Unit of competency Outline

Date retreived
22/07/2026 4:01 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Licence to operate a concrete placing boom

Licence to operate a concrete placing boom

Unit of competency
National Code
CPCCLBM3001A
State Code
W9422
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040399 - Building, N.e.c.
Original Release Date
20/06/2014
Nominal Hours
160
Description
This unit specifies the outcomes required to operate a concrete placing boom which is a mobile truck mounted plant incorporating a knuckle boom, capable of power operated slewing and luffing to place concrete by way of pumping through a pipeline attached to, or forming part of, the boom of the plant for licensing purposes.
Notes
Elements and Performance Criteria
1. Set up and prepare for operation.
  • 1.1. Ground suitability is inspected and checked.
  • 1.2. Concrete placing boom is driven to or located at work area according to procedures.
  • 1.3. Concrete placing boom is positioned for work application and stability according to procedures.
  • 1.4. Concrete placing boom is started according to procedures and checked for any abnormal noise.
  • 1.5. All safety devices are tested according to procedures.
  • 1.6. Post start operational checks are carried out according to procedures.
  • 1.7. Delivery system components, including booms, lines and adaptors, are positioned securely and safely according to procedures.
  • 1.8. Appropriate hazard prevention/control measures are applied to the work area according to procedures.
  • 1.9. Pumping systems are tested and prepared for use according to procedures.
2. Deliver concrete.
  • 2.1. Supply of bulk concrete to the hopper is coordinated safely with the supply vehicle operator/s.
  • 2.2. Concrete placing boom is operated safely using relevant boom movements to deliver the concrete as required.
  • 2.3. Safe operating techniques are applied for all operations.
  • 2.4. Communication signals are correctly interpreted according to the appropriate standard.
  • 2.5. Monitor boom movement constantly ensuring safety of personnel, delivery hose and stability.
  • 2.6. Unplanned and/or unsafe situations are responded to in line with procedures.
  • 2.7. Concrete placing boom is safely withdrawn from the work area at the completion of the delivery task.
3. Shut down and secure concrete placing boom.
  • 3.1. Delivery lines and hopper are cleaned out according to procedures.
  • 3.2. Boom is correctly stowed and secured for travel according to procedures.
  • 3.3. Outriggers/stabilisers are stowed and secured according to procedures.
  • 3.4. Plates or packing are stowed and secured for travel.
  • 3.5. Concrete placing boom is shut down according to procedures.
  • 3.6. Routine post-operational equipment checks are carried out according to procedures.
  • 3.7. All defects and damage are reported and recorded according to procedures and appropriate action is taken.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Hazards may include but not limited to:
ground stability (eg. ground condition, recently filled trenches, slopes)
overhead hazards (eg. power lines, service pipes)
insufficient lighting
traffic (eg. pedestrians, vehicles, other plant)
environmental conditions (eg. wind, lightning, storms)
other specific hazards (eg. dangerous materials).
Hazard control measures:
Refers to the systematic process of eliminating or reducing the risk to personnel and property through the application of controls.
It includes the application of the hierarchy of control, the six-step preference of control measures to manage and control risk:
elimination
substitution
isolation
engineering control measures
using safe work practices
personal protective equipment.
Appropriate standards may include:
codes of practice
legislation
Australian Standards,
manufacturer's specifications
industry standards (where applicable).
Concrete placing boom may include:
a mobile truck mounted plant incorporating a knuckle boom, capable of power operated slewing and luffing to place concrete by way of pumping through a pipeline attached to, or forming part of, the boom of the plant.
Communication methods may include but not limited to:
verbal and non-verbal language
written instructions
signage
hand signals
listening
questioning to confirm understanding
appropriate worksite protocol.
Appropriate personnel may include but are not limited to:
those associated with the operations of the concrete placing boom
supervisors
suppliers
clients
colleagues
managers.
Procedures may include but are not limited to:
manufacturer's guidelines (range chart, instructions, specifications or checklists)
industry operating procedures
workplace procedures (work instructions, operating procedures, checklists).
Service logbook may include but is not limited to:
any logbook
service book
history record system where the service and maintenance history is kept.
Hoppers may include but not limited to:
large receptacles mounted on the concrete placing boom which receive the concrete from supply vehicles and dispense the concrete to the pumping system.
Communication equipment may include but not limited to:
fixed channel two way radios
mobile phones.
NB: where radio communication equipment is used the transmitting frequencies of the equipment must be selected to prevent interference to or from other radio equipment being used in the vicinity of the crane.
Ground suitability may include but not limited to:
rough uneven ground
backfilled ground
soft soils
hard compacted soil
rock
bitumen
concrete.
Stability may include but not limited to:
deploying outriggers
establish correct size plates or packing
correctly position plates or packing.
Safety devices may include but not limited to:
horns/sirens
audible and visual reversing devices
operator restraint devices (where applicable)
lights
safety interlocks.
Hazard prevention/control measures may include but not limited to:
safety tags on electrical switches/isolators
powerlines are insulated
safety observer used inside exclusion zone
power disconnected
traffic barricades and control
pedestrian barricades
trench covers
movement of obstructions
personal protective equipment
adequate lighting
earth chain.
Supply vehicle may include but not limited to:
cement mixer trucks
agitator trucks
other concrete transport vehicles.
Relevant boom movements may include but not limited to:
raising boom
lowering boom
slewing
knuckling.
Safe operating techniques may include but not limited to:
achieving a safe optimum output from the concrete delivery system within the manufacturers design specifications
ensuring hopper levels are maintained at safe and recommended levels
safe operation of the boom to ensure safety of operator and other personnel
managing engine power to ensure efficiency of concrete pump truck platform movements and to minimise damage to the engine and gears
coordinating engine power with gear selection ensuring smooth transition and operation within torque range.
Communication signals may include but not limited to:
boom up - hand
boom down - hand
boom left - hand
boom right - hand
open or extend boom -hand
close or retract boom - hand
stop boom - hand
start pump speed up - hand
slow pump down - hand
little bit - hand
add water - hand
all done clean-up - hand.
Unplanned and/or unsafe situations may include but not limited to:
failure/lose of control e.g. blown hose or concrete line
failure of equipment e.g. hydraulic system
environmental conditions (e.g. wind, lightning, storms, etc).
Shut down may include but is not limited to:
retracting boom
positioning/securing boom
retracting outriggers/stabilisers
idle engine to stabilise temperature
disengage PTO (where applicable)
turning off engine (where applicable)
remove key from ignition (where applicable)
lock and secure cabin (where applicable).
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Successful assessment of this unit meets the competency requirement of the National Standard for licensing Persons Performing High Risk Work.
State/Territory OHS regulators have mandated the use of Assessment Instruments and Instructions for Assessment for this unit which have been endorsed by the national body responsible for OHS matters.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
comply with OHS licensing legislation
assess ground conditions to confirm that the site is suitable (e.g. firm, level and safe) to erect the concrete placing boom.
assess risk and hazard control strategies, including hierarchy of control as applied to the positioning and safe operation of the concrete placing boom (particular awareness of the risks associated with overhead powerlines/electrical cables, ground conditions, wind, pedestrians and tipping)
complete the pre operational check, positioning, stabilising, set up, operation, post operational checks of a concrete placing boom including all functions to their maximum extension in the moving of the boom and placement of concrete to the safe working rated capacity of the concrete placing boom
operate the concrete placing boom in conjunction with other appropriate personnel (where applicable).
Context of and specific resources for assessment
Assessment of the safe and effective application of knowledge and skill to workplace tasks (performance) must be undertaken using the endorsed Assessment Instrument
Assessment of performance must be undertaken either in the workplace or in a realistically simulated workplace setting
Assessors must ensure that the assessment in the workplace is organised to ensure that all the required equipment and materials and a suitable working area is made available to suit the assessment and the workplace
Assessment must occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment is to comply with relevant appropriate standard requirements
Applicants must have access to:
personal protective equipment (PPE) for the purpose of the Performance Assessment
appropriate concrete placing boom and associated equipment in safe condition
communication equipment (e.g. two way radios, etc) where appropriate
other appropriate personnel to direct the placement of concrete (where applicable).
Method of assessment
Assessment must be conducted using the endorsed Assessment Instruments. These Instruments provide advice on their application.
The use of 'simulators' in the assessment of this unit of competency is not acceptable.
Assessment may be in conjunction with the assessment of other units of competency.
Assessment methods must confirm consistency and accuracy of performance together with application of underpinning knowledge.
Assessment must confirm a reasonable inference that competency is not only able to be satisfied under the particular circumstance, but is able to be transferred to other circumstances.
Guidance information for assessment
Further information about endorsed Assessment Instruments may be obtained from state/territory OHS regulators.
Replaced By
State Code National Code Title Type
AUX82 CPCCLBM3001 Licence to operate a concrete placing boom Unit of competency
State Code National Code Title Type
J784 CPC30313 Certificate III in Concreting Qualification