Unit of competency Outline

Date retreived
23/07/2026 7:34 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Undertake storm and water damage operations

Undertake storm and water damage operations

Unit of competency
National Code
PUASES008A
State Code
AVL16
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
17/08/2012
State Implementation and Classification
Approved Date
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
Nominal Hours
40
Description
This unit covers the competency required to undertake storm and water damage operations as a member of a response team.This unit replaces PUASES001B Undertake storm and water damage operations.
Notes
Elements and Performance Criteria
1. Prepare for storm and water operations
  • 1.1 Operation and task information is obtained through situational awareness and command structure at an incident site
  • 1.2 Hazard identification, risk assessment and control measures are undertaken as required by organisational policies and procedures
  • 1.3 Equipment is selected based on incident information and is checked to ensure it is ready for operational use
  • 1.4 Personal protective equipment is selected and worn
  • 1.5 Work area isolation methods are applied to ensure safety in accordance with organisational policies and procedures
  • 1.6 Support for safe and timely evacuation is provided, as required
2. Provide information which assists with operations
  • 2.1 Liaison with stakeholders is undertaken to provide information which increases awareness of situation, safety and facilitate operational requirements
  • 2.2 Information is provided to team leader, as required
3. Undertake storm and water operations
  • 3.1 Own safety is ensured when undertaking and completing operational tasks by working safely in conjunction with others
  • 3.2 Debris is removed, cleared and/or controlled to minimise risk of injury and further damage, and safe access to and from incident site is provided
  • 3.3 Techniques for temporary repairs and/or improvised support are applied in accordance with organisational standard operating procedures to buildings or structures to make safe, minimise further damage and maximise safety
  • 3.4 Sandbagging techniques are used to minimise further damage
  • 3.5 Water diversions are created to mitigate the effects of damage, as required
  • 3.6 Rescue operation of teammember/s is performed in accordance with organisational policies and procedures
  • 3.7 Support is provided to personnel undertaking roof repairs and/or working at height through the set up, placement and access to appropriate tools and equipment
  • 3.8 Trees causing a hazard to life or property are secured, removed and/or reported according to organisational policies and procedures
4. Complete operations
  • 4.1 Equipment is recovered, cleaned and serviced according to organisational standards and manufacturer's guidelines
  • 4.2 Equipment failure and/or deficiency is reported according to organisational procedures
  • 4.3 Signs and symptoms of operational stress in self and others are recognised and reported
  • 4.4 Information required for operational documentation and equipment logs is contributed to
  • 4.5 Debrief is participated in as required by organisational policies and procedures
The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below.
Operation and task information may include:
access and egress routes
command, control and coordination arrangements
extent and nature of damage
location, magnitude and type of event
potential hazards
weather forecast
Situational awareness may include:
systematic information seeking process where operational task information is gathered, monitored and reassessed and includes:
damage found
evacuation of immediate area
evacuation plan
hazard assessment
hazardous trees
height
identification of underlying hazards
scene assessment
size up
walk around/inspection of site
water levels
Hazards may include:
adverse weather (particularly high winds and rain)
animals and insects
contaminants/chemical/biological
damaged structures
debris
equipment
fatigue and/or operational stress
hazardous materials
mud
night/low light operations
people
terrain
threatening trees
time pressure
traffic
weather - hot/cold, wet/wind
utilities including electricity, gas, water and sewerage
Equipment may include:
anchors
chainsaws/polesaws
generators
hand tools (crowbars, hammers, handsaws, knives, loppers, nails, pliers, screwdrivers, screws, snips)
ladders
lighting
personal protective equipment
petrol and electric
power tools (including drills, reciprocating saw, nail guns, circular saws, tech drivers)
props (acrow props) and shoring materials
roof safety kit
ropes
sandbags and sand bagging machines
submersible and non-submersible pumps
timber batten
timber sheeting
water proofing materials plus their fixings (tarpaulins, plastic sheeting)
water proofing tapes and sealant materials
Work area isolation methods may include:
placement of barrier
placement of safety cones, demarcation tapes and flashing beacons
Evacuation may include:
using readily available transport
Stakeholders may include:
crew members
home owner/s
members of household
other agencies
team leader
Information may include:
self-help provided to householders either directly or over the telephone
warnings provided face-to-face or over the telephone to householders, by public address systems, such as loud-hailers as defined by operations managers and delivered under direction
Working safely may include:
Avoiding exposure to contaminated water and mud where possible
Identifying possible structural safety issues
Manual handing
Monitoring and re-assessing
Personal protective equipment
Prompt treatment and reporting of injuries
Public control
Risk assessment
Universal precautions against infection
Techniques for temporary repairs may include:
coverings
external and internal weatherproofing
replacement
ropes
sealing
stapling
shoring
tape
tarping
tie off/securing
Sandbagging may include:
constructing walls
constructing water diversion
filling by hand
filling by machine
stacking
using as weights/holding down
Water diversions may include:
earth walls
fabricated barriers
laying of sandbags
pumping
salvaged material
synthetic materials
tarps/plastic
trenching
Rescue operation of team member/s may include:
casualty handling
casualty packaging
extrication
rescue of a team member from height
Set up, placement and access to appropriate tools and equipment may include:
ladders (care and use), climbing techniques, types of ladders, placement/set up, safety, stabilisation, alternatives
lighting placement such as set up, use of generators, placement, types of lighting (torches, portable lighting, headlamps)
Operational documentation may include:
incident report
injury reporting
log books
notice to occupant
risk assessment
The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for this Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Assessment must confirm the ability to:
perform effective temporary structural weather proofing techniques to minimise further damage and to make safe
use mitigation techniques to minimise and/or restrict water damage
support roof/height operations to complete operations effectively.
Consistency in performance
Competency should be demonstrated during exercises and/or incidences reflecting environmental variance in a simulated emergency environment or on-the-job.
Context of and specific resources for assessment
Context of assessment
Competency should be assessed completing storm damage and flood mitigation operations, exercises or scenarios as a member of a team acting under direction and general supervision.
Specific resources for assessment
Access is required to:
incident, exercise or simulation, or series of tasks
equipment used in storm and water damage operations
response team.
Method of assessment
In a public safety environment assessment is usually conducted via direct observation in a training environment or in the workplace via subject matter supervision and/or mentoring, which is typically recorded in a competency workbook.
Assessment is completed using appropriately qualified assessors who select the most appropriate method of assessment.
Assessment may occur in an operational environment or in an industry-approved simulated work environment. Forms of assessment that are typically used include:
direct observation
interviewing the candidate
journals and workplace documentation
third party reports from supervisors
written or oral questions.
Replaces
State Code National Code Title Type
D3802 PUASES001B Undertake storm and water damage operations Unit of competency
Replaced By
State Code National Code Title Type
OAX59 PUASES008 Undertake storm and water damage operations Unit of competency