Unit of competency Outline
Date retreived
22/07/2026 1:07 PM AWST
22/07/2026 1:07 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Undertake basic maintenance of electrical systems
Undertake basic maintenance of electrical systems
Unit of competency
National Code
MARB032
MARB032
State Code
OAB82
OAB82
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
06/12/2018
Field of Education
031701 - Maritime Engineering
Original Release Date
06/12/2018
Nominal Hours
35
Description
Notes
Elements and Performance Criteria
1 Plan maintenance activities
- 1.1 Maintenance plan is accessed to determine electrical system maintenance requirements
- 1.2 Inspections are conducted and additional non-routine maintenance requirements are determined
- 1.3 System specifications and diagrams for electrical systems are obtained
- 1.4 Tasks are planned and sequenced in conjunction with others involved in or affected by maintenance work
- 1.5 Consumables and equipment are selected and checked for serviceability
2 Complete preventative maintenance
- 2.1 Electrical system is safely isolated according to regulatory and work health and safety (WHS)/occupational health and safety (OHS) requirements
- 2.2 WHS/OHS risk control measures and procedures for carrying out work are followed
- 2.3 Preventative maintenance is carried out in compliance with system specifications
- 2.4 Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes
- 2.5 Work is carried out efficiently without waste of materials and damage to equipment and machinery or other services
- 2.6 Maintenance work is checked to verify that it conforms with technical specifications
3 Complete breakdown maintenance
- 3.1 Nature of breakdown is confirmed using maintenance records and or log book entries related to reported breakdown
- 3.2 Restrictions are applied to operations, as necessary, and Master is notified
- 3.3 Limits of repair work that can be carried out are established according to relevant state or territory electrical licensing requirements
- 3.4 System is isolated
- 3.5 Repair work is carried out according to system specifications
- 3.6 Master is notified of completion of repair work and details are documented
4 Clean up and complete documentation
- 4.1 Work area is cleared and cleaned
- 4.2 Materials are disposed of or recycled according to legislative and workplace requirements
- 4.3 Tools and equipment are cleaned, checked and stored according to workplace procedures
- 4.4 Electrical system and equipment are put back into service and monitored for correct operation according to organisational practices
- 4.5 Maintenance report is completed according to workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH800 | MARB007 | Undertake basic maintenance of electrical systems | Unit of competency |