Unit of competency Outline
Date retreived
22/07/2026 9:04 AM AWST
22/07/2026 9:04 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Use high pressure water jetting equipment
Use high pressure water jetting equipment
Unit of competency
National Code
MSAPMWJ201A
MSAPMWJ201A
State Code
S7294
S7294
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
25/07/2011
Field of Education
030717 - Plant And Machine Operations
Original Release Date
25/07/2011
Nominal Hours
55
Description
This unit of competency covers the use of high pressure water jetting equipment under the supervision of a competent operator. The job may be to clean, prepare, abrade, cut or demolish concrete, steel or other plant, equipment, vessels or infrastructure. This work is undertaken in compliance with AS/NZS 4233.1: 2013 High Pressure Water Jetting Systems Part 1. Safe Operation and Maintenance, or its authorised replacement and Safe Work Australia Guide for Managing Risks from High Pressure Water Jetting December 2013, its state equivalent (where one exists) or the authorised replacement.
Notes
Elements and Performance Criteria
1 Prepare for work
- 1.1 Obtain required job details as part of a team
- 1.2 Complete site access and work control requirements
- 1.3 Identify site hazards and required hazard controls
- 1.4 Prepare required equipment under supervision
- 1.5 Participate in toolbox meeting or similar, as required
- 1.6 Complete required pre-work paperwork
2 Complete on-site preparation
- 2.1 Arrive at site ready for job
- 2.2 Liaise with job owner, as appropriate
- 2.3 Obtain required permits/work authorities, as directed
- 2.4 Follow job pack as directed
- 2.5 Check available water
- 2.6 Check waste disposal
- 2.7 Recognise and control job and site-specific hazards
3 Set up job under supervision
- 3.1 Prepare worksite
- 3.2 Set up water jetting equipment
- 3.3 Liaise with other work groups, as appropriate
- 3.4 Establish appropriate means of communication between operators
- 3.5 Ensure hazard controls are operational and adequate
- 3.6 Check and use required personal protective equipment
- 3.7 Test emergency shut-off
4 Undertake water jetting job in accordance with procedures
- 4.1 Start up high pressure water jetting system
- 4.2 Communicate as appropriate
- 4.3 Operate equipment to proceed with job, as specified
- 4.4 Monitor job conditions
- 4.5 Monitor job and equipment, as directed
- 4.6 Maintain required line of sight
- 4.7 Monitor hazards and activate emergency stop, as required
- 4.8 Recognise faults and take appropriate action
- 4.9 Complete required paperwork
5 Complete job
- 5.1 Shut down equipment
- 5.2 Clean job site and equipment
- 5.3 Service and inspect equipment under supervision, as required
- 5.4 Store equipment, as required
- 5.5 Restock running spares and consumables, as directed
- 5.6 Report any issues or incidents, as required
- 5.7 Participate in debrief
- 5.8 Complete required paperwork
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Procedures
All operations are performed in accordance with standard procedures. Procedures may be written, verbal, computer-based or in some other form, and may include:
all work instructions
standard operating procedures (SOPs)
Australian standards
Guidance Notes
formulas/recipes
batch sheets
temporary instructions
any similar instructions provided for the smooth running of the plant
good operating practice as may be defined by industry codes of practice (e.g. Responsible Care) and government regulations
Site access requirements
Site access requirements may include:
site induction
other site/client requirements
Work control requirements
Work control requirements may include:
client/site requirements, such as permits or other authorities to enter site, commence and continue work
Prepare equipment
Preparation of required equipment may include:
selecting (e.g. from store) equipment needed for the job, under direction
checking equipment is in appropriate condition for the job, under supervision
checking equipment is within inspection date
loading equipment onto truck or similar, as directed
filling fuel and ensuring adequate supply of other consumables, as directed
Equipment
Equipment may include:
pump
pump motor/driver
hoses
guns, lances and nozzles
personal protective equipment
other equipment, plant, tools and hazard control devices required for the job
Job owner
Job owner may include:
client or their representative
site manager or their representative
production manager or their representative
maintenance manager or their representative
other person with prime responsibility for the plant/plant area which is the subject of the water jetting
Job paperwork
Job paperwork may be electronic, hard copy or other format and may include:
tool storeroom records
equipment loaded records
maintenance/inspection records/checklists
tag out/reports for failed equipment
hazard controls
work packs
Personal protective equipment
Personal protective equipment may include:
personal protective equipment as specified in:
Section 4 AS/NZS 4233.1: 2013 High Pressure Water Jetting Systems Part 1. Safe Operation and Maintenance, or its authorised replacement
Section 5 Safe Work Australia Guide for Managing Risks from High Pressure Water Jetting December 2013, or its authorized replacement
medical alert card as specified in Section 9.5 of AS/NZS 4233.1: 2013 High Pressure Water Jetting Systems Part 1. Safe Operation and Maintenance, or its authorised replacement
other equipment as required
Liaise with job owner
Liaise with job owner may include:
confirming job owner needs and standards
confirming job and job site
checking job owner is satisfied with completed job
confirming compliance with site requirements
other job owner communications
Job pack
Job pack may include:
permits/clearances
safe work method statements
job safety and environment analysis (JSEA) or other hazard analysis and control information
Safety Data Sheets (SDS)
Water
Water is to be checked for appropriate:
amount (volume and pressure)
quality/properties
availability
Waste disposal
Waste disposal checks ensure that waste generated will be disposed of in an environmentally appropriate manner and in accordance with site requirements. Waste may include:
contaminated water
material removed by water jetting
fuel or similar waste
other wastes
Worksite preparation
Worksite preparation may include:
establishing exclusion zone (e.g. with barricades or tape)
fixing signage
ensuring safe footing for personnel
participating in/verifying isolations
Prepare water jetting equipment
Preparing water jetting equipment may include:
interpreting equipment markings
assembling equipment
checking electrical earth
flushing equipment
visual inspection of hoses
Communication
Communication may include:
hand signals
radio head phones
other appropriate means
Hazards
Hazards may include:
high pressure hazards
site/process hazards
hazards arising from materials in job site, including materials being removed by water jetting
hose set-up and hose runs
Hazard controls
Hazard controls may include:
appropriate controls for all hazards identified
controls identified in the relevant permits to work
controls required by AS/NZS 4233.1: 2013 High Pressure Water Jetting Systems Part 1. Safe Operation and Maintenance, or its authorised replacement
other appropriate controls
Job conditions
Job conditions may include:
total work hours (for day/from base)
rest/rotation periods
weather
heat stress symptoms
site conditions
Monitor job and equipment
Monitoring job and equipment includes monitoring as directed:
the pump
system efficiency
product quality
mechanical equipment
Appropriate action
Appropriate action includes:
recognising actual and potential problems
determining problems needing action
determining possible fault causes
rectifying problem using appropriate solution within area of responsibility
following through items initiated until final resolution has occurred
reporting problems outside area of responsibility to designated person
Solutions
Solutions may include:
activating emergency switch
stopping work until situation resolved
raising alarm
responding to injury
Health, safety and environment (HSE)
All operations to which this unit applies are subject to stringent HSE requirements, which may be imposed through federal or state/territory legislation, and these must not be compromised at any time. Where there is an apparent conflict between Performance Criteria and HSE requirements, the HSE requirements take precedence
Procedures
All operations are performed in accordance with standard procedures. Procedures may be written, verbal, computer-based or in some other form, and may include:
all work instructions
standard operating procedures (SOPs)
Australian standards
Guidance Notes
formulas/recipes
batch sheets
temporary instructions
any similar instructions provided for the smooth running of the plant
good operating practice as may be defined by industry codes of practice (e.g. Responsible Care) and government regulations
Site access requirements
Site access requirements may include:
site induction
other site/client requirements
Work control requirements
Work control requirements may include:
client/site requirements, such as permits or other authorities to enter site, commence and continue work
Prepare equipment
Preparation of required equipment may include:
selecting (e.g. from store) equipment needed for the job, under direction
checking equipment is in appropriate condition for the job, under supervision
checking equipment is within inspection date
loading equipment onto truck or similar, as directed
filling fuel and ensuring adequate supply of other consumables, as directed
Equipment
Equipment may include:
pump
pump motor/driver
hoses
guns, lances and nozzles
personal protective equipment
other equipment, plant, tools and hazard control devices required for the job
Job owner
Job owner may include:
client or their representative
site manager or their representative
production manager or their representative
maintenance manager or their representative
other person with prime responsibility for the plant/plant area which is the subject of the water jetting
Job paperwork
Job paperwork may be electronic, hard copy or other format and may include:
tool storeroom records
equipment loaded records
maintenance/inspection records/checklists
tag out/reports for failed equipment
hazard controls
work packs
Personal protective equipment
Personal protective equipment may include:
personal protective equipment as specified in:
Section 4 AS/NZS 4233.1: 2013 High Pressure Water Jetting Systems Part 1. Safe Operation and Maintenance, or its authorised replacement
Section 5 Safe Work Australia Guide for Managing Risks from High Pressure Water Jetting December 2013, or its authorized replacement
medical alert card as specified in Section 9.5 of AS/NZS 4233.1: 2013 High Pressure Water Jetting Systems Part 1. Safe Operation and Maintenance, or its authorised replacement
other equipment as required
Liaise with job owner
Liaise with job owner may include:
confirming job owner needs and standards
confirming job and job site
checking job owner is satisfied with completed job
confirming compliance with site requirements
other job owner communications
Job pack
Job pack may include:
permits/clearances
safe work method statements
job safety and environment analysis (JSEA) or other hazard analysis and control information
Safety Data Sheets (SDS)
Water
Water is to be checked for appropriate:
amount (volume and pressure)
quality/properties
availability
Waste disposal
Waste disposal checks ensure that waste generated will be disposed of in an environmentally appropriate manner and in accordance with site requirements. Waste may include:
contaminated water
material removed by water jetting
fuel or similar waste
other wastes
Worksite preparation
Worksite preparation may include:
establishing exclusion zone (e.g. with barricades or tape)
fixing signage
ensuring safe footing for personnel
participating in/verifying isolations
Prepare water jetting equipment
Preparing water jetting equipment may include:
interpreting equipment markings
assembling equipment
checking electrical earth
flushing equipment
visual inspection of hoses
Communication
Communication may include:
hand signals
radio head phones
other appropriate means
Hazards
Hazards may include:
high pressure hazards
site/process hazards
hazards arising from materials in job site, including materials being removed by water jetting
hose set-up and hose runs
Hazard controls
Hazard controls may include:
appropriate controls for all hazards identified
controls identified in the relevant permits to work
controls required by AS/NZS 4233.1: 2013 High Pressure Water Jetting Systems Part 1. Safe Operation and Maintenance, or its authorised replacement
other appropriate controls
Job conditions
Job conditions may include:
total work hours (for day/from base)
rest/rotation periods
weather
heat stress symptoms
site conditions
Monitor job and equipment
Monitoring job and equipment includes monitoring as directed:
the pump
system efficiency
product quality
mechanical equipment
Appropriate action
Appropriate action includes:
recognising actual and potential problems
determining problems needing action
determining possible fault causes
rectifying problem using appropriate solution within area of responsibility
following through items initiated until final resolution has occurred
reporting problems outside area of responsibility to designated person
Solutions
Solutions may include:
activating emergency switch
stopping work until situation resolved
raising alarm
responding to injury
Health, safety and environment (HSE)
All operations to which this unit applies are subject to stringent HSE requirements, which may be imposed through federal or state/territory legislation, and these must not be compromised at any time. Where there is an apparent conflict between Performance Criteria and HSE requirements, the HSE requirements take precedence
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that use of equipment is understood and that the importance of critical properties, settings and readings is known. Competence must be demonstrated in the operation of equipment to the level required for this unit of competency.
Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective actions.
Holistic assessment of this unit of competency with other related units is preferred.
Consistent performance should be demonstrated. In particular look to see that:
hazards are identified and controlled
job is completed efficiently and to required standards
quality is monitored
required measurements/observations are continually made
all health, safety and environment (HSE) requirements are followed
problems are anticipated and appropriate action is taken (i.e. problem fixed or reported).
The assessor should be able to demonstrate competence in water jetting operations and have adequate industry experience (with three to five years being a guideline) in water jetting.
Context of and specific resources for assessment
Assessment will require access to operating equipment over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations.
Assessment will occur over a range of situations which will include disruptions to normal, smooth operations.
Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this unit of competency. Simulation should be based on the actual plant and will include 'walk-throughs' of the relevant competency components. A bank of scenarios/case studies/what ifs and questions will be required to probe the reasoning behind observable actions.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that use of equipment is understood and that the importance of critical properties, settings and readings is known. Competence must be demonstrated in the operation of equipment to the level required for this unit of competency.
Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective actions.
Holistic assessment of this unit of competency with other related units is preferred.
Consistent performance should be demonstrated. In particular look to see that:
hazards are identified and controlled
job is completed efficiently and to required standards
quality is monitored
required measurements/observations are continually made
all health, safety and environment (HSE) requirements are followed
problems are anticipated and appropriate action is taken (i.e. problem fixed or reported).
The assessor should be able to demonstrate competence in water jetting operations and have adequate industry experience (with three to five years being a guideline) in water jetting.
Context of and specific resources for assessment
Assessment will require access to operating equipment over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations.
Assessment will occur over a range of situations which will include disruptions to normal, smooth operations.
Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this unit of competency. Simulation should be based on the actual plant and will include 'walk-throughs' of the relevant competency components. A bank of scenarios/case studies/what ifs and questions will be required to probe the reasoning behind observable actions.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AWC12 | MSMWJ201 | Use high pressure water jetting equipment | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| S668 | MSA30309 | Certificate III in Surface Preparation and Coating Application | Qualification |