Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Apply land and planning law to surveying
Apply land and planning law to surveying
Unit of competency
National Code
CPPSIS5051A
CPPSIS5051A
State Code
WE806
WE806
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
25/10/2013
Field of Education
031101 - Surveying
Original Release Date
25/10/2013
Nominal Hours
60
Description
This unit of competency specifies the outcomes required to assist surveyors to mark out urban structures and to identify urban lots and the improvements thereon. It requires the ability to determine land and planning law, collect and write specifications for appropriate documentation, and compile a plan to an approving authority suitable to accompany a development application. Functions would be carried out within organisational guidelines.
Notes
Elements and Performance Criteria
1 Determine azimuth for identification and re-mark surveys.
- 1.1 Accurate research and action are undertaken in priority order to obtain required information.
- 1.2 Survey marks are located as indicated on the survey plan.
- 1.3 Position of a parcel of land corners is established from survey marks found.
- 1.4 A right on boundary or parallel azimuth is established.
- 1.5 Monumented and non-monumented occupations are used to establish an azimuth parallel to a street boundary.
- 1.6 An assumed azimuth is adopted to enable completion of the field survey, and subsequent calculations and adjustments to swing onto the azimuth are made.
- 1.7 An azimuth derived from marks at opposite extremities of the survey is calculated.
- 1.8 Relationship between alignment marks, kerb lines, kerb as laid and occupations is interpreted when an azimuth is fixed using alignment marks, occupations and kerbs shown in alignment plans.
2 Undertake a mark-out survey and fix front and rear corners, angles and line marks.
- 2.1 An azimuth is established by direct or indirect means and the front corners of an allotment are fixed.
- 2.2 A side fix is established for the allotment using occupations, monuments or reference marks.
- 2.3 Direct methods are used to establish the positions of the rear corners.
- 2.4 Traverse and calculations from the street azimuth and side fix are made to set out rear corners by indirect means.
- 2.5 Need to use line marks on long or obstructed boundaries is identified.
- 2.6 A suitable checking procedure to validate positioning of all marks placed is undertaken.
3 Meet local government building requirements.
- 3.1 Re-mark surveys and local government siting requirements for the issue of a building certificate are met.
- 3.2 Relevant survey regulations relating to supervision of surveys, field procedures and survey searching are adhered to.
- 3.3 Relevant survey regulations relating to accuracy of cadastral surveys, field procedures and survey searching are adhered to.
- 3.4 Field notes are prepared according to OHS and legislative requirements, and organisational guidelines.
- 3.5 Pertinent legal and statutory standards are considered and adhered to.
4 Calculate an identification survey.
- 4.1 Position of improvements in relation to the boundaries is calculated using indirect methods (radiations), direct methods or a coordinate system.
- 4.2 Position of improvements in relation to the boundaries or set out buildings is calculated using a coordinate system.
5 Prepare a draft survey report.
- 5.1 A draft survey report is prepared in a clear and concise manner to minimise the need for follow-up action.
- 5.2 A sketch is prepared to accompany a survey report according to organisational guidelines.
- 5.3 A draft survey report and accompanying sketch is prepared for a re-mark survey.
- 5.4 Physical constraints and environmental impacts of the development are incorporated into the report.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the performance criteria is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Information may include:
boundary dimensions
design information:
digital
hard copy plans
maps
written instructions
instruction
land title
topographic features.
Survey plan may include:
alteration of the following:
existing services
existing utility services
typical utility service allocations
design engineering criteria requirements for the following:
crossfalls
cul de sacs
cycleways
gradients
intersections
kerb returns
road widths
theory notes
design methods using contours information
detail assessment of an approved set of examinations
engineering design requirements for the following:
lot drainage
road pavement drainage
location of utility services within the footpath area and to proposed lots
preparation of :
information to be shown
plan types
preliminary design plans
provision for alteration of existing services for the following:
easement requirements
public reserve requirements
sediment control
typical utility service allocations
provision for sewerage
typical drafting standards for plans.
Azimuthrefers to:
a direction expressed as a horizontal angle, usually in degrees and measured clockwise from a reference datum, which determines if the azimuth is a true magnetic or relative.
Monumented and nonmonumented occupations mean:
monumented: instruments on reference marks (RMs) or permanent marks (PMs)
non-monumented: no instruments on RMs or PMs.
Direct methods may include:
offset
parallelograms.
Traverse refers to:
a method of surveying in which lengths and directions of lines between points on the earth are obtained by or from field measurements and are used in determining positions of the points.
Cadastral survey refers to:
a survey of the boundaries of land parcels.
OHS may include:
Australian standards
development of site safety plans
identification of potential hazards
inspection of work sites
training staff in OHS requirements
use of equipment and signage.
Legislative requirements may include:
Australian standards
award and enterprise agreements
certification requirements
codes of practice
national industry standards
quality assurance requirements
set back requirements.
Organisational guidelines may include:
appropriate timelines
code of ethics
company policy
final product formats
formal design parameters
legislation relevant to the work or service function
manuals
OHS policy and procedures
personnel practices and guidelines outlining teamwork, work roles, responsibilities and delegations
requirements for data processing.
Legal and statutory may include:
aspects of cadastral law
common law and old system title
community title
crown land, alienation and native title
local government requirements
national standards
state statutes and regulations
subdivisions and deposited plans (including roads)
Torrens title system (indefeasibility and the need for registration), including:
caveat dealing
covenant dealing
easement dealing
lease dealing
mortgage dealing.
Physical constraints may include:
drainage, including:
lot drainage
road pavement drainage
easements
public reserve requirements
sediment control
sewerage control.
Information may include:
boundary dimensions
design information:
digital
hard copy plans
maps
written instructions
instruction
land title
topographic features.
Survey plan may include:
alteration of the following:
existing services
existing utility services
typical utility service allocations
design engineering criteria requirements for the following:
crossfalls
cul de sacs
cycleways
gradients
intersections
kerb returns
road widths
theory notes
design methods using contours information
detail assessment of an approved set of examinations
engineering design requirements for the following:
lot drainage
road pavement drainage
location of utility services within the footpath area and to proposed lots
preparation of :
information to be shown
plan types
preliminary design plans
provision for alteration of existing services for the following:
easement requirements
public reserve requirements
sediment control
typical utility service allocations
provision for sewerage
typical drafting standards for plans.
Azimuthrefers to:
a direction expressed as a horizontal angle, usually in degrees and measured clockwise from a reference datum, which determines if the azimuth is a true magnetic or relative.
Monumented and nonmonumented occupations mean:
monumented: instruments on reference marks (RMs) or permanent marks (PMs)
non-monumented: no instruments on RMs or PMs.
Direct methods may include:
offset
parallelograms.
Traverse refers to:
a method of surveying in which lengths and directions of lines between points on the earth are obtained by or from field measurements and are used in determining positions of the points.
Cadastral survey refers to:
a survey of the boundaries of land parcels.
OHS may include:
Australian standards
development of site safety plans
identification of potential hazards
inspection of work sites
training staff in OHS requirements
use of equipment and signage.
Legislative requirements may include:
Australian standards
award and enterprise agreements
certification requirements
codes of practice
national industry standards
quality assurance requirements
set back requirements.
Organisational guidelines may include:
appropriate timelines
code of ethics
company policy
final product formats
formal design parameters
legislation relevant to the work or service function
manuals
OHS policy and procedures
personnel practices and guidelines outlining teamwork, work roles, responsibilities and delegations
requirements for data processing.
Legal and statutory may include:
aspects of cadastral law
common law and old system title
community title
crown land, alienation and native title
local government requirements
national standards
state statutes and regulations
subdivisions and deposited plans (including roads)
Torrens title system (indefeasibility and the need for registration), including:
caveat dealing
covenant dealing
easement dealing
lease dealing
mortgage dealing.
Physical constraints may include:
drainage, including:
lot drainage
road pavement drainage
easements
public reserve requirements
sediment control
sewerage control.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the Assessment Guidelines for this Training Package.
Overview of assessment
This unit of competency could be assessed on its own or in combination with other units relevant to the job function, for example CPPSIS5044A Develop a subdivision survey design for local government approval.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
applying mark-out survey processes
meeting local government building requirements
matching objectives with resources
preparing a draft survey report
recording non-conformity aspects and outcomes
knowledge of surveying as it applies to planning law.
Specific resources for assessment
Resource implications for assessment include access to:
assessment instruments, including personal planner and assessment record book
assignment instructions, work plans and schedules, policy documents and duty statements
registered training provider of assessment services
relevant guidelines, regulations and codes of practice
suitable venue and equipment.
Access must be provided to appropriate learning and assessment support when required.
Where applicable, physical resources should include equipment modified for people with disabilities.
Context of assessment
Holistic: based on the performance criteria, evidence guide, range statement, and required skills and knowledge.
Method of assessment
Demonstrated over a period of time and observed by the assessor (or assessment team working together to conduct the assessment).
Demonstrated competency in a range of situations, that may include customer/workplace interruptions and involvement in related activities normally experienced in the workplace.
Obtained by observing activities in the field and reviewing induction information. If this is not practicable, observation in realistic simulated environments may be substituted.
Guidance information for assessment
Assessment requires that the clients’ objectives and industry expectations are met. If the clients’ objectives are narrowly defined or not representative of industry needs, it may be necessary to refer to portfolio case studies of a variety of SIS requirements to assess competency.
Oral questioning or written assessment and hypothetical situations (scenarios) may be used to assess underpinning knowledge (in assessment situations where the candidate is offered a preference between oral questioning or written assessment, questions are to be identical).
Supplementary evidence may be obtained from relevant authenticated correspondence from existing supervisors, team leaders or specialist training staff.
All practical demonstration must adhere to the safety and environmental regulations relevant to each State or Territory.
Where assessment is for the purpose of recognition (recognition of current competencies [RCC] or recognition of prior learning [RPL]), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time.
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge.
Assessment processes will be appropriate to the language and literacy levels of the candidate and any cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.
Overview of assessment
This unit of competency could be assessed on its own or in combination with other units relevant to the job function, for example CPPSIS5044A Develop a subdivision survey design for local government approval.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
applying mark-out survey processes
meeting local government building requirements
matching objectives with resources
preparing a draft survey report
recording non-conformity aspects and outcomes
knowledge of surveying as it applies to planning law.
Specific resources for assessment
Resource implications for assessment include access to:
assessment instruments, including personal planner and assessment record book
assignment instructions, work plans and schedules, policy documents and duty statements
registered training provider of assessment services
relevant guidelines, regulations and codes of practice
suitable venue and equipment.
Access must be provided to appropriate learning and assessment support when required.
Where applicable, physical resources should include equipment modified for people with disabilities.
Context of assessment
Holistic: based on the performance criteria, evidence guide, range statement, and required skills and knowledge.
Method of assessment
Demonstrated over a period of time and observed by the assessor (or assessment team working together to conduct the assessment).
Demonstrated competency in a range of situations, that may include customer/workplace interruptions and involvement in related activities normally experienced in the workplace.
Obtained by observing activities in the field and reviewing induction information. If this is not practicable, observation in realistic simulated environments may be substituted.
Guidance information for assessment
Assessment requires that the clients’ objectives and industry expectations are met. If the clients’ objectives are narrowly defined or not representative of industry needs, it may be necessary to refer to portfolio case studies of a variety of SIS requirements to assess competency.
Oral questioning or written assessment and hypothetical situations (scenarios) may be used to assess underpinning knowledge (in assessment situations where the candidate is offered a preference between oral questioning or written assessment, questions are to be identical).
Supplementary evidence may be obtained from relevant authenticated correspondence from existing supervisors, team leaders or specialist training staff.
All practical demonstration must adhere to the safety and environmental regulations relevant to each State or Territory.
Where assessment is for the purpose of recognition (recognition of current competencies [RCC] or recognition of prior learning [RPL]), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time.
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge.
Assessment processes will be appropriate to the language and literacy levels of the candidate and any cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D1531 | CPPSIS5021A | Apply land and planning law to surveying | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AXF90 | CPPSIS5051 | Apply land and planning law to surveying | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AB519 | CPPSS00002 | Apply Planning Law to Surveying Skill Set | Skill set |
| J360 | CPP60312 | Advanced Diploma of Surveying | Qualification |
| J357 | CPP50112 | Diploma of Surveying | Qualification |