases
user interaction and transaction diagrams.
Re-engineer may include:
business process re-engineering
business process redesign
business transformation
lean IT.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
manage the execution of a complex IT project, including aspects of the IT solution definition and design process.
Context of and specific resources for assessment
Assessment must ensure access to:
appropriate learning and assessment support when required
modified equipment for people with special needs
real or appropriate simulated organisation with a desire to implement an IT project to address an identified problem, opportunity or unfulfilled legislative need.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct observation of the candidate carrying out project work
verbal or written questioning to assess required knowledge and skills
review of reports and implementation plans
review of a portfolio of the project work undertaken.
Note: The preferred assessment method is through a workplace project or through a simulated medium to large enterprise workplace.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, where appropriate.
Assessment processes and techniques must be culturally appropriate, and suitable to the communication skill level, language, literacy and numeracy capacity of the candidate and the work being performed.
Indigenous people and other people from a non-English speaking background may need additional support.
In cases where practical assessment is used it should be combined with targeted questioning to assess required knowledge.
Replaced By
State Code National Code Title Type
AUV46 ICTPMG604 Manage ICT project delivery Unit of competency
State Code National Code Title Type
D579 ICA60411 Advanced Diploma of Information Technology Project Management Qualification