Unit of competency Outline

Date retreived
23/07/2026 3:21 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Run up a steam turbine

Run up a steam turbine

Unit of competency
National Code
UEPOPS131
State Code
ODY12
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
20/04/2022
State Implementation and Classification
Approved Date
14/04/2023
Field of Education
030717 - Plant And Machine Operations
Original Release Date
14/04/2023
Nominal Hours
54
Description
This unit involves the skills and knowledge required to conduct a steam turbine run-up to a stable operating condition.Run-up of a steam turbine will involve the operator making a sequence of checks prior to and during start-up. This ensures that loading the turbine is completed in a safe and consistent manner.Competency in this unit requires the ability to plan and prepare steam turbine run-up work, conduct steam turbine run-up, test steam turbine and complete documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator.Power generation plant operators are trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare steam turbinework
  • 1.1 Work health and safety (WHS)/occupational health and safety (OHS) regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, environmental requirements and workplace procedures are identified, applied and monitored
  • 1.2 Work requirements are identified from relevant personnel and documentation in accordance with workplace procedures
  • 1.3 Preoperational checks are carried out on steam turbine plant in accordance with manufacturers' recommendations and specifications, and workplace procedures
  • 1.4 Turbine running-up and loading schedule are ascertained from relevant documentation in accordance with manufacturers' recommendations and specifications, and workplace procedures
2 Take action to commencerun-up steam turbine
  • 2.1 Steam turbine and generator auxiliary systems are made available to support steam turbine run-up in accordance with manufacturers' recommendations and specifications, and workplace procedures
  • 2.2 Steam turbine plant is monitored to detect deviations from normal operating conditions in accordance with workplace procedures
  • 2.3 Corrective actions are taken to rectify steam turbine abnormalities in accordance with manufacturers' recommendations and specifications, and workplace procedures
  • 2.4 Steam generator is synchronised and connected to electrical system in accordance with manufacturers' recommendations and specifications, and workplace procedures
3 Test steam turbineplant operation
  • 3.1 Tests are performed in accordance with workplace procedures
  • 3.2 Power generation system and steam turbine plant are observed for operational response in accordance with workplace procedures
  • 3.3 Steam turbine plant is returned to required operational status upon completion of testing in accordance with workplace procedures
4 Analyse system faults
  • 4.1 Causes of abnormal steam turbine plant operating conditions are identified by analysing technical and operational information in accordance with workplace procedures
  • 4.2 Steam turbine plant integrity and personnel safety is maintained through consultation with relevant personnel and technical and operational documentation in accordance with workplace procedures
  • 4.3 Relevant personnel are notified when defects are detected in accordance with workplace procedures
5 Complete documentation
  • 5.1 Steam turbine plant problems, movements and status are reported in accordance with workplace procedures
  • 5.2 Documentation is updated in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
OAG54 UEPOPS411 Run up a steam turbine Unit of competency
State Code National Code Title Type
BHQ2 UEP40122 Certificate IV in ESI Generation Qualification
BHP9 UEP50122 Diploma of ESI Generation Qualification