Unit of competency Outline

Date retreived
23/07/2026 2:20 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Acceptance test new systems and equipment

Acceptance test new systems and equipment

Unit of competency
National Code
ICTTEN5058A
State Code
D3479
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
15/06/2010
State Implementation and Classification
Approved Date
12/06/2014
Field of Education
031309 - Communications Equipment Installation And Maintenance
Original Release Date
12/06/2014
Nominal Hours
120
Description
This unit describes the performance outcomes, skills and knowledge required to acceptance test telecommunications equipment. It involves the method of ensuring new system readiness through the application of appropriate inspections and tests to confirm compliance and performance.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of endorsement but users should confirm requirements with the relevant federal, state or territory authority.
Notes
Elements and Performance Criteria
1. Prepare to conduct acceptance testing
  • 1.1. Obtain installation and commissioning documents and planning specifications from appropriate personnel to ensure the installed system is as planned and specified
  • 1.2. Visually inspect new installation and verify compliance of the system against relevant legislation, codes, regulations and standards
  • 1.3. Select and obtain required test equipment for suitability of acceptance testing
  • 1.4. Prepare acceptance schedule and test criteria in consultation with appropriate personnel
2. Conduct acceptance testing
  • 2.1. Undertake and analyse performance tests to ensure measurements meet with predetermined specifications and approved operating margins
  • 2.2. Verify performance levels to be within tolerance specifications
  • 2.3. Test protection mechanisms to ensure performance criteria meets the specified standard
  • 2.4. Test alarms for satisfactory operation
  • 2.5. Refer identified problems to appropriate personnel for remedial action
  • 2.6. Record all acceptance test procedures and results
3. Complete administrative tasks
  • 3.1. Complete acceptance documentation including recommendations
  • 3.2. Notify appropriate personnel and obtain sign off
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Installation and commissioning documents may include:
agreed modifications to original design plan
commissioning test results
preliminary test results
recommendations from commissioning procedures.
Appropriate personnel may include:
network manager
planning manager
project manager.
Installed system may include:
Access Network
broadband access network
IP networks
radio network
switching
transmission
wireless access network.
Relevant legislation, codes, regulations and standards include:
Australian Communications Industry Forum (ACIF) standards and codes
Australian Communications and Media Authority (ACMA) technical standards
International Standards ISO 9000 and 9001
International Telecommunications Union (ITU) standards
OHS
Privacy Act
private property law.
Test equipment may include:
digital analysers
global system for mobiles (GSM) spectrum frequency synthesiser
optical fibre power meters
optical time domain reflectometer (OTDR)
protocol analysers
spectrum analysers.
Test criteria may include:
live traffic tests
normal and extreme load tests
test environment
test margins and errors.
Performance tests may include:
compliance tests:
electromagnetic compatibility (EMC)
electromagnetic interference (EMI)
stability tests
transmission tests.
Protection mechanisms may include:
uninterrupted power supply (UPS)
earth leakage breakers
earth protection
redundant standby equipment
software back up and restore.
Alarms may include:

audible alarms
on-screen display and monitoring systems
visual indicators.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
inspect new installation and verify compliance against installation plans
prepare acceptance schedule and test criteria
undertake relevant acceptance tests and analysis against specified performance criteria complying with all related OHS requirements and work practices.
Context of and specific resources for assessment
Assessment must ensure:
sites where acceptance tests may be conducted
use of testing equipment currently used in industry
relevant regulatory and equipment documentation.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct observation of the candidate undertaking acceptance tests
review of reports and plans completed by the candidate for different scenarios and situations
oral or written questioning to assess knowledge of tests and inspections types of systems and applications
review of a completed acceptance documentation for systems and equipment prepared by the candidate including recommendations.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:
ICTTEN5059A Commission telecommunications network equipment
ICTTEN5092A Undertake planned outage management.

Aboriginal people and other people from a non-English speaking background may have second language issues.

Access must be provided to appropriate learning and assessment support when required.

Assessment processes and techniques must be culturally appropriate, and appropriate to the oral communication skill level, and language and literacy capacity of the candidate and the work being performed.

In all cases where practical assessment is used it will be combined with targeted questioning to assess required knowledge. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency.

Where applicable, physical resources should include equipment modified for people with special needs.
Replaced By
State Code National Code Title Type
AWD16 ICTTEN504 Acceptance test new systems and equipment Unit of competency
No information